← Back
Office with commercial, 1-6 stories
118-01 QUEENS BOULEVARD
QUEENS · BIN 4052809
💬 Discuss this project
1963Year Built
6Stories
O5Building Class
C4-2Zoning
88,300 sfGross Floor Area
0Units
LL97 Covered1 Open Violation ▸
Office with commercial, 1-6 stories · Owner of record: WHITEHALL TERRACE ASSOCIATES · 22,236 sf lot · 3.97 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof2p · 1 filing · 8 docs
Floor 31p · 1 filing · 3 docs
Floor 22p · 1 filing · 3 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WHITEHALL TERRACE ASSOCIATES7607/08/2026
ACE GROUP NY407/08/2026
NOVA CONSTRUCTION SERVICE803/22/2026
PICKMAN REALTY403/22/2026
1947 OCEAN AVE RTLY CO103/22/2026
MASTER FIRE SYSTEMS303/21/2026
MANTON HOLDING303/21/2026
TERRACE ASSOCIATION703/21/2026
CE TOWER303/21/2026
CE TOWERS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AGT ARCHITECTURE P.C.209/06/2024
FL&M ENGINEERING DESIGN &INSPECTION107/20/2023
MVN ARCHITECT LLC206/28/2023
EN-POWER GROUP103/12/2021
KZ ENGINEERING, P.C410/20/2020
M-E ENGINEERS201/08/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SYNERGY BUILDING CONSULTANTS403/21/2026
BURNHAM NATIONWIDE INC403/21/2026
SOMMA DESIGN CONSULTING403/21/2026
J A EXPEDITING203/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NOVA CONSTRUCTION SERVICEGeneral Contractor2407/08/2026
CUBE BUILDERS GROUP NYGeneral Contractor303/21/2026
DUMANI CONSTRUCTION INCGeneral Contractor303/21/2026
JA-TO BLDG CONTRACTORS INElectrical203/21/2026
VIVIANO, PAULElectrical203/21/2026
CRYSTAL COMFORT INCGeneral Contractor203/21/2026
PIPESTYLISTS, INCPlumbing107/08/2026
PESCATORE, PASQUALEElectrical103/21/2026
MCGARITY, JOHNElectrical103/21/2026
ELYSIUM CONSTRUCTION INCGeneral Contractor107/08/2026
LIMONGELLI ELECTRIC CORPElectrical103/22/2026
ADVANCED PLUMBING MECHPlumbing107/08/2026
ACE GROUP NY CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHIGUANG ARCHITECTURE P.C9279209/06/2024
GROUP-S LLC5216103/12/2021
RYAN SPECIAL ENGINEERING2018101/08/2020
Building Lifecycle
All (121)Filed (12)Permit Issued (19)Signed Off (6)Violation (60)Inspection (3)Objection (2)Special Inspection (19)
11/21/2024
Signed off — Alteration
INTERIOR RENOVATION OF COMMERCIAL SPACE INTO A BUBBLE TEA STORE, WORK INCLUDES KITCHEN EQUIPMENT INSTALLATION
Q01082645-S1
11/21/2024
Signed off — Alteration
INTERIOR RENOVATION OF COMMERCIAL SPACE INTO A BUBBLE TEA STORE, WORK INCLUDES KITCHEN EQUIPMENT INSTALLATION
Q01082645-I1
11/14/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/30/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/26/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/10/2024
Permit issued — Plumbing
Q01082645-S1-PL
09/06/2024
Filed — Alteration
INTERIOR RENOVATION OF COMMERCIAL SPACE INTO A BUBBLE TEA STORE, WORK INCLUDES KITCHEN EQUIPMENT INSTALLATION
Q01082645-S1
09/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shiguang Chen
08/06/2024
Permit issued — General Construction
Q01082645-I1-GC
07/18/2024
Filed — Alteration
INTERIOR RENOVATION OF COMMERCIAL SPACE INTO A BUBBLE TEA STORE, WORK INCLUDES KITCHEN EQUIPMENT INSTALLATION
Q01082645-I1
07/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shiguang Chen
07/17/2024
Special inspection requirement — Lighting controls
Shiguang Chen
07/17/2024
Special inspection requirement — Interior lighting power
Shiguang Chen
11/13/2023
Signed off — Alteration
install new modified bitumen roofing as per drawings filed herewith.
Q00886202-I1
07/20/2023
Filed — Alteration
Q00904889-I1
07/20/2023
Permit issued — Sidewalk Shed
Q00904889-I1-SH
07/12/2023
Signed off — Alteration
Q00168096-I1
07/12/2023
Permit issued — General Construction
Q00886202-I1-GC
06/28/2023
Filed — Alteration
install new modified bitumen roofing as per drawings filed herewith.
Q00886202-P1
06/27/2023
Special inspection requirement — Insulation placement and R values
Michael Notaro
06/27/2023
Special inspection requirement — Final
Michael Notaro
06/27/2023
Special inspection requirement — Preliminary
Michael Notaro
06/21/2023
Objection resolved — Addressed
06/20/2023
Objection raised — Other
06/13/2023
Filed — Alteration
install new modified bitumen roofing as per drawings filed herewith.
Q00886202-I1
02/03/2023
Signed off — Alteration
Q00198599-I1
08/21/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/27/2022
Permit issued — Supported Scaffold
Q00198599-I1-SF
05/27/2022
Permit issued — Sidewalk Shed
Q00168096-I1-SH
12/01/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/14/2021
Signed off — Alteration
FILING APPLICATION FOR REPLACEMENT OF COOLING TOWER. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00475001-I1
06/03/2021
Permit issued — Sidewalk Shed
Q00168096-I1-SH
06/03/2021
Permit issued — Supported Scaffold
Q00198599-I1-SF
04/29/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/22/2021
Permit issued — Mechanical Systems
Q00475001-I1-MS
03/12/2021
Filed — Alteration
FILING APPLICATION FOR REPLACEMENT OF COOLING TOWER. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00475001-I1
03/12/2021
Special inspection requirement — HVAC-R and service water heating system controls
MICHAEL SCORRANO
03/12/2021
Special inspection requirement — Energy Code Compliance Inspections
MICHAEL SCORRANO
03/12/2021
Special inspection requirement — Maintenance information
MICHAEL SCORRANO
03/12/2021
Special inspection requirement — Electrical motors and elevators
MICHAEL SCORRANO
03/12/2021
Special inspection requirement — HVAC-R and service water heating equipment
MICHAEL SCORRANO
02/23/2021
Special inspection requirement — Mechanical Systems
MICHAEL SCORRANO
02/23/2021
Special inspection requirement — Final
MICHAEL SCORRANO
12/21/2020
Permit issued — Sidewalk Shed
Q00168096-I1-SH
12/18/2020
Permit issued — Supported Scaffold
Q00198599-I1-SF
11/16/2020
Violation issued (ECB, closed)
Construction
11/16/2020
Violation issued (ECB, closed)
Construction
10/20/2020
Filed — Alteration
Q00168096-P1
10/20/2020
Filed — Alteration
Q00198599-P1
09/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/23/2020
Permit issued — Mechanical Systems
Q00277111-I1-MS
03/16/2020
Violation issued (ECB, closed)
Cranes and Derricks
03/16/2020
Violation issued (ECB, closed)
Construction
03/16/2020
Violation issued (ECB, closed)
Construction
03/16/2020
Violation issued (ECB, closed)
Construction
03/16/2020
Violation issued (ECB, closed)
Construction
03/16/2020
Violation issued (ECB, closed)
Construction
01/13/2020
Permit issued — Plumbing
Q00277145-I1-PL
01/08/2020
Filed — Alteration
Q00277145-I1
Latest 60 of 121 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offT & T PLUMBING INC09/10/2024
DOB NOWGeneral ConstructionSigned-offCUBE BUILDERS GROUP NY08/06/2024
DOB NOWSidewalk ShedPermit IssuedACE GROUP NY CORP07/20/2023
DOB NOWGeneral ConstructionSigned-offDUMANI CONSTRUCTION INC07/12/2023
DOB NOWSupported ScaffoldSigned-offNOVA CONSTRUCTION SERVICE05/27/2022
DOB NOWSidewalk ShedSigned-offNOVA CONSTRUCTION SERVICE05/27/2022
DOB NOWSidewalk ShedSigned-offNOVA CONSTRUCTION SERVICE06/03/2021
DOB NOWSupported ScaffoldSigned-offNOVA CONSTRUCTION SERVICE06/03/2021
DOB NOWMechanical SystemsSigned-offCRYSTAL COMFORT03/22/2021
DOB NOWSidewalk ShedSigned-offNOVA CONSTRUCTION SERVICE12/21/2020
DOB NOWSupported ScaffoldSigned-offNOVA CONSTRUCTION SERVICE12/18/2020
DOB NOWMechanical SystemsSigned-offELYSIUM CONSTRUCTION INC07/23/2020
DOB NOWPlumbingSigned-offADVANCED PLUMBING MECH01/13/2020
DOB NOWSupported ScaffoldSigned-offNOVA CONSTRUCTION SERVICE12/31/2019
DOB NOWSidewalk ShedSigned-offNOVA CONSTRUCTION SERVICE12/30/2019
DOB NOWSidewalk ShedSigned-offNOVA CONSTRUCTION SERVICE12/04/2019
DOB NOWSupported ScaffoldSigned-offNOVA CONSTRUCTION SERVICE12/03/2019
DOB NOWSupported ScaffoldSigned-offNOVA CONSTRUCTION SERVICE09/04/2019
DOB NOWSidewalk ShedSigned-offNOVA CONSTRUCTION SERVICE06/25/2019
BISOTISSUEDNOVA CONSTRUCTION SERVICE05/26/2022
BISEQISSUEDNOVA CONSTRUCTION SERVICE05/26/2022
BISEQISSUEDNOVA CONSTRUCTION SERVICE08/24/2021
BISOTISSUEDELYSIUM CONSTRUCTION INC01/26/2021
BISEQISSUEDNOVA CONSTRUCTION SERVICE01/05/2021
BISEQISSUEDNOVA CONSTRUCTION SERVICE08/24/2020
BISOTISSUEDNOVA CONSTRUCTION SERVICE07/09/2020
BISOTISSUEDELYSIUM CONSTRUCTION INC06/23/2020
BISEQISSUEDNOVA CONSTRUCTION SERVICE01/07/2020
BISOTISSUEDNOVA CONSTRUCTION SERVICE10/25/2019
BISOTISSUEDCOS CONSTRUCTION INC03/04/2019
BISOTISSUEDARCHHAMPTON INC12/18/2018
BISOTISSUEDARCHHAMPTON INC07/19/2018
BISPLISSUEDHP SERVICES INC03/08/2018
BISOTISSUEDCOS CONSTRUCTION INC03/08/2018
BISOTISSUED168 CONSTRUCTION CORP12/04/2017
BISOTISSUED168 CONSTRUCTION CORP05/26/2017
BIS—ISSUEDUNITECH DESIGN INC10/24/2016
BIS—ISSUEDUNITECH DESIGN INC10/24/2016
BIS—ISSUEDUNITECH DESIGN INC10/24/2016
BIS—ISSUEDUNITECH DESIGN INC10/24/2016
+ 29 more permits on file
5 projects · most recent 11/27/2024
General Wiring
FiledStatusContractorScope
11/27/2024CompleteVOLTRON ELECTRIC LLCGeneral Wiring
06/03/2021CompleteRESPONSE ELECTRIC INC.General Wiring
12/08/2020CompleteLIMONGELLI ELECTRIC CORPGeneral Wiring
10/29/2020CompleteLIMONGELLI ELECTRIC CORPGeneral Wiring
05/16/2019CompleteTOP SHELF ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/14/2024Pass-Final General Construction Non-Directive 14PassView ↗
10/30/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/26/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
09/06/2024Fire-Resistant Penetrations and JointsShiguang Chenspecial
07/17/2024Fire-Resistant Penetrations and JointsShiguang Chenspecial
07/17/2024Lighting controlsShiguang Chenenergy_progress
07/17/2024Interior lighting powerShiguang Chenenergy_progress
06/27/2023Insulation placement and R valuesMichael Notaroenergy_progress
06/27/2023FinalMichael Notaroprogress
06/27/2023PreliminaryMichael Notaroprogress
03/12/2021HVAC-R and service water heating system controlsMICHAEL SCORRANOenergy_progress
03/12/2021Energy Code Compliance InspectionsMICHAEL SCORRANOprogress
03/12/2021Maintenance informationMICHAEL SCORRANOenergy_progress
03/12/2021Electrical motors and elevatorsMICHAEL SCORRANOenergy_progress
03/12/2021HVAC-R and service water heating equipmentMICHAEL SCORRANOenergy_progress
02/23/2021Mechanical SystemsMICHAEL SCORRANOspecial
02/23/2021FinalMICHAEL SCORRANOprogress
12/06/2019Fire-Resistant Penetrations and JointsWilliam Ryanspecial
12/06/2019FinalWilliam Ryanprogress
12/06/2019HVAC insulation and sealing William Ryanenergy_progress
12/06/2019Post-installed AnchorsWilliam Ryanspecial
12/06/2019Mechanical SystemsWilliam Ryanspecial
▾Documents — 643 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch5
08/24/2026Q00886202-P1Request digital key ↗
08/24/2026Q00886202-I1Request digital key ↗
08/24/2026Q00904889-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
08/28/2026Q00198599-I1Request digital key ↗
08/28/2026Q00198599-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/28/2026Q00277111-I1Request digital key ↗
08/27/2026Q00475001-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
08/28/2026Q00168096-I1Request digital key ↗
08/15/2026Q00168096-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/28/2026Q00277145-I1Request digital key ↗
▸Applications & Permits115
▸BISWORK PERMIT APPLICATION55
08/24/2020440620259Open ↗
01/06/2020440580729Open ↗
10/25/2019440538429Open ↗
Showing 3 of 55 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION51
08/21/2020440620259Open ↗
01/06/2020440580729Open ↗
08/03/2019421936506Open ↗
Showing 3 of 51 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications5
04/10/2019421361868Open ↗
Showing 1 of 5 on file for this type
▸BISIntent to Revoke Approval/Permit4
11/15/2013420527914Open ↗
11/15/2013420527969Open ↗
Showing 2 of 4 on file for this type
▸Seals & Professional Certifications176
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION76
08/05/2019421936506Open ↗
08/05/2019421936506Open ↗
04/10/2019421361868Open ↗
Showing 3 of 76 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST32
08/05/2019421936506Open ↗
02/10/2017421421624Open ↗
10/26/2016421371189Open ↗
Showing 3 of 32 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/28/2026Q00168096-I1Open ↗
08/28/2026Q00168096-P1Open ↗
08/28/2026Q00198599-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026Q01082645-I1Open ↗
09/01/2026Q01082645-I1Open ↗
08/26/2026Q00475001-I1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT10
08/21/2020440620259Open ↗
01/06/2020440580729Open ↗
08/05/2019421936506Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026Q01082645-I1Open ↗
09/01/2026Q01082645-S1Open ↗
08/26/2026Q00475001-I1Open ↗
Showing 3 of 6 on file for this type
▸BISProfessional and Owner Certification (POC3)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/21/2020440620259Open ↗
01/06/2020440580729Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
08/21/2020440620259Open ↗
01/06/2020440580729Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
03/15/2019440538429Open ↗
▸Trade Schedules & Equipment12
▸BISSCHEDULE B - PLUMBING4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
02/05/2019421361868Open ↗
08/22/2016421361868Open ↗
▸BISSIGN HANGER CERTIFICATE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEQUIPMENT USE PERMITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSELF-CERT PLUMBING NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
04/25/2017421421624Open ↗
▸Environmental & Asbestos55
▸BISASBESTOS: CERTIFICATION (DEP ACP5)28
08/05/2019421936506Open ↗
10/26/2016421371189Open ↗
10/26/2016421367381Open ↗
Showing 3 of 28 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/28/2026Q00277145-I1Open ↗
08/28/2026Q00277111-I1Open ↗
08/21/2026Q01082645-S1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDEP ASBESTOS PROJECT CONDITIONAL COMPLETION FORM1
10/25/2019440538429Open ↗
▸BISAPPLICANT SHALL PROVIDE 2 ACP-21 FORMSPRIOR TO SIGN OFF: TRU1035QN191
05/15/2023440538429Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026Q00475001-I1Open ↗
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
08/05/2019421936506Open ↗
04/10/2019421361868Open ↗
06/05/2018421421624Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
04/10/2019421361868Open ↗
06/28/2018421421624Open ↗
04/14/2014420900573Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
10/25/2019440538429Open ↗
03/15/2019440538429Open ↗
03/15/2019440538429Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
05/12/2023440538429Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/12/2023440538429Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/12/2023440538429Open ↗
▸BISFENESTRATION AIR LEAKAGE1
05/12/2023440538429Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
05/12/2023440538429Open ↗
▸BISFENESTRATION AREAS1
05/12/2023440538429Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00475001-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00475001-I1Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY5
08/24/2020440620259Open ↗
08/21/2020440620259Open ↗
01/06/2020440580729Open ↗
Showing 3 of 5 on file for this type
▸BISPOST-INSTALLED ANCHORS1
05/12/2023440538429Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
05/12/2023440538429Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
05/13/2019421421624Open ↗
▸BISNOTIF-PROPOSED STEAM-HOT WATER INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
05/12/2023440538429Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
05/12/2023440538429Open ↗
▸BISMASONRY1
05/12/2023440538429Open ↗
▸Approvals, Objections & Sign-offs103
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST46
10/24/2025440620259Open ↗
05/15/2023440538429Open ↗
02/28/2023440580729Open ↗
Showing 3 of 46 on file for this type
▸BISADMINISTRATIVE OBJECTIONS36
10/26/2016421371189Open ↗
10/26/2016421367381Open ↗
10/26/2016421371170Open ↗
Showing 3 of 36 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION18
06/07/2018421421624Open ↗
06/07/2018421421624Open ↗
06/07/2018421421624Open ↗
Showing 3 of 18 on file for this type
▸BISFINAL3
05/12/2023440538429Open ↗
02/23/2023440580729Open ↗
02/01/2023440620259Open ↗
▸Cost, Insurance & Ownership80
▸BISCOST AFFIDAVIT79
08/05/2019421936506Open ↗
04/10/2019421361868Open ↗
03/15/2019440538429Open ↗
Showing 3 of 79 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
01/09/2023440538429Open ↗
▸Filing & Intake Forms48
▸BISEFILING COVER SHEET37
08/03/2019421936506Open ↗
01/30/2017421421624Open ↗
10/26/2016421371189Open ↗
Showing 3 of 37 on file for this type
▸BISADDITIONAL INFORMATION7
10/15/2019440538429Open ↗
04/19/2019440538429Open ↗
02/13/2019421361868Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
08/21/2020440620259Open ↗
01/06/2020440580729Open ↗
03/15/2019440538429Open ↗
▸BISBOROUGH INTAKE FORM1
05/17/2018421421624Open ↗
▸Other Documents5
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS3
01/24/2015420820561Open ↗
Showing 1 of 3 on file for this type
▸BISPRELIMINARY1
05/12/2023440538429Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
08/02/2018421421624Open ↗