← Back
BROOKLYN
Minkin Building
118 EAST 49 STREET · East Flatbush-Rugby · BIN 3327557
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 1 filing · 20 docs
Floor 1Under Construction16p · 1 filing · 20 docs
CellarUnder Construction18p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MONADNOCK DEVELOPMENT609/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ETTINGER ENGINEERING ASSOCIATES204/08/2026
DE NARDIS ENGINEERING, LLC104/08/2026
DATTNER ARCHITECTS104/03/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MONADNOCK CONSTRUCTION INGeneral Contractor207/08/2026
G.N.T. MECHANICAL LLCFire Protection107/08/2026
G.N.T. MECHANICAL LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CONCRETE SOLUTIONS LAB CO5344304/08/2026
Building Lifecycle
All (35)Filed (4)Permit Issued (4)Inspection (2)Objection (16)Special Inspection (9)
08/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/09/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/02/2026
Permit issued — General Construction
B01355453-I1-GC
05/18/2026
Permit issued — Structural
B01355453-S3-ST
05/14/2026
Objection resolved — Addressed
05/14/2026
Objection resolved — Addressed
05/14/2026
Objection resolved — Addressed
05/14/2026
Objection resolved — Addressed
05/14/2026
Objection resolved — Addressed
05/14/2026
Objection resolved — Addressed
05/01/2026
Objection resolved — Addressed
05/01/2026
Objection resolved — Addressed
04/29/2026
Permit issued — Sprinklers
B01355453-S5-EW-SP
04/29/2026
Objection raised — Other
04/29/2026
Objection raised — Structural
04/29/2026
Objection raised — Structural
04/29/2026
Objection raised — Structural
04/29/2026
Objection raised — Fire_Protection
04/29/2026
Objection raised — Other
04/29/2026
Objection raised — Fire_Protection
04/29/2026
Objection raised — Other
04/27/2026
Permit issued — Plumbing
B01355453-S4-PL
04/08/2026
Filed — Alteration
sprinkler system work as per plans filed herewith.
B01355453-S5
04/08/2026
Filed — Alteration
sprinkler system work as per plans filed herewith.
B01355453-S4
04/08/2026
Filed — Alteration
sprinkler system work as per plans filed herewith.
B01355453-S3
04/03/2026
Filed — Alteration
sprinkler system work as per plans filed herewith.
B01355453-I1
04/03/2026
Special inspection requirement — Sprinkler Systems
MINA HANNA
02/10/2026
Special inspection requirement — Concrete - Cast-In-Place
MINA HANNA
02/10/2026
Special inspection requirement — Masonry
MINA HANNA
02/10/2026
Special inspection requirement — Post-installed Anchors
MINA HANNA
02/10/2026
Special inspection requirement — Structural Steel - Details
MINA HANNA
02/10/2026
Special inspection requirement — Structural Steel - High Strength Bolting
MINA HANNA
02/10/2026
Special inspection requirement — Structural Steel - Welding
MINA HANNA
02/10/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MINA HANNA
02/10/2026
Special inspection requirement — Final
MINA HANNA
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMONADNOCK CONSTRUCTION IN06/02/2026
DOB NOWStructuralPermit IssuedMONADNOCK CONSTRUCTION IN05/18/2026
DOB NOWSprinklersPermit IssuedG.N.T. MECHANICAL LLC04/29/2026
DOB NOWPlumbingPermit IssuedG.N.T. MECHANICAL LLC04/27/2026
1 project · most recent 04/08/2026
FiledStatusContractorScope
04/08/2026Permit IssuedG.N.T. MECHANICAL LLC2 heads
1 project · most recent 04/08/2026
Water/Sanitary
FiledStatusContractorScope
04/08/2026Permit IssuedG.N.T. MECHANICAL LLCWater/Sanitary
1 project · most recent 04/08/2026
Steel Concrete Masonry
FiledStatusContractorScope
04/08/2026Permit IssuedMONADNOCK CONSTRUCTION INSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/09/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
04/03/2026Sprinkler SystemsMINA HANNAspecial
02/10/2026Concrete - Cast-In-PlaceMINA HANNAspecial
02/10/2026MasonryMINA HANNAspecial
02/10/2026Post-installed AnchorsMINA HANNAspecial
02/10/2026Structural Steel - DetailsMINA HANNAspecial
02/10/2026Structural Steel - High Strength BoltingMINA HANNAspecial
02/10/2026Structural Steel - WeldingMINA HANNAspecial
02/10/2026Structural Stability – Alterations of existing buildingsMINA HANNAspecial
02/10/2026FinalMINA HANNAprogress
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/03/2026B01355453-P1Request digital key ↗
09/03/2026B01355453-S5Request digital key ↗
09/03/2026B01355453-S4Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications14
▸DOB NOWSpecial Inspector Seal & Signature8
08/30/2026B01355453-S3Open ↗
08/30/2026B01355453-S3Open ↗
08/30/2026B01355453-S3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/03/2026B01355453-S4Open ↗
09/03/2026B01355453-P1Open ↗
09/03/2026B01355453-S5Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/30/2026B01355453-S3Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/03/2026B01355453-S4Open ↗
09/03/2026B01355453-P1Open ↗
09/03/2026B01355453-S5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/15/2026B01355453-S3Open ↗