← Back
BuildNYC
Elevator apt, semi-fireproof without stores
Imperial && Estate
118-40 METROPOLITAN AVENUE · Kew Gardens · BIN 4079389
💬 Discuss this project
1928Year Built
6Stories
D1Building Class
R7AZoning
83,727 sfGross Floor Area
84Units
LL97 CoveredRent Stabilized10 Active Violations 2 likely answered 1 old, status unconfirmed ▸FISP: SAFE
Elevator apt, semi-fireproof without stores · Owner of record: Imperial Associates · 22,400 sf lot · 3.74 FAR built · Flood zone X
Locations of Work
MechanicalEquipmentLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Temporary sidewalk shed installation1p · 1 filing · 2 docs
Site & exteriorSidewalk shed installation4p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Dexter Owners103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Asr Engineering109/13/2024
Dooling & Company Architects109/13/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution203/21/2026
Expediting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Columbia ConstructionGeneral Contractor603/21/2026
Cooper MechanicalPlumbing303/21/2026
Arsenal ScaffoldScaffold307/08/2026
Finest MechanicalPlumbing203/21/2026
ZKW EnterprisesScaffold104/09/2026
Estate AssociatesGeneral Contractor103/21/2026
Wade PLG HeatingPlumbing103/21/2026
Imperial AssociatesGeneral Contractor103/21/2026
AMC Plumbing, Heating & CLNGPlumbing310/20/2015
Cochrane Plumbing & HeatingPlumbing108/14/2012
Columbia ConstructionGeneral Contractor209/21/2006
Columbia ConstructionGeneral Contractor306/11/2015
Columbia ConstructionGeneral Contractor309/21/2006
Columbia ConstructionGeneral Contractor310/31/2007
Columbia ConstructionGeneral Contractor409/28/1999
Columnia ConstructionGeneral Contractor102/03/2003
Evro GroupGeneral Contractor111/18/2019
First World DevelopmentGeneral Contractor105/10/2019
Hills PLG & HeatingPlumbing106/19/1992
Lando & AssociatesPlumbing208/06/2013
Magor PLGN and HeatingPlumbing110/20/1999
Magor Plumbing and HeatingPlumbing109/15/1998
Magor Plumbing & HeatingPlumbing205/07/1999
PSI MechanicalPlumbing108/25/2000
Shah Group EnterprisesGeneral Contractor110/01/2015
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
05/11/2026
Elevator Category 5 inspection report filed
04/28/2026
Boiler inspection report filed
Initial · no defects · Accepted
03/05/2026
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR…
HPD violation · closed
03/05/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE AT DOOR AT COMPACTOR CLOSET, 5th STORY, SECTION ''A-G'', AT WEST
HPD violation · closed
233 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offZKW Enterprises09/16/2024
DOB NOWSidewalk ShedSigned-offArsenal Scaffold03/19/2020
DOB NOWSidewalk ShedSigned-offArsenal Scaffold09/16/2019
BISOTISSUEDEstate Associates02/13/2020
BISOTISSUEDEvro Group11/18/2019
BISOTISSUEDEstate Associates09/16/2019
BISOTISSUEDFirst World Development05/10/2019
BISPLISSUEDAMC Plumbing, Heating & CLNG10/20/2015
BISOTISSUEDImperial Associates10/14/2015
BISEQISSUEDShah Group Enterprises10/01/2015
BISPLISSUEDAMC Plumbing, Heating & CLNG06/24/2015
BISOTISSUEDColumbia Construction06/11/2015
BISFSISSUEDAMC Plumbing, Heating & CLNG05/08/2015
BISPLISSUEDRRP Plumbing08/06/2013
BISOTISSUEDColumbia Construction07/17/2013
BISOTISSUEDColumbia Construction05/20/2013
BISPLISSUEDRRP Plumbing05/20/2013
BISPLISSUEDCochrane Plumbing & Heating08/14/2012
BISOTISSUEDColumbia Construction07/31/2012
BISPLISSUEDFinest Mechanical02/11/2011
BISOTISSUEDColumbia Construction02/04/2011
BISPLISSUEDFinest Mechanical04/21/2010
BISPLISSUEDCooper Mechanical04/02/2009
BISPLISSUEDCooper Mechanical04/02/2009
BISOTISSUEDColumbia Construction03/18/2009
BISOTISSUEDColumbia Construction03/18/2009
BISOTISSUEDColumbia Construction10/31/2007
BISOTISSUEDColumbia Construction09/21/2006
BISOTISSUEDColumbia Construction09/21/2006
BISOTISSUEDColumbia Construction05/19/2006
BISPLISSUEDCooper Mechanical Mechanical03/08/2005
BISFSISSUEDStar Industrial Services02/23/2005
BISPLISSUEDCooper Mechanical01/24/2005
BISOTISSUEDImperial Associates01/14/2005
BISPLISSUEDWade PLG & Heating07/08/2003
BISPLISSUEDWade PLG and Heating02/07/2003
BISOTISSUEDColumnia Construction02/03/2003
BISOTISSUEDColumbia Construction04/30/2002
BISOTISSUEDColumbia Construction11/20/2000
BISPLISSUEDP.S.I. Mechanical08/25/2000
+ 12 more permits on file
4 projects · most recent 09/17/2024
General Wiring
FiledStatusContractorScope
09/17/2024CompleteRichard Neu—
10/07/2019Permit IssuedFina Electrical ContractorsGeneral Wiring
08/29/2019CompleteNash Electric Services—
07/20/2018Permit IssuedR.C.M. ElectricGeneral Wiring
Nothing on file for this building.
247 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account