Miscellaneous and old-style bank buildings
118 EAST 25 STREET
MANHATTAN · Gramercy · BIN 1018086
💬 Discuss this project
1912Year Built
12Stories
O9Building Class
C6-2AZoning
49,020 sfGross Floor Area
13Units
LL97 CoveredRent Stabilized4 Open Violations ▸FISP: SWARMP
Miscellaneous and old-style bank buildings · Owner of record: 118-25 OWNERS CORP · 4,115 sf lot · 11.91 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionCivilGeneral
Permit Issued — active, not yet Signed-off
Penthouse12p · 1 filing · 20 docs
Floor 1212p · 1 filing · 20 docs
Floor 11
Floor 1013p · 1 filing · 20 docs
Floor 926p · 4 filings · 20 docs
Floor 823p · 2 filings · 20 docs
Floor 729p · 4 filings · 20 docs
Floor 6Under Construction1 filing · 9 docs
Floor 512p · 1 filing · 20 docs
Floor 414p · 1 filing · 20 docs
Floor 312p · 1 filing · 20 docs
Floor 2
Floor 1
Cellar3p · 2 filings · 20 docs
Basement3p · 2 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
11825 OWNEERS9209/13/2026
SEN ARCHITECTS4107/08/2026
118-250 OWNERS CORP103/22/2026
ROBERT TARDIO 118-25 OWNE103/22/2026
1825 OWNERS CORP RUDD MANAGEMENT303/22/2026
OWNER OF 118 EAST 25 S103/22/2026
BELL MARC PROPERTY MANAGEMENT103/21/2026
118-EAST25TH OWNER203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONAPAC SERVICES DBA103/21/2026
RESOLUTION EXPEDITING2003/21/2026
GEE2000 ARCHITECT P.C.403/21/2026
J A EXPEDITING603/21/2026
CONAPAC SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARBRIS CORPGeneral Contractor1203/21/2026
MUNSEY ENTERPRISES LLCGeneral Contractor1007/08/2026
AERIAL DESIGN BUILD SVCSGeneral Contractor607/08/2026
AP PLUMBING & HVAC LLCPlumbing307/08/2026
ECONOMIC DEV AND CONSTRU*General Contractor207/08/2026
CROSSFIELD PLBG.&HTG.CORPFire Protection207/08/2026
AQUEDUCT MECHANICAL CORPPlumbing107/08/2026
DOUG'S PLBG & HTG SERV COPlumbing107/08/2026
NICE PLUMBING CORPPlumbing107/08/2026
SAFETECH ELECL CONTNG CORElectrical103/22/2026
ORBIT PLBG & HTG INCPlumbing107/08/2026
AQUEDUCT MECHANICAL CORPFire Protection107/08/2026
DOUG'S PLBG & HTG SERV COFire Protection107/08/2026
ORBIT SPRINKLER CORPFire Protection107/08/2026
PELHAM BAY CONSTRUCTION LGeneral Contractor107/08/2026
SCHIM LLCGeneral Contractor104/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MIKE POLYCHRONIADES8407404/07/2025
PSI AGENCY INC.254404/07/2025
MWB ENGINEERING7942508/11/2022
GEE2000 ARCHITECT P.C.691204/04/2022
AK CONSULTING SERVICES, I6198207/15/2021
Building Lifecycle
All (267)Filed (30)Permit Issued (28)Signed Off (7)Facade (FISP) (13)Violation (60)Inspection (25)Objection (74)Special Inspection (30)
08/24/2026
Filed — Alteration
Removal of non-loadbearing interior partitions and finishes. No change to use, egress, or occupancy.
M01383972-P1
08/21/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
ALEXIS SCHLESSINGERMAN
08/21/2026
Special inspection requirement — Final
Brynnemarie Lanciotti
08/20/2026
Objection raised — Cost
08/07/2026
Objection resolved — Open
07/31/2026
Objection raised — Scope
07/31/2026
Objection raised — Admin
07/31/2026
Objection raised — Cost
07/31/2026
Objection resolved — Resolved
07/30/2026
Objection resolved — Addressed
07/29/2026
Objection raised — Cost
07/29/2026
Objection raised — Scope
07/29/2026
Objection raised — Scope
07/13/2026
Filed — Alteration
Plumbing and Sprinkler work
M01419755-S2
07/10/2026
Filed — Alteration
Plumbing and Sprinkler work
M01419755-S1
07/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
07/10/2026
Special inspection requirement — HVAC-R and service water heating system controls
07/10/2026
Special inspection requirement — Post-installed Anchors
07/10/2026
Special inspection requirement — Maintenance information
07/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
07/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/09/2026
Filed — Alteration
Plumbing and Sprinkler work
M01419755-I1
06/29/2026
Special inspection requirement — Lighting in dwelling units
06/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/29/2026
Special inspection requirement — Permanent certificate
06/29/2026
Special inspection requirement — Maintenance information
06/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/25/2026
Special inspection requirement — Post-installed Anchors
06/25/2026
Special inspection requirement — Shutoff dampers
06/25/2026
Special inspection requirement — Final
06/25/2026
Special inspection requirement — Energy Code Compliance Inspections
06/25/2026
Special inspection requirement — Post-installed Anchors
06/25/2026
Special inspection requirement — Sprinkler Systems
06/25/2026
Special inspection requirement — Maintenance information
06/25/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/25/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/25/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/25/2026
Special inspection requirement — Mechanical Systems
06/19/2026
Special inspection requirement — Final
05/20/2026
Permit issued — General Construction
M01383972-I1-GC
05/13/2026
Special inspection requirement — Final
05/13/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/07/2026
Special inspection requirement — Fire-Resistance Rated Construction
MAURICIO ANDRADE
05/07/2026
Special inspection requirement — Lighting in dwelling units
MAURICIO ANDRADE
04/29/2026
Objection raised — Cost
04/29/2026
Objection raised — Scope
04/27/2026
Objection resolved — Resolved
04/27/2026
Objection resolved — Resolved
04/27/2026
Objection resolved — Resolved
04/20/2026
Filed — Alteration
Removal of non-loadbearing interior partitions and finishes. No change to use, egress, or occupancy.
M01383972-I1
04/17/2026
Filed — Alteration CO
Filing to convert 7th floor space from commercial to residential. Work to include interior partition and finishes as per plans. No change in egress.
M00596913-P3
04/09/2026
Objection raised — Scope
04/05/2026
Objection raised — Scope
04/05/2026
Objection raised — Cost
03/24/2026
Filed — Alteration
Plans filed as supplement to the job M01316098-I1. The work is as per the plans.
M01316098-P1
03/18/2026
Filed — Alteration
Plans filed as supplement to the job M01316098-I1. The work is as per the plans.
M01316098-S1
01/22/2026
Signed off — Alteration
Plumbing and sprinkler work filed in conjunction with the conversion to a dwelling unit as per plans. Architectural and mechanical work filed under separate applications. No change in use, egress, or occupancy under this application.
M00596970-I1
12/02/2025
Filed — Alteration
Plans filed as supplement to the job M01316098-I1. The work is as per the plans.
M01316098-I1
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 267 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedPELHAM BAY CONSTRUCTION L05/20/2026
DOB NOWSprinklersSigned-offCROSSFIELD PLBG.&HTG03/21/2025
DOB NOWPlumbingSigned-offNICE PLUMBING CORP02/18/2025
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG01/27/2025
DOB NOWSprinklersSigned-offCROSSFIELD PLBG.&HTG.CORP01/27/2025
DOB NOWGeneral ConstructionPermit IssuedSCHIM LLC01/06/2025
DOB NOWGeneral ConstructionPermit IssuedMUNSEY ENTERPRISES LLC04/17/2024
DOB NOWMechanical SystemsPermit IssuedMUNSEY ENTERPRISES LLC04/12/2024
DOB NOWMechanical SystemsPermit IssuedMUNSEY ENTERPRISES LLC12/12/2023
DOB NOWSprinklersSigned-offCROSSFIELD PLBG.&HTG09/27/2023
DOB NOWSprinklersSigned-offCROSSFIELD PLBG.&HTG.CORP09/27/2023
DOB NOWSprinklersSigned-offORBIT SPRINKLER CORP03/21/2023
DOB NOWSprinklersSigned-offDOUG'S PLBG & HTG SERV CO02/01/2023
DOB NOWPlumbingSigned-offDOUG'S PLBG & HTG SERV CO02/01/2023
DOB NOWGeneral ConstructionSigned-offECONOMIC DEV CONSTRU*01/10/2023
DOB NOWGeneral ConstructionPermit IssuedMUNSEY ENTERPRISES LLC12/02/2022
DOB NOWSprinklersSigned-offORBIT PLBG & HTG INC03/18/2022
DOB NOWGeneral ConstructionSigned-offECONOMIC DEV CONSTRU*01/31/2022
DOB NOWMechanical SystemsSigned-offAERIAL DESIGN BUILD SVCS01/06/2022
DOB NOWGeneral ConstructionSigned-offAERIAL DESIGN BUILD SVCS01/05/2022
DOB NOWMechanical SystemsSigned-offAERIAL DESIGN BUILD SVCS12/10/2021
DOB NOWSprinklersSigned-offAQUEDUCT MECHANICAL CORP12/09/2021
DOB NOWSprinklersSigned-offAQUEDUCT MECHANICAL CORP12/09/2021
DOB NOWGeneral ConstructionSigned-offAERIAL DESIGN BUILD SVCS11/17/2021
DOB NOWSidewalk ShedSigned-offARBRIS CORP06/04/2019
DOB NOWSupported ScaffoldSigned-offARBRIS CORP06/04/2019
DOB NOWSidewalk ShedSigned-offARBRIS CORP03/13/2019
DOB NOWSupported ScaffoldSigned-offARBRIS CORP03/13/2019
BISOTISSUEDINDIGO BLUE GROUP INC08/30/2019
BISOTRE-ISSUEDACE CONTRACTING CONSULTING07/06/2017
BISBLISSUEDVSP MECHANICAL INC03/09/2017
BISPLISSUEDALAFOGIANNIS PLBG & HTG10/13/2016
BISOTISSUEDFINIX U.S.A. CONSTRUCTION07/21/2016
BISMHISSUEDFINIX U.S.A. CONSTRUCTION07/21/2016
BISSPISSUEDJOHNNY'S P&H CONTRAC INC04/20/2016
BISMHISSUEDFINIX U.S.A. CONSTRUCTION04/18/2016
BISOTISSUEDFINIX U.S.A. CONSTRUCTION04/18/2016
BISPLISSUEDVSP MECHANICAL INC02/09/2016
BISOTISSUEDFINIX U.S.A. CONSTRUCTION12/11/2015
BISMHISSUEDFINIX U.S.A. CONSTRUCTION12/11/2015
+ 37 more permits on file
3 projects · most recent 07/13/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/13/2026——Air Conditioning Systems
Cooling
Daikin RXLA48AAVJU 4 tons · Vrf Outdoor ×2
03/24/2025Permit IssuedMUNSEY ENTERPRISES LLCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric PUHY-P72TNUA 72,000 BTU · Vrf Outdoor ×2
PVFY-P36NAMU-E1 36,000 BTU · Vrf Indoor ×2
PVFY-P48NAMU-E1 48,000 BTU · Vrf Indoor ×2
Heating
Mitsubishi Electric PUHY-P72TNU-A 80,000 BTU · Vrf Outdoor ×2
Ventilation
Greenheck SP-A50-90-VG 75 CFM · Exhaust Fan ×4
CSP-A390-VG 175 CFM · Exhaust Fan ×2
Best HBN566212SS 200 CFM · Kitchen Exhaust ×2
08/11/2022Signed-offAERIAL DESIGN BUILD SVCSAir Conditioning Systems
Cooling
Mitsubishi Electric SUZ-KA36NA2.TH 36,000 BTU · Heat Pump Outdoor ×4
2 projects · most recent 07/13/2026
Sprinkler System
FiledStatusContractorScope
07/13/2026——Sprinkler System
08/11/2022Signed-offAQUEDUCT MECHANICAL CORP72 heads
3 projects · most recent 07/13/2026
Water/Sanitary Gas
FiledStatusContractorScope
07/13/2026——Gas, Water/Sanitary
10/07/2025Signed-offNICE PLUMBING CORPWater/Sanitary
08/11/2022Signed-offAQUEDUCT MECHANICAL CORPGas, Water/Sanitary
7 projects · most recent 07/07/2025
General Wiring
FiledStatusContractorScope
07/07/2025CompleteNYCO ELECTRIC CORPGeneral Wiring
06/13/2022CompleteL.D.M. ELECTL CONTRS INCGeneral Wiring
11/22/2021CompleteATTRACTIVE LIGHTING ELECLGeneral Wiring
12/09/2020CompleteSAFETECH ELECL CONTNG COR—
12/09/2020CompleteSAFETECH ELECL CONTNG COR—
09/12/2019Permit IssuedR.C.M. ELECTRIC CORP.General Wiring
03/13/2019Permit IssuedKLK ELECTRIC, INC—
1 project · most recent 03/24/2026
Steel Concrete
FiledStatusContractorScope
03/24/2026——Steel, Concrete
▾Field Inspections (DOB CAP) — 25
DateTypeResultReport
08/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/28/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/18/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/16/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/29/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/29/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/26/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/28/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/21/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/05/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/03/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/03/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/13/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/16/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/10/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/09/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/08/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/03/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/06/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/02/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/16/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 95
DateRequirementInspectorRole
08/21/2026Mastic and Intumescent Fire-resistant CoatingsALEXIS SCHLESSINGERMANspecial
08/21/2026FinalBrynnemarie Lanciottiprogress
07/10/2026Maintenance information—energy_progress
07/10/2026Post-installed Anchors—special
07/10/2026HVAC-R and service water heating system controls—energy_progress
07/10/2026HVAC-R and service water piping design and insulation—energy_progress
07/10/2026HVAC-R and service water heating equipment—energy_progress
07/10/2026Fire-Resistant Penetrations and Joints—special
06/29/2026Tenant Protection Plan Compliance—special
06/29/2026Lighting in dwelling units—energy_progress
06/29/2026Maintenance information—energy_progress
06/29/2026Permanent certificate—energy_progress
06/25/2026Shutoff dampers—energy_progress
06/25/2026HVAC-R and service water piping design and insulation—energy_progress
06/25/2026HVAC-R and service water heating system controls—energy_progress
06/25/2026Sprinkler Systems—special
06/25/2026Post-installed Anchors—special
06/25/2026Energy Code Compliance Inspections—progress
06/25/2026Mechanical Systems—special
06/25/2026Fire-Resistant Penetrations and Joints—special
06/25/2026Post-installed Anchors—special
06/25/2026Final—progress
06/25/2026Maintenance information—energy_progress
06/25/2026HVAC-R and service water heating equipment—energy_progress
06/19/2026Final—progress
Latest 25 of 95.
▾Documents — 380 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch29
09/06/2026M01383972-P1Request digital key ↗
09/03/2026M00554704-I1Request digital key ↗
09/03/2026M00554719-I1Request digital key ↗
Showing 3 of 29 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00140968-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00140968-I1Request digital key ↗
▸Applications & Permits38
▸BISPLAN / WORK APPROVAL APPLICATION20
02/17/2021123491658Open ↗
07/03/2019123686895Open ↗
10/23/2018123491658Open ↗
Showing 3 of 20 on file for this type
▸BISWORK PERMIT APPLICATION18
09/03/2019123686895Open ↗
08/08/2019123686895Open ↗
07/06/2017140590947Open ↗
Showing 3 of 18 on file for this type
▸Seals & Professional Certifications132
▸DOB NOWProgress Inspector Seal & Signature47
09/26/2026M00595821-P3Open ↗
09/23/2026M01383972-P1Open ↗
09/23/2026M00595821-I1Open ↗
Showing 3 of 47 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION30
01/24/2020123686895Open ↗
07/03/2019123686895Open ↗
10/23/2018123491658Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature30
09/06/2026M01383972-P1Open ↗
09/05/2026M00140968-I1Open ↗
09/03/2026M00554719-I1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/26/2026M00595821-P3Open ↗
09/23/2026M01383972-P1Open ↗
09/23/2026M00595821-I1Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
01/03/2017140590947Open ↗
10/10/2016140561194Open ↗
08/24/2015122475767Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
08/24/2015122475767Open ↗
01/06/2012120938600Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
01/03/2017140590947Open ↗
10/10/2016140561194Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
01/03/2017140590947Open ↗
10/10/2016140561194Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
01/06/2012120938600Open ↗
▸Trade Schedules & Equipment22
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
10/23/2018123491658Open ↗
01/11/2017122550783Open ↗
12/27/2016122550783Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING5
10/10/2016140561194Open ↗
12/04/2008110202441Open ↗
11/28/2008110202441Open ↗
Showing 3 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
11/27/2015122475767Open ↗
06/05/2009110202441Open ↗
01/08/2009110148947Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
02/27/2017123023281Open ↗
01/06/2012120938600Open ↗
▸BISEQUIPMENT USE PERMITS1
10/06/2017122550783Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
10/06/2017122550783Open ↗
▸Safety & Tenant Protection13
▸BISTenant Protection Plan and Notes5
07/03/2019123686895Open ↗
10/23/2018123491658Open ↗
02/27/2017123023281Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWStreet Tree Checklist5
08/17/2026M00596913-P1Open ↗
08/17/2026M00596913-P3Open ↗
08/15/2026M00935376-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/13/2026M00935376-I1Open ↗
08/13/2026M00596913-I1Open ↗
▸BISSTREET TREE CHECKLIST1
02/25/2020123491658Open ↗
▸Environmental & Asbestos38
▸DOB NOWDEP ACP-5: Asbestos Assessment Report22
09/06/2026M01383972-P1Open ↗
09/03/2026M00554719-I1Open ↗
09/03/2026M00595741-I1Open ↗
Showing 3 of 22 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
07/03/2019123686895Open ↗
10/23/2018123491658Open ↗
02/27/2017123023281Open ↗
Showing 3 of 9 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
01/06/2012120938600Open ↗
01/06/2012120938600Open ↗
Showing 2 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/15/2026M00596913-I1Open ↗
08/13/2026M00596970-I1Open ↗
08/13/2026M00596977-I1Open ↗
▸Energy Compliance29
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS11
07/03/2019123686895Open ↗
10/23/2018123491658Open ↗
03/15/2018140561194Open ↗
Showing 3 of 11 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
01/24/2020123686895Open ↗
03/15/2018140561194Open ↗
10/27/2017122550783Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.5
08/13/2026M00595741-I1Open ↗
08/13/2026M00595821-I1Open ↗
08/13/2026M00595377-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
01/03/2017140590947Open ↗
10/10/2016140561194Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
01/03/2017140590947Open ↗
10/10/2016140561194Open ↗
▸BISTR8: Energy Code Progress Inspections1
09/20/2013120938600Open ↗
▸BISTECHNICAL REPORT: ENERGY1
01/06/2012120938600Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/10/2016140561194Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
02/18/2016122553389Open ↗
▸Approvals, Objections & Sign-offs15
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
01/24/2020123686895Open ↗
03/15/2018140561194Open ↗
12/21/2017122553389Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
01/06/2012120938600Open ↗
Showing 1 of 3 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
09/03/2019123686895Open ↗
03/23/2016122553389Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
10/23/2018123491658Open ↗
▸Cost, Insurance & Ownership25
▸BISCOST AFFIDAVIT25
02/25/2020123491658Open ↗
01/24/2020123686895Open ↗
07/03/2019123686895Open ↗
Showing 3 of 25 on file for this type
▸Filing & Intake Forms26
▸BISADDITIONAL INFORMATION10
11/16/2020123491658Open ↗
11/02/2020123491658Open ↗
07/24/2019123686895Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING COVER SHEET8
07/03/2019123686895Open ↗
10/23/2018123491658Open ↗
02/27/2017123023281Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM6
01/24/2020123686895Open ↗
03/15/2018140561194Open ↗
12/21/2017122553389Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
01/03/2017140590947Open ↗
10/10/2016140561194Open ↗
▸Other Documents9
▸DOB NOWProperty Ownership Certification5
08/17/2026M00596913-P1Open ↗
08/17/2026M00596913-P3Open ↗
08/15/2026M00935376-I1Open ↗
Showing 3 of 5 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
07/24/2019123686895Open ↗
07/24/2019123686895Open ↗
04/16/2009110202441Open ↗
▸BISPLOT DIAGRAM1
10/23/2018123491658Open ↗