← Back
BuildNYC
Two family frame
117 MONTGOMERY AVENUE
STATEN ISLAND · BIN 5000165
💬 Discuss this project
1925Year Built
2Stories
B2Building Class
C4-2Zoning
2,400 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Two family frame · 2,125 sf lot · 1.13 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 26p · 2 filings · 20 docs
Floor 16p · 2 filings · 20 docs
Cellar4p · 1 filing · 20 docs
Site & exterior3p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Sanark Consulting Engineering510/19/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sanark Consulting Engineering1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Skender & BenjaminGeneral Contractor407/08/2026
Tri City Mechanical GroupPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Sanark Consulting Engineering6824310/19/2023
Building Lifecycle
02/09/2026
Signed off — Alteration
HEREWITH IS THE FILING OT WORK TYPE FOR THE REPAIR OF AN EXISTING PORCH & BALCONY, RENO CELLAR, 1 & 2 FL. AS PER PLANS. NO CHANGE TO EXISTING USE, EGRESS, OCCUPANCY, PARKING, ACCESSIBILITY, OR FIRE RESISTANCE RATINGS IS PROPOSED UNDER THIS APPLICATION
S00800480-I1
12/11/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/07/2023
Signed off — Alteration
PLUMBING APPLICATION IN CONJUNCTION WITH APPLICATION #S00800480 AS PER PLANS.
S00842561-I1
11/06/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/27/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
53 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offFlavio Mechanical07/25/2023
DOB NOWGeneral ConstructionSigned-offSkender & Benjamin05/05/2023
DOB NOWGeneral ConstructionSigned-offSkender & Benjamin12/21/2022
1 project · most recent 11/30/2022
FiledStatusContractorScope
11/30/2022CompleteK-10 Electric—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
12/11/2023Pass-Final General Construction Non-Directive 14PassView ↗
11/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/27/2023Fail-Final General Construction Non-Directive 14FailView ↗
10/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/02/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/30/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
10/19/2023Concrete - Cast-In-PlaceREJEP KOLARspecial
10/19/2023Interior lighting powerREJEP KOLARenergy_progress
10/19/2023Fenestration and door U-factor and product ratingsREJEP KOLARenergy_progress
10/19/2023Air barrier - visual inspectionREJEP KOLARenergy_progress
10/19/2023Lighting controlsREJEP KOLARenergy_progress
10/19/2023Insulation placement and R valuesREJEP KOLARenergy_progress
10/19/2023Exterior lighting powerREJEP KOLARenergy_progress
10/19/2023Lighting in dwelling unitsREJEP KOLARenergy_progress
10/19/2023HVAC-R and service water heating system controlsREJEP KOLARenergy_progress
10/19/2023Fenestration air leakageREJEP KOLARenergy_progress
10/19/2023Fenestration areasREJEP KOLARenergy_progress
10/19/2023HVAC-R and service water heating equipmentREJEP KOLARenergy_progress
10/19/2023Maintenance informationREJEP KOLARenergy_progress
10/19/2023Fire-Resistance Rated ConstructionREJEP KOLARprogress
10/19/2023Energy Code Compliance InspectionsREJEP KOLARprogress
10/19/2023Subgrade InspectionsREJEP KOLARspecial
10/19/2023Structural Stability – Alterations of existing buildingsREJEP KOLARspecial
10/19/2023Fire-Resistant Penetrations and JointsREJEP KOLARspecial
09/21/2023HVAC-R and service water piping design and insulationREJEP KOLARenergy_progress
09/21/2023Energy Code Compliance InspectionsREJEP KOLARprogress
09/21/2023HVAC-R and service water heating system controlsREJEP KOLARenergy_progress
09/21/2023Maintenance informationREJEP KOLARenergy_progress
09/21/2023HVAC-R and service water heating equipmentREJEP KOLARenergy_progress
08/31/2023Energy Code Compliance InspectionsREJEP KOLARprogress
08/31/2023HVAC-R and service water piping design and insulationREJEP KOLARenergy_progress
Latest 25 of 46.
33 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account