← Back
Two stories - detached, small or mid-size
118-20 234 STREET
QUEENS · Cambria Heights · BIN 4275265
💬 Discuss this project
1945Year Built
2Stories
A1Building Class
R2AZoning
1,870 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,975 sf lot · 0.47 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof1p · 1 filing · 20 docs
Floor 21p · 1 filing · 6 docs
Floor 11p · 1 filing · 20 docs
Cellar2p · 1 filing · 20 docs
Site & exterior1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ASKON ARCHITECTS P C403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASKON ARCHITECTS, P.C.504/16/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UMOJA USA LLCGeneral Contractor207/08/2026
BT'S PLUMBING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASKON ARCHITECT, P.C.3596404/16/2025
Building Lifecycle
All (53)Filed (5)Permit Issued (3)Signed Off (2)Inspection (7)Objection (10)Special Inspection (26)
02/03/2026
Signed off — Alteration
FILING FOR PLUMBING WORK
Q00616741-I1
02/02/2026
Signed off — Alteration
Q00592984-I1
06/09/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/30/2025
Special inspection requirement — Protection of exposed foundation insulation
Akeeb Shekoni
04/30/2025
Special inspection requirement — Insulation placement and R values
Akeeb Shekoni
04/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Akeeb Shekoni
04/30/2025
Special inspection requirement — Concrete - Cast-In-Place
Akeeb Shekoni
04/30/2025
Special inspection requirement — Subgrade Inspections
Akeeb Shekoni
04/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Akeeb Shekoni
04/30/2025
Special inspection requirement — Fire-Resistance Rated Construction
Akeeb Shekoni
04/30/2025
Special inspection requirement — Energy Code Compliance Inspections
Akeeb Shekoni
04/30/2025
Special inspection requirement — Fenestration areas
Akeeb Shekoni
04/30/2025
Special inspection requirement — Fenestration air leakage
Akeeb Shekoni
04/30/2025
Special inspection requirement — Air barrier - visual inspection
Akeeb Shekoni
04/30/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Akeeb Shekoni
04/24/2025
Objection resolved — Addressed
04/22/2025
Objection raised — Scope
04/16/2025
Filed — Alteration CO
FILING FOR HORIZONTAL AND VERTICAL ENLARGEMENT OF EXISTING ONE FAMILY RESIDENCE. NEW CERTIFICATE OF OCCUPANCY IS REQUIRED
Q00538342-P3
04/04/2025
Special inspection requirement — Protection of exposed foundation insulation
Akeeb Shekoni
04/04/2025
Special inspection requirement — Concrete - Cast-In-Place
Akeeb Shekoni
04/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Akeeb Shekoni
04/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Akeeb Shekoni
04/04/2025
Special inspection requirement — Subgrade Inspections
Akeeb Shekoni
04/04/2025
Special inspection requirement — Energy Code Compliance Inspections
Akeeb Shekoni
04/04/2025
Special inspection requirement — Fire-Resistance Rated Construction
Akeeb Shekoni
04/04/2025
Special inspection requirement — Insulation placement and R values
Akeeb Shekoni
04/04/2025
Special inspection requirement — Air barrier - visual inspection
Akeeb Shekoni
04/04/2025
Special inspection requirement — Fenestration air leakage
Akeeb Shekoni
04/04/2025
Special inspection requirement — Fenestration areas
Akeeb Shekoni
04/04/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Akeeb Shekoni
01/02/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/26/2024
Objection resolved — Addressed
11/26/2024
Objection resolved — Addressed
11/08/2024
Objection resolved — Addressed
11/08/2024
Objection resolved — Addressed
11/01/2024
Objection raised — Other
11/01/2024
Objection raised — Inspections
11/01/2024
Objection raised — Scope
11/01/2024
Objection raised — Zoning
10/21/2024
Filed — Alteration CO
FILING FOR HORIZONTAL AND VERTICAL ENLARGEMENT OF EXISTING ONE FAMILY RESIDENCE. NEW CERTIFICATE OF OCCUPANCY IS REQUIRED
Q00538342-P1
05/04/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/03/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/28/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/19/2022
Permit issued — Plumbing
Q00616741-I1-PL
10/21/2021
Filed — Alteration
FILING FOR PLUMBING WORK
Q00616741-I1
10/21/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Akeeb Shekoni
10/21/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Akeeb Shekoni
10/14/2021
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/11/2021
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/27/2021
Permit issued — Construction Fence
Q00592984-I1-FN
09/13/2021
Filed — Alteration
Q00592984-I1
09/10/2021
Permit issued — General Construction
Q00538342-I1-GC
06/30/2021
Filed — Alteration CO
FILING FOR HORIZONTAL AND VERTICAL ENLARGEMENT OF EXISTING ONE FAMILY RESIDENCE. NEW CERTIFICATE OF OCCUPANCY IS REQUIRED
Q00538342-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offBT'S PLUMBING AND HEATING01/19/2022
DOB NOWConstruction FenceSigned-offUMOJA USA LLC09/27/2021
DOB NOWGeneral ConstructionPermit IssuedUMOJA USA LLC09/10/2021
2 projects · most recent 11/06/2025
General Wiring
FiledStatusContractorScope
11/06/2025CompletePOWER KEY ELECTRIC CORP.General Wiring
10/14/2021CompleteWGM ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
06/09/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/02/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/04/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/03/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/28/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/14/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/11/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
04/30/2025Protection of exposed foundation insulationAkeeb Shekonienergy_progress
04/30/2025Insulation placement and R valuesAkeeb Shekonienergy_progress
04/30/2025Structural Stability – Alterations of existing buildingsAkeeb Shekonispecial
04/30/2025Concrete - Cast-In-PlaceAkeeb Shekonispecial
04/30/2025Subgrade InspectionsAkeeb Shekonispecial
04/30/2025Fire-Resistant Penetrations and JointsAkeeb Shekonispecial
04/30/2025Fire-Resistance Rated ConstructionAkeeb Shekoniprogress
04/30/2025Energy Code Compliance InspectionsAkeeb Shekoniprogress
04/30/2025Fenestration areasAkeeb Shekonienergy_progress
04/30/2025Fenestration air leakageAkeeb Shekonienergy_progress
04/30/2025Air barrier - visual inspectionAkeeb Shekonienergy_progress
04/30/2025Fenestration and door U-factor and product ratingsAkeeb Shekonienergy_progress
04/04/2025Protection of exposed foundation insulationAkeeb Shekonienergy_progress
04/04/2025Concrete - Cast-In-PlaceAkeeb Shekonispecial
04/04/2025Fire-Resistant Penetrations and JointsAkeeb Shekonispecial
04/04/2025Structural Stability – Alterations of existing buildingsAkeeb Shekonispecial
04/04/2025Subgrade InspectionsAkeeb Shekonispecial
04/04/2025Energy Code Compliance InspectionsAkeeb Shekoniprogress
04/04/2025Fire-Resistance Rated ConstructionAkeeb Shekoniprogress
04/04/2025Insulation placement and R valuesAkeeb Shekonienergy_progress
04/04/2025Air barrier - visual inspectionAkeeb Shekonienergy_progress
04/04/2025Fenestration air leakageAkeeb Shekonienergy_progress
04/04/2025Fenestration areasAkeeb Shekonienergy_progress
04/04/2025Fenestration and door U-factor and product ratingsAkeeb Shekonienergy_progress
10/21/2021Fire-Resistant Penetrations and JointsAkeeb Shekonispecial
Latest 25 of 26.
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/27/2026Q00592984-I1Request digital key ↗
08/27/2026Q00616741-I1Request digital key ↗
08/20/2026Q00538342-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram4
08/20/2026Q00538342-P4Open ↗
08/13/2026Q00538342-P1Open ↗
08/13/2026Q00538342-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/20/2026Q00538342-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/27/2026Q00538342-P4Open ↗
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature7
09/14/2026Q00616741-I1Open ↗
08/27/2026Q00538342-I1Open ↗
08/27/2026Q00538342-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/20/2026Q00538342-P4Open ↗
08/13/2026Q00616741-I1Open ↗
08/13/2026Q00592984-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/14/2026Q00616741-I1Open ↗
08/27/2026Q00538342-I1Open ↗
08/24/2026Q00538342-P3Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/20/2026Q00538342-P4Open ↗
08/13/2026Q00538342-I1Open ↗
08/13/2026Q00538342-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/20/2026Q00538342-P4Open ↗
08/13/2026Q00538342-I1Open ↗
08/13/2026Q00538342-P3Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00538342-I1Open ↗
08/13/2026Q00616741-I1Open ↗
▸Other Documents13
▸DOB NOWSite Survey: Initial4
08/20/2026Q00538342-P4Open ↗
08/13/2026Q00538342-I1Open ↗
08/13/2026Q00538342-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/20/2026Q00538342-P4Open ↗
08/13/2026Q00538342-P3Open ↗
08/13/2026Q00538342-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlot Diagram4
08/20/2026Q00538342-P4Open ↗
08/13/2026Q00538342-I1Open ↗
08/13/2026Q00538342-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026Q00538342-I1Open ↗