← Back
Elevator apt, fireproof without stores
EAST 229TH STREET
BRONX · Eastchester-Edenwald-Baychester · BIN 2094139
💬 Discuss this project
1951Year Built
14Stories
D3Building Class
R5Zoning
1,028,976 sfGross Floor Area
1,019Units
LL97 CoveredRent Stabilized124 Open Violations 112 unresolved · 12 paperwork only ▸FISP: No Report Filed
Elevator apt, fireproof without stores · Owner of record: CSA PRESERVATION PARTNERS LLC · 1,003,262 sf lot · 1.03 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivilGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 3 filings · 20 docs
Floor 14Under Construction93p · 1 filing · 20 docs
Floor 13Under Construction93p · 1 filing · 20 docs
Floor 12Under Construction93p · 1 filing · 20 docs
Floor 11Under Construction93p · 1 filing · 20 docs
Floor 10Under Construction93p · 1 filing · 20 docs
Floor 9Under Construction93p · 1 filing · 20 docs
Floor 8Under Construction93p · 1 filing · 20 docs
Floor 7Under Construction93p · 1 filing · 20 docs
Floor 6Under Construction93p · 1 filing · 20 docs
Floor 5Under Construction93p · 1 filing · 20 docs
Floor 4Under Construction93p · 1 filing · 20 docs
Floor 3Under Construction93p · 1 filing · 20 docs
Floor 2Under Construction93p · 1 filing · 20 docs
Floor 1Under Construction113p · 1 filing · 20 docs
CellarUnder Construction52p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK CITY HOUSING AUTHORITY1509/29/2026
CSA PRESERVATION PARTNERS LLC6209/01/2026
NYCHA1007/08/2026
NORTHROP GRUMMAN SYSTEMS CORP.607/08/2026
VIK XS SERVICES107/08/2026
NYC HOUSING AUTHORITY 9103/22/2026
NYC HOUSING AUTHORITY 1103/22/2026
NYC HOUSING AUTHORITY1403/22/2026
NYC HOUSING AUTH103/22/2026
NYCHA 99603/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSTRUCTION PERMIT SERVICES203/21/2026
AK CONSULTING SERVICES403/21/2026
JM ZONING, LLC.1603/21/2026
LOMBARDO BUILDING CONSULTANTS203/21/2026
A1 EXPEDITING SERVICE803/21/2026
JULIAN A. GOMEZ403/21/2026
Rigid Structural Design, LLC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROCKLEDGE SCAFFOLD CORPGeneral Contractor1109/01/2026
STEEL CONSTRUCTION LLCGeneral Contractor1007/08/2026
RIVER CITY BUILDERS LLCGeneral Contractor1007/19/2026
NIETO CONTRACTORS INCGeneral Contractor603/21/2026
4 BROTHERS & SONS FENCEGeneral Contractor403/21/2026
ENDRE BANYAElectrical103/21/2026
INPRO PLUMBING CORPPlumbing109/29/2026
VELEZ, CARLOSElectrical103/21/2026
L.E.C.INCGeneral Contractor107/08/2026
VIK XS SERVICES INCGeneral Contractor107/08/2026
HAY MECHANICAL SOLUTIONSPlumbing106/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS106908/17/2026
RAND ENGINEERING & ARCHIT266208/12/2025
LOMBARDO PROF ENGINEERING8566208/01/2024
THE MTM DESIGN GROUP, LLC1319211/05/2021
Building Lifecycle
All (191)Filed (26)Permit Issued (30)Signed Off (5)Facade (FISP) (16)Violation (59)Inspection (3)Objection (22)Special Inspection (30)
09/28/2026
Permit issued — Plumbing
X08053890-S1-PL
08/31/2026
Permit issued — Sidewalk Shed
X00924702-I1-SH
08/17/2026
Filed — Alteration
INTERIOR RENOVATION OF 14-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INSTALLATION OF NEW VENTILATION SYSTEMS, DEMOLITION OF EXISTING STEAM DOMESTIC HOT WATER EQUIPMENT AND ASSOCIATED PIPING; NO CHANGES TO USE, EGRESS, OR OCCUPANCY
X08053890-P6
08/12/2026
Cycle 10 facade report submitted
08/12/2026
Cycle 10 facade report signed — SAFE
08/11/2026
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
08/11/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
GEORGE GHEBRYAL
08/11/2026
Special inspection requirement — Fenestration areas
GEORGE GHEBRYAL
08/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
GEORGE GHEBRYAL
08/11/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
08/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
08/11/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/03/2026
Filed — Alteration
INTERIOR RENOVATION OF 14-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INSTALLATION OF NEW VENTILATION SYSTEMS, DEMOLITION OF EXISTING STEAM DOMESTIC HOT WATER EQUIPMENT AND ASSOCIATED PIPING; NO CHANGES TO USE, EGRESS, OR OCCUPANCY
X08053890-P5
07/27/2026
Cycle 10 facade inspection completed
07/21/2026
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
X01383946-I1
07/17/2026
Permit issued — Mechanical Systems
X08053890-S2-MS
06/18/2026
Permit issued — Suspended Scaffold
X08053890-S5-SC
06/16/2026
Filed — Alteration
INTERIOR RENOVATION OF 14-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INSTALLATION OF NEW VENTILATION SYSTEMS, DEMOLITION OF EXISTING STEAM DOMESTIC HOT WATER EQUIPMENT AND ASSOCIATED PIPING; NO CHANGES TO USE, EGRESS, OR OCCUPANCY
X08053890-S5
06/13/2026
Violation issued (HPD, closed)
B
06/13/2026
Violation issued (HPD, closed)
C
06/13/2026
Violation issued (HPD, closed)
A
06/13/2026
Violation issued (HPD, closed)
B
06/09/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/08/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
GEORGE GHEBRYAL
06/08/2026
Special inspection requirement — Fire-Resistance Rated Construction
GEORGE GHEBRYAL
06/08/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
06/08/2026
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
06/08/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
06/08/2026
Special inspection requirement — Fenestration areas
GEORGE GHEBRYAL
05/11/2026
Filed — Alteration
INTERIOR RENOVATION OF 14-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INSTALLATION OF NEW VENTILATION SYSTEMS, DEMOLITION OF EXISTING STEAM DOMESTIC HOT WATER EQUIPMENT AND ASSOCIATED PIPING; NO CHANGES TO USE, EGRESS, OR OCCUPANCY
X08053890-P4
04/22/2026
Permit issued — Suspended Scaffold
X01383946-I1-SC
04/21/2026
Objection raised — Admin
04/21/2026
Objection resolved — Addressed
04/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/10/2026
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
X01383946-I1
04/10/2026
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
04/10/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
04/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
GEORGE GHEBRYAL
04/10/2026
Special inspection requirement — Fenestration areas
GEORGE GHEBRYAL
04/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
04/10/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
GEORGE GHEBRYAL
04/01/2026
Permit issued — Plumbing
X08053890-S4-PL
02/05/2026
Permit issued — General Construction
X08053890-I1-GC
12/12/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/09/2025
Filed — Alteration
INTERIOR RENOVATION OF 14-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INSTALLATION OF NEW VENTILATION SYSTEMS, DEMOLITION OF EXISTING STEAM DOMESTIC HOT WATER EQUIPMENT AND ASSOCIATED PIPING; NO CHANGES TO USE, EGRESS, OR OCCUPANCY
X08053890-S3
12/01/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/13/2025
Signed off — Alteration
Limited Exterior Repairs & Roof Replacement not to include replacement of the entire underlying roof deck or assembly. No change to use, egress or occupancy.
X00885291-I1
09/22/2025
Filed — Alteration
INTERIOR RENOVATION OF 14-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INSTALLATION OF NEW VENTILATION SYSTEMS, DEMOLITION OF EXISTING STEAM DOMESTIC HOT WATER EQUIPMENT AND ASSOCIATED PIPING; NO CHANGES TO USE, EGRESS, OR OCCUPANCY
X08053890-P3
09/11/2025
Filed — Alteration
INTERIOR RENOVATION OF 14-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INSTALLATION OF NEW VENTILATION SYSTEMS, DEMOLITION OF EXISTING STEAM DOMESTIC HOT WATER EQUIPMENT AND ASSOCIATED PIPING; NO CHANGES TO USE, EGRESS, OR OCCUPANCY
X08053890-P2
09/09/2025
Permit issued — Construction Fence
X00924702-S1-FN
09/05/2025
Permit issued — Sidewalk Shed
X00924702-I1-SH
09/02/2025
Special inspection requirement — Final
John Monroe
09/02/2025
Special inspection requirement — Masonry
John Monroe
09/02/2025
Special inspection requirement — Post-installed Anchors
John Monroe
09/02/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
John Monroe
09/02/2025
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
08/27/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
08/27/2025
Special inspection requirement — Heating Systems
GEORGE GHEBRYAL
Latest 60 of 191 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedINPRO PLUMBING CORP09/28/2026
DOB NOWSidewalk ShedPermit IssuedROCKLEDGE SCAFFOLD CORP08/31/2026
DOB NOWMechanical SystemsPermit IssuedRIVER CITY BUILDERS LLC07/17/2026
DOB NOWSuspended ScaffoldPermit IssuedVIK XS SERVICES INC06/18/2026
DOB NOWSuspended ScaffoldPermit IssuedSTRUCTURAL PRESERVATION S04/22/2026
DOB NOWPlumbingPermit IssuedHAY MECHANICAL SOLUTIONS04/01/2026
DOB NOWGeneral ConstructionPermit IssuedRIVER CITY BUILDERS LLC02/05/2026
DOB NOWConstruction FencePermit IssuedROCKLEDGE SCAFFOLD CORP09/09/2025
DOB NOWSidewalk ShedPermit IssuedROCKLEDGE SCAFFOLD CORP09/05/2025
DOB NOWSuspended ScaffoldSigned-offNIETO CONTRACTORS INC03/04/2025
DOB NOWGeneral ConstructionPermit IssuedRIVER CITY BUILDERS LLC02/06/2025
DOB NOWGeneral ConstructionSigned-offRIVER CITY BUILDERS LLC02/05/2025
DOB NOWConstruction FencePermit Issued4 BROTHERS SONS FENCE10/31/2024
DOB NOWConstruction FencePermit IssuedROCKLEDGE SCAFFOLD CORP09/06/2024
DOB NOWSidewalk ShedPermit IssuedROCKLEDGE SCAFFOLD CORP09/06/2024
DOB NOWSuspended ScaffoldSigned-offNIETO CONTRACTORS INC07/30/2024
DOB NOWGeneral ConstructionPermit IssuedRIVER CITY BUILDERS LLC05/13/2024
DOB NOWGeneral ConstructionSigned-offRIVER CITY BUILDERS LLC05/13/2024
DOB NOWGeneral ConstructionSigned-offRIVER CITY BUILDERS LLC03/07/2024
DOB NOWGeneral ConstructionPermit IssuedRIVER CITY BUILDERS LLC02/05/2024
DOB NOWConstruction FencePermit Issued4 BROTHERS SONS FENCE10/26/2023
DOB NOWSidewalk ShedPermit IssuedROCKLEDGE SCAFFOLD CORP09/07/2023
DOB NOWConstruction FencePermit IssuedROCKLEDGE SCAFFOLD CORP09/06/2023
DOB NOWSidewalk ShedSigned-offSTEEL CONSTRUCTION LLC11/09/2022
DOB NOWConstruction FencePermit IssuedSTEEL CONSTRUCTION LLC11/09/2022
DOB NOWSidewalk ShedSigned-offSTEEL CONSTRUCTION LLC11/12/2021
DOB NOWConstruction FencePermit IssuedSTEEL CONSTRUCTION LLC11/12/2021
DOB NOWGeneral ConstructionSigned-offL.E.C.INC09/02/2021
DOB NOWConstruction FencePermit IssuedSTEEL CONSTRUCTION LLC05/24/2021
DOB NOWSidewalk ShedSigned-offSTEEL CONSTRUCTION LLC05/19/2021
BISEQISSUEDTECHNICO CONSTRUCTION02/27/2014
BISEQISSUEDTECHNICO CONSTRUCTION03/07/2013
BISOTISSUEDGEM-QUALITY CORP11/30/2012
BISEQISSUEDGEM-QUALITY CORP09/10/2012
BISEQISSUEDGEM-QUALITY CORP09/04/2012
BISEQISSUEDGEM-QUALITY CORP08/31/2012
BISEQISSUEDTECHNICO CONSTRUCTION03/14/2012
BISEQISSUEDTECHNICO CONSTRUCTION04/07/2011
BISEQISSUEDTECHNICO CONSTRUCTION06/02/2010
BISOTISSUEDTELCOM ENGINEERING GP INC03/11/2008
+ 6 more permits on file
1 project · most recent 08/17/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/17/2026Permit IssuedRIVER CITY BUILDERS LLCVentilation Systems
Ventilation
Greenheck EDJ 401 150 CFM · Exhaust Fan ×2
SQ-90-VG 150 CFM · Exhaust Fan ×2
1 project · most recent 08/17/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/17/2026Permit IssuedGM-PLUMBING CORP.Gas, Water/Sanitary
8 projects · most recent 07/08/2026
General Wiring
FiledStatusContractorScope
07/08/2026Permit IssuedMETRO TECH ELECTRICAL CORGeneral Wiring
06/25/2026Permit IssuedFIVE BOROUGH ELECTRIC INC—
12/11/2025Permit IssuedGM-POWER ELECTRIC CORPGeneral Wiring
08/12/2025Permit IssuedCAPONE ELECL CONTRS CORPGeneral Wiring
06/30/2025Permit IssuedCAPONE ELECL CONTRS CORP—
02/27/2024Permit IssuedSTAR ELEC'L CONTRACTORS C—
01/16/2024Permit IssuedANTHONY G FERRY INC—
07/27/2021Permit IssuedAMIN ELECTRICAL CORP—
1 project · most recent 08/17/2026
Concrete
FiledStatusContractorScope
08/17/2026Permit IssuedGM-PLUMBING CORP.Concrete
2 projects · most recent 09/19/2024
Fence Sidewalk Shed
FiledStatusContractorScope
09/19/2024Permit IssuedROCKLEDGE SCAFFOLD CORPFence, Sidewalk Shed
05/19/2021Permit IssuedSTEEL CONSTRUCTION LLCFence
1 project · most recent 04/10/2026
FiledStatusContractorScope
04/10/2026Permit IssuedSTRUCTURAL PRESERVATION S—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
12/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/01/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/16/2023Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
08/11/2026Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
08/11/2026Fenestration and door U-factor and product ratingsGEORGE GHEBRYALenergy_progress
08/11/2026Fenestration areasGEORGE GHEBRYALenergy_progress
08/11/2026Fire-Resistance Rated ConstructionGEORGE GHEBRYALprogress
08/11/2026FinalGEORGE GHEBRYALprogress
08/11/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
08/11/2026Tenant Protection Plan Compliance—special
08/05/2026Tenant Protection Plan Compliance—special
06/09/2026Tenant Protection Plan Compliance—special
06/08/2026Fenestration and door U-factor and product ratingsGEORGE GHEBRYALenergy_progress
06/08/2026Fire-Resistance Rated ConstructionGEORGE GHEBRYALprogress
06/08/2026FinalGEORGE GHEBRYALprogress
06/08/2026Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
06/08/2026Tenant Protection Plan Compliance—special
06/08/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
06/08/2026Fenestration areasGEORGE GHEBRYALenergy_progress
04/21/2026Tenant Protection Plan Compliance—special
04/10/2026Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
04/10/2026FinalGEORGE GHEBRYALprogress
04/10/2026Fire-Resistance Rated ConstructionGEORGE GHEBRYALprogress
04/10/2026Fenestration areasGEORGE GHEBRYALenergy_progress
04/10/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
04/10/2026Fenestration and door U-factor and product ratingsGEORGE GHEBRYALenergy_progress
09/02/2025FinalJohn Monroeprogress
09/02/2025MasonryJohn Monroespecial
Latest 25 of 44.
▾Documents — 265 on file (BIS + DOB NOW)
▸Plans & Drawings27
▸DOB NOWPlans/Sketch27
08/25/2026X00523687-I1Request digital key ↗
08/25/2026X00523730-I1Request digital key ↗
08/25/2026X00566067-I1Request digital key ↗
Showing 3 of 27 on file for this type
▸Applications & Permits22
▸BISWORK PERMIT APPLICATION13
03/05/2014220065426Open ↗
03/13/2013220065426Open ↗
12/04/2012220198505Open ↗
Showing 3 of 13 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION9
09/11/2012220223372Open ↗
09/05/2012220223381Open ↗
08/31/2012220199309Open ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram4
08/19/2026X08053890-I1Open ↗
08/19/2026X08053890-P4Open ↗
08/19/2026X08053890-P6Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications88
▸DOB NOWDPL-1: Design Professional Seal & Signature25
08/25/2026X00523730-I1Open ↗
08/25/2026X00566067-P1Open ↗
08/25/2026X00566067-I1Open ↗
Showing 3 of 25 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION24
12/04/2014220065426Open ↗
04/18/2014220198505Open ↗
03/28/2014220198505Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
08/26/2026X08053890-P4Open ↗
08/26/2026X08053890-P4Open ↗
08/26/2026X08053890-P4Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/01/2026X01086100-P1Open ↗
08/30/2026X01086100-I1Open ↗
08/26/2026X08053890-P4Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
09/11/2012220223372Open ↗
09/05/2012220223381Open ↗
08/31/2012220199309Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
09/11/2012220223372Open ↗
09/05/2012220223381Open ↗
08/31/2012220199309Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment4
▸BISSELF-CERT PLUMBING NOTICE3
04/29/2010220003029Open ↗
04/26/2010220003029Open ↗
04/19/2010220003029Open ↗
▸BISSCHEDULE B - PLUMBING1
04/27/2009220003029Open ↗
▸Environmental & Asbestos20
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/25/2026X00566067-I1Open ↗
08/25/2026X00566067-P1Open ↗
08/19/2026X08053890-S1Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
12/29/2014220065426Open ↗
06/02/2010220065426Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
03/03/2008210019433Open ↗
10/20/2007210019433Open ↗
▸BISASBESTOS INSPECTION REPORT1
04/27/2009220003029Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
03/28/2014220198505Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)1
03/28/2014220198505Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/22/2026X00885291-I1Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
03/28/2014220198505Open ↗
07/20/2012220198505Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/28/2014220198505Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
06/15/2023200296900Open ↗
06/15/2023200296900Open ↗
06/01/2023200296900Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs53
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter22
08/21/2026X01086100-I1Open ↗
08/19/2026X08053890-P4Open ↗
08/19/2026X08053890-I1Open ↗
Showing 3 of 22 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
06/16/2023200296900Open ↗
12/29/2014220065426Open ↗
12/04/2014220065426Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
03/05/2014220065426Open ↗
03/05/2014220065426Open ↗
03/13/2013220065426Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
09/11/2012220223372Open ↗
09/05/2012220223381Open ↗
08/31/2012220199309Open ↗
Showing 3 of 7 on file for this type
▸BISSHED LETTER2
03/14/2012220065426Open ↗
04/08/2011220065426Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/13/2026X00523687-I1Open ↗
08/13/2026X00523730-I1Open ↗
▸BISBSA-CPC APPROVAL1
12/23/2014220065426Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026X00885291-I1Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
03/28/2014220198505Open ↗
07/20/2012220198505Open ↗
07/29/2011220003029Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET5
09/11/2012220223372Open ↗
09/05/2012220223381Open ↗
08/31/2012220199309Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION2
02/12/2013220003029Open ↗
09/12/2012220003029Open ↗
▸Other Documents26
▸DOB NOWProof of Historic Building6
08/19/2026X08053890-I1Open ↗
08/19/2026X08053890-P4Open ↗
08/19/2026X08053890-P6Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSite Survey: Initial4
08/19/2026X08053890-I1Open ↗
08/19/2026X08053890-P4Open ↗
08/19/2026X08053890-P6Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/19/2026X08053890-I1Open ↗
08/19/2026X08053890-P4Open ↗
08/19/2026X08053890-P6Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlot Diagram4
08/19/2026X08053890-I1Open ↗
08/19/2026X08053890-P4Open ↗
08/19/2026X08053890-P6Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCalculations3
08/21/2026X01086100-I1Open ↗
08/19/2026X08053890-S5Open ↗
08/13/2026X01086100-P1Open ↗
▸DOB NOWManufacturer's Specifications3
08/21/2026X01086100-I1Open ↗
08/19/2026X08053890-S5Open ↗
08/13/2026X01086100-P1Open ↗
▸DOB NOWDOB Form (from plan PDF)1
08/16/2026X08053890-P1Open ↗
▸DOB NOWIRA Certification1
08/13/2026X01383946-I1Open ↗