← Back
BuildNYC
Primarily 3 family with 1 store or office
1173 LIBERTY AVENUE
BROOKLYN · BIN 3094084
💬 Discuss this project
1920Year Built
3Stories
S3Building Class
R5Zoning
4,725 sfGross Floor Area
4Units
Rent Stabilized4 Active Violations ▸FDNY Report ↗
Primarily 3 family with 1 store or office · Owner of record: 1173 Salie BH · 2,490 sf lot · 1.9 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 13 filings
Site & exterior3 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1173 Salie Liberty1310/02/2026
1173 Salie BH103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/10/2024$1.4M—— → —$296/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ryan Hung108/25/2026
Ozaeta Engineering101/23/2026
Gee2000 Architect212/15/2025
Sideris Kefalas Engineers112/10/2025
Bassiri311/04/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ecdesign Studio603/21/2026
Arnold Montag Architect AM PM Desi603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kale ConstructionGeneral Contractor303/21/2026
Synergy ConstructionGeneral Contractor207/08/2026
Joey Electrical CoElectrical103/21/2026
L.S. Sign CoSign hanger110/02/2026
AMC Plumbing, Heating & CLNGPlumbing107/08/2026
Commerical Plumbing SvcesPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Kadan5956101/23/2026
Gee2000 Architect691312/15/2025
Bassiri8394211/04/2024
Building Lifecycle
All (74)Filed (8)Permit Issued (6)Signed Off (3)Violation (12)Inspection (1)Objection (14)Special Inspection (30)
10/20/2026
Signed off — Alteration
B01429813-I1
09/04/2026
Permit issued — Sign
B01429813-I1-SG
08/25/2026
Filed — Alteration
B01429813-I1
08/25/2026
Special inspection requirement — Final
Ryan Hung
06/15/2026
Wwp. "observed unpermitted awning installation at expo 3 in the rear yard. Awning is fastened to the building facade, measuring approx. 12' wide c…
ECB violation · closed
06/08/2026
Permit issued — Mechanical Systems
B01308397-S2-MS
05/05/2026
Permit issued — Plumbing
B01308397-S3-PL
05/05/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
04/10/2026
Permit issued — General Construction
B01308397-I1-GC
04/06/2026
Objection resolved — Addressed
04/03/2026
Objection resolved — Addressed
03/30/2026
Objection resolved — Addressed
03/27/2026
Objection resolved — Addressed
02/06/2026
Objection raised — Structural
02/06/2026
Objection raised — Cost
02/03/2026
Objection raised — Cost
01/23/2026
Filed — Alteration
CREATE A NEW WALL OPENING AT THE FIRST FLOOR AT THE EXISTING PARTY WALL BETWEEN # 1169 AND 1173 AS SHOWN OF THE KEY PLAN
B01308397-S1
01/23/2026
Special inspection requirement — Structural Wood Frame
GEORGE OZAETA
01/21/2026
Special inspection requirement — Post-installed Anchors
GEORGE OZAETA
01/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE OZAETA
01/21/2026
Special inspection requirement — Concrete - Cast-In-Place
GEORGE OZAETA
01/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE OZAETA
01/21/2026
Special inspection requirement — Structural Steel - Details
GEORGE OZAETA
01/14/2026
Objection resolved — Addressed
01/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
PETER GEE
01/14/2026
Special inspection requirement — Energy Code Compliance Inspections
PETER GEE
01/07/2026
Objection resolved — Addressed
12/26/2025
Objection raised — Plumbing
12/26/2025
Objection raised — Admin
12/19/2025
Objection raised — Zoning
12/18/2025
Objection raised — Fire_Protection
12/18/2025
Objection raised — Admin
12/15/2025
Filed — Alteration
CREATE A NEW WALL OPENING AT THE FIRST FLOOR AT THE EXISTING PARTY WALL BETWEEN # 1169 AND 1173 AS SHOWN OF THE KEY PLAN
B01308397-S3
12/12/2025
Special inspection requirement — Tenant Protection Plan Compliance
PETER GEE
12/10/2025
Filed — Alteration
CREATE A NEW WALL OPENING AT THE FIRST FLOOR AT THE EXISTING PARTY WALL BETWEEN # 1169 AND 1173 AS SHOWN OF THE KEY PLAN
B01308397-S2
12/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
PETER GEE
12/09/2025
Filed — Alteration
CREATE A NEW WALL OPENING AT THE FIRST FLOOR AT THE EXISTING PARTY WALL BETWEEN # 1169 AND 1173 AS SHOWN OF THE KEY PLAN
B01308397-I1
12/04/2025
Special inspection requirement — Lighting controls
PETER GEE
12/04/2025
Special inspection requirement — Interior lighting power
PETER GEE
12/04/2025
Special inspection requirement — Energy Code Compliance Inspections
PETER GEE
12/04/2025
Special inspection requirement — Tenant Protection Plan Compliance
PETER GEE
12/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PETER GEE
11/18/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
11/15/2025
Special inspection requirement — Shutoff dampers
PETER GEE
11/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
PETER GEE
11/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PETER GEE
11/15/2025
Special inspection requirement — HVAC-R and service water heating system controls
PETER GEE
11/15/2025
Special inspection requirement — Maintenance information
PETER GEE
11/15/2025
Special inspection requirement — Duct leakage testing, insulation and design
PETER GEE
11/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
PETER GEE
11/13/2025
Special inspection requirement — Mechanical Systems
PETER GEE
11/13/2025
Special inspection requirement — Final
PETER GEE
10/24/2025
Special inspection requirement — Final
GEORGE OZAETA
10/24/2025
Special inspection requirement — Final
PETER GEE
06/10/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
03/24/2025
Signed off — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE IN FIRST FLOOR ONLY: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES. INSTALL NEW ADA TOILET AS PER PLAN.NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01127725-I1
03/18/2025
Signed off — Alteration
RESOLVE ECB VIOLATION:35362001H; RENOVATION OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR ONLY: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES.INSTALL NEW ADA TOILET AS PER PLAN. REMOVE AWNING AT STOREFRONT. NOCHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPL
B01127724-I1
03/18/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/26/2024
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
11/15/2024
Permit issued — General Construction
B01127724-I1-GC
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—L.S. Sign Co—
DOB NOW—Synergy Construction—
DOB NOW—Commerical Plumbing Svces—
DOB NOW—Synergy Construction—
DOB NOW—Kale Construction—
DOB NOW—AMC Plumbing, Heating & CLNG—
BIS—Precision Plumbing Services—
BIS—Precision Plumbing Services—
BIS—T & C Remodeling—
Nothing on file for this building.
Nothing on file for this building.
▾Documents — 61 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/26/2026B01429813-I1Request the plans ↗
08/23/2026B01127725-I1Request the plans ↗
08/23/2026B01127724-I1Request the plans ↗
Showing 3 of 8 on file for this type
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION5
04/05/2019321746474Open ↗
08/29/2012320282396Open ↗
05/11/2012320282396Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION3
05/06/2019321746474Open ↗
06/14/2011320282396Open ↗
06/14/2011320282396Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWRestrictive Declaration/Easement 11
08/18/2026B01308397-I1Open ↗
▸Seals & Professional Certifications26
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/26/2026B01429813-I1Open ↗
08/23/2026B01127725-I1Open ↗
08/23/2026B01127724-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
10/08/2026B01308397-S3Open ↗
09/23/2026B01429813-I1Open ↗
09/01/2026B01308397-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
10/08/2026B01308397-S3Open ↗
09/01/2026B01308397-I1Open ↗
08/26/2026B01308397-S2Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
07/23/2019321746474Open ↗
04/05/2019321746474Open ↗
03/30/2011320282396Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
04/05/2019321746474Open ↗
03/30/2011320282396Open ↗
▸Trade Schedules & Equipment6
▸BISSELF-CERT PLUMBING NOTICE3
10/17/2011320282396Open ↗
10/17/2011320282396Open ↗
10/12/2011320282396Open ↗
▸BISSCHEDULE B - PLUMBING2
05/24/2011320282396Open ↗
03/30/2011320282396Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
03/30/2011320282396Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/13/2026B01308397-S1Open ↗
08/13/2026B01308397-I1Open ↗
08/13/2026B01308397-S3Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/30/2011320282396Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
03/30/2011320282396Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
07/23/2019321746474Open ↗
04/05/2019321746474Open ↗
03/30/2011320282396Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET2
04/05/2019321746474Open ↗
03/30/2011320282396Open ↗
▸BISBOROUGH INTAKE FORM1
07/23/2019321746474Open ↗