← Back
Over six families without stores
118-41 METROPOLITAN AVENUE
QUEENS · Kew Gardens · BIN 4079517
💬 Discuss this project
1926Year Built
4Stories
C1Building Class
R7AZoning
16,168 sfGross Floor Area
20Units
Rent Stabilized27 Open Violations ▸
Over six families without stores · Owner of record: METRO 1818 LLC · 7,500 sf lot · 2.16 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PETER AMP DANNY CONTRACTORS907/08/2026
PETER&DANNY CONTRACTORS LLC503/22/2026
METRO 1818 LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING203/21/2026
HAIDER ENGINEERING, P.E.203/21/2026
HAIDER ENGINEERING P E203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PETER & DANNY CONTRACT LLGeneral Contractor1107/08/2026
CLEAN TECH MECHANICAL INCPlumbing207/08/2026
U.S. CHIMNEY CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
P GEORGOPOULOS ARCHITECT889103/29/2022
NEW YORK ENGINEERING ASSO851102/01/2022
Building Lifecycle
All (89)Filed (5)Permit Issued (8)Signed Off (3)Violation (60)Inspection (3)Objection (2)Special Inspection (8)
08/06/2026
Violation issued (HPD, open)
B
08/06/2026
Violation issued (HPD, open)
B
08/06/2026
Violation issued (HPD, open)
B
08/06/2026
Violation issued (HPD, open)
B
08/06/2026
Violation issued (HPD, open)
B
08/06/2026
Violation issued (HPD, open)
B
08/06/2026
Violation issued (HPD, open)
C
05/22/2026
Violation issued (HPD, closed)
A
05/22/2026
Violation issued (HPD, closed)
C
05/22/2026
Violation issued (HPD, closed)
C
05/22/2026
Violation issued (HPD, closed)
A
05/17/2026
Violation issued (HPD, open)
A
05/17/2026
Violation issued (HPD, open)
C
05/17/2026
Violation issued (HPD, closed)
B
05/17/2026
Violation issued (HPD, closed)
B
05/17/2026
Violation issued (HPD, closed)
C
05/17/2026
Violation issued (HPD, closed)
B
05/17/2026
Violation issued (HPD, closed)
B
05/17/2026
Violation issued (HPD, closed)
B
05/07/2026
Violation issued (HPD, closed)
A
02/25/2026
Violation issued (HPD, closed)
B
02/25/2026
Violation issued (HPD, closed)
B
02/25/2026
Violation issued (HPD, closed)
B
12/01/2025
Violation issued (HPD, open)
C
12/01/2025
Violation issued (HPD, open)
C
09/09/2025
Violation issued (HPD, closed)
C
09/09/2025
Violation issued (HPD, closed)
C
09/09/2025
Violation issued (HPD, closed)
C
09/09/2025
Violation issued (HPD, closed)
C
09/09/2025
Violation issued (HPD, closed)
A
09/09/2025
Violation issued (HPD, closed)
A
07/29/2022
Signed off — Alteration
CONNECT EXISTING GAS SERVICE TO REINSTALLED EXISTING BURNER.
Q00661633-I1
07/29/2022
Signed off — Alteration
Q00662054-I1
06/29/2022
Violation issued (HPD, open)
B
06/27/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/27/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/23/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/22/2022
Violation issued (HPD, open)
A
05/02/2022
Signed off — Alteration
Install liner in existing masonry chimney. No change in use, egress, and/or occupancy.
Q00700806-I1
04/25/2022
Permit issued — General Construction
Q00700806-I1-GC
03/30/2022
Objection raised — Energy
03/30/2022
Objection resolved — Addressed
03/29/2022
Filed — Alteration
Install liner in existing masonry chimney. No change in use, egress, and/or occupancy.
Q00700806-I1
03/17/2022
Special inspection requirement — Chimneys and vents
Vasilios Georgopoulos
03/17/2022
Special inspection requirement — Final
Vasilios Georgopoulos
02/08/2022
Permit issued — Boiler Equipment
Q00662054-I1-BE
02/08/2022
Permit issued — Plumbing
Q00661633-I1-PL
02/01/2022
Filed — Alteration
CONNECT EXISTING GAS SERVICE TO REINSTALLED EXISTING BURNER.
Q00661633-I1
02/01/2022
Filed — Alteration
Q00662054-I1
01/14/2022
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
01/14/2022
Special inspection requirement — Maintenance information
LOUIS ARENA
01/14/2022
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
01/14/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
01/13/2022
Special inspection requirement — Heating Systems
LOUIS ARENA
01/13/2022
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
06/03/2019
Violation issued (HPD, closed)
B
06/03/2019
Violation issued (HPD, closed)
B
06/03/2019
Violation issued (HPD, closed)
B
06/03/2019
Violation issued (HPD, closed)
B
06/03/2019
Violation issued (HPD, closed)
B
Latest 60 of 89 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offU.S. CHIMNEY CORP04/25/2022
DOB NOWBoiler EquipmentSigned-offCLEAN TECH MECHANICAL INC02/08/2022
DOB NOWPlumbingSigned-offCLEAN TECH MECHANICAL INC02/08/2022
DOB NOWSupported ScaffoldPermit IssuedPETER & DANNY CONTRACT LL01/11/2019
DOB NOWSidewalk ShedPermit IssuedPETER & DANNY CONTRACT LL11/02/2018
DOB NOWSidewalk ShedPermit IssuedPETER & DANNY CONTRACT LL05/22/2018
DOB NOWSidewalk ShedPermit IssuedPETER & DANNY CONTRACT LL11/29/2017
DOB NOWSidewalk ShedPermit IssuedPETER & DANNY CONTRACT LL11/09/2017
BISFBISSUEDKEW FOREST PLG AND HEATING08/14/1995
BISFBISSUEDPETROLEUM HEAT & POWER CO., INC.02/23/1990
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/27/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/27/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/23/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
03/17/2022Chimneys and ventsVasilios Georgopoulosspecial
03/17/2022FinalVasilios Georgopoulosprogress
01/14/2022HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
01/14/2022Maintenance informationLOUIS ARENAenergy_progress
01/14/2022HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
01/14/2022HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
01/13/2022Heating SystemsLOUIS ARENAspecial
01/13/2022Energy Code Compliance InspectionsLOUIS ARENAprogress
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch4
08/29/2026Q00002148-I1Request digital key ↗
08/26/2026Q00661633-I1Request digital key ↗
08/26/2026Q00662054-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/28/2026Q00117358-I1Request digital key ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/26/2026Q00700806-I1Open ↗
08/13/2026Q00117358-I1Open ↗
08/13/2026Q00661633-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/23/2026Q00662054-I1Open ↗
08/28/2026Q00661633-I1Open ↗
08/26/2026Q00700806-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026Q00662054-I1Open ↗
08/26/2026Q00700806-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/14/2026Q00700806-I1Open ↗
08/13/2026Q00662054-I1Open ↗
08/13/2026Q00661633-I1Open ↗
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00662054-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00662054-I1Open ↗