← Back
BuildNYC
Two family converted from one family
118-36 MARSDEN STREET
QUEENS · BIN 4267820
💬 Discuss this project
1920Year Built
2Stories
B3Building Class
R3AZoning
2,380 sfGross Floor Area
2Units
1 Active Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Two family converted from one family · 3,400 sf lot · 0.7 FAR built · Flood zone X
Locations of Work
ElectricalGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 12 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Etrecte206/03/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Patriot Energy Solutions403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Patriot Energy Solspecialty_contractor303/21/2026
Cragton ConstructionGeneral Contractor105/31/2000
Theodore Wagner Plumbing, HeatingGeneral Contractor112/22/1999
Theodore Wagner Plumbing, HeatingPlumbing112/22/1999
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Etrecte8116206/03/2025
Building Lifecycle
03/12/2026
Signed off — Alteration
ROOFTOP SOLAR PANEL INSTALLATION
Q01043065-I1
06/03/2025
Filed — Alteration
ROOFTOP SOLAR PANEL INSTALLATION
Q01043065-P1
02/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
02/13/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
02/13/2025
Special inspection requirement — Energy Code Compliance Inspections
VYACHESLAV NECHAYEV
10 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offPatriot Energy Sol05/14/2024
BISEQISSUEDCragton Construction05/31/2000
BISPLISSUEDTheodore Wagner Plumbing, Heating12/22/1999
BIS—ISSUEDTheodore Wagner Plumbing, Heating12/22/1999
1 project · most recent 05/07/2024
FiledStatusContractorScope
05/07/2024CompleteMak Electrical Contracting—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
02/13/2025Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
02/13/2025Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
02/13/2025Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
02/13/2025FinalVYACHESLAV NECHAYEVprogress
02/13/2025Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
12 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account