RoofUnder Construction41p · 3 filings · 20 docs
ArchitectureDMStructural
Issued Permit Scope
General Construction · Structural
INTERIOR RENOVATION OF APT 2A AND 4A. PARTITION CHANGES AS PER PLANS. INSTALLATION OF NEW WINDOWS AND SKYLIGHTS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
18 documents · 1 drawing sheet
PLUMBING WORK IN APT 2C, 2D, 4D, 1A, 3A, 4C, AND GB AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
55 documents · 1 drawing sheet
PLUMBING WORK IN APT 1C, 3C, 4B AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
19 documents · 4 drawing sheets
Floor 4Unit 4A, Unit 4B, Unit 4C +1Under Construction55p · 4 filings · 20 docs
ArchitectureDMPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
INTERIOR RENOVATION OF APT 2A AND 4A. PARTITION CHANGES AS PER PLANS. INSTALLATION OF NEW WINDOWS AND SKYLIGHTS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
18 documents · 1 drawing sheet
PLUMBING WORK IN APT 2C, 2D, 4D, 1A, 3A, 4C, AND GB AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
55 documents
PLUMBING WORK IN APT 1C, 3C, 4B AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
19 documents · 5 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 3Unit 3A, Unit 3C, Unit 3DUnder Construction49p · 5 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
INTERIOR RENOVATION OF APT 2A AND 4A. PARTITION CHANGES AS PER PLANS. INSTALLATION OF NEW WINDOWS AND SKYLIGHTS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
18 documents
PLUMBING WORK IN APT 2C, 2D, 4D, 1A, 3A, 4C, AND GB AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
55 documents
PLUMBING WORK IN APT 1C, 3C, 4B AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
19 documents
Latest 3 of 5 filings on this floor.
Floor 2Unit 2A, Unit 2C, Unit 2DUnder Construction49p · 4 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
INTERIOR RENOVATION OF APT 2A AND 4A. PARTITION CHANGES AS PER PLANS. INSTALLATION OF NEW WINDOWS AND SKYLIGHTS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
18 documents
PLUMBING WORK IN APT 2C, 2D, 4D, 1A, 3A, 4C, AND GB AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
55 documents
PLUMBING WORK IN APT 1C, 3C, 4B AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
19 documents
Latest 3 of 4 filings on this floor.
Floor 1Unit 1A, Unit 1B, Unit 1CUnder Construction43p · 4 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
PLUMBING WORK IN APT 2C, 2D, 4D, 1A, 3A, 4C, AND GB AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
55 documents
PLUMBING WORK IN APT 1C, 3C, 4B AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
19 documents
Scope of work includes select brick masonry repairs, localized facebrick replacement, brick and stone repointing, masonry coating, sealant renewal, and metal refinishing as shown on the drawings and as specified. No change in use, occupancy, or egress.
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
BasementBasement level sprinkler system installation3p · 2 filings · 20 docs
Fire ProtectionGeneralStructural
Herewith filing to install sprinkler booster pump and jockey pump into existing sprinkler system serving the public corridors of the building. No change to use, occupancy or egress associated with this application.
On file for this project
8 documents · 2 drawing sheets
PAA ON STRUCTURAL POSTS AT EXTERIOR RETAINING WALL AS INDICATED ON PLANS.
On file for this project
29 documents · 1 drawing sheet
Sub-BasementBasement level sprinkler system installationUnder Construction57p · 6 filings · 20 docs
ArchitectureFire ProtectionPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Sprinklers · Structural
INTERIOR RENOVATION OF APT 2A AND 4A. PARTITION CHANGES AS PER PLANS. INSTALLATION OF NEW WINDOWS AND SKYLIGHTS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
18 documents
PLUMBING WORK IN APT 2C, 2D, 4D, 1A, 3A, 4C, AND GB AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
55 documents
Herewith filing to install sprinkler booster pump and jockey pump into existing sprinkler system serving the public corridors of the building. No change to use, occupancy or egress associated with this application.
On file for this project
8 documents
Latest 3 of 6 filings on this floor.
Site & exteriorNon-illuminated entrance awning installation9p · 4 filings · 14 docs
ArchitectureEquipmentMechanical
Issued Permit Scope
General Construction · Sidewalk Shed · Supported Scaffold
NON-ILLUMINATED NON-ADVERTISING ACCESSORY ENTRANCE AWNING - 117. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
On file for this project
5 documents · 2 drawing sheets
Scope of work includes select brick masonry repairs, localized facebrick replacement, brick and stone repointing, masonry coating, sealant renewal, and metal refinishing as shown on the drawings and as specified. No change in use, occupancy, or egress.
On file for this project
5 documents · 3 drawing sheets
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
On file for this project
2 documents · 3 drawing sheets
Latest 3 of 4 filings on this floor.