HPD09/20/2025§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 2NDFLO, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST
HPD09/20/2025§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 2NDFLO, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST
HPD11/20/2024§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... MORE THAN 10 SQ FEET AT CEILING IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
DOB04/27/2022FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB03/02/2022FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB03/02/2022FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB01/26/2022FAIL TO COMPLY W/COMMISH ORDER#357162(120121FEU30504PN) DATED 12/1/21 RQUIRING OWNR RTAIN NYSPE TO PREPARE RPR DWGS & LEGALIZE ALL WRK.WRK RQUIRD TO STRT UNDR PRMT BY 1/17/22.AS OF 1/26/22 NO JOBS TO RPR OR LEGALIZE HAVE BEEN FILE IN BIS OR DOBNOW,NO WORK PRMTS OBTAIND.IMMED COMPLY W/COMMISIONER'S ORDER#357162(120121FEU30504PN) DATED 12/1/2021
ECB01/24/2022OCCUPANCY CONTRARY TO THE COFO (301820091F): @ CELLAR- PASTOR'S OFFICE IN CONJUNCTION W/ 1ST FL; @1ST FL- OCCUPIED AS PLACE OF WORSHIP WITH SEATING, ALTAR, COAT RACK, DESK., DISCONTINUE ILLEGAL OCCUPANCY OR AME$2K due
DOB12/01/2021EWO-DUE TO GAS EXPLOSION OCCURED @58VERMONT ST.BK ON 12/1/21FRONT FACADE OF BLDG SUFFERED DMG.RISK OF DEBRIS FALLING FROM FRONT FACADE TO SIDEWALK.REPRESENTS DANGER TO PUBLIC.OWNR IMMED HIRE NYSPE &CNTRCTR &INSTALL TIGHT BOARD FENCE @ FRONT OF BLDG.ALL WRK SUPRVISD ONSITE PE FILE PRMT W/IN 2DAY OF COMMENCENMENT OF WORK
DOB12/01/2021FAILURE TO MAINTAIN-GAS EXPLOSION@58 VERMONT,INTER PARTITION DMGD- FIRE FIGHTING OPS.UNRELATED TO EXPLOSN-1FL COMBINED W/118 JAMAICA AV- UNPERMITED&NON ENGR W/UNPERMTD EGRESS PATH@CELLAR CONNCT 54 VERMONT OWNR ENGAGE NYSPE-EVAL ENTIRE BLDG,PREP/FILE RPR DWGS.LEGALZ WRK.BLDG RPR UNDR PRMT STRT 01/17/22-COMPL/SIGNOF 03/04/2022
ECB12/01/2021I OBSERVED IN THE CELLAR AREA OF BUILDINGS BOILER ROOM, 2 HOT WATER HEATERS REPLACED. NO RECORDS AT DOB OF ANY TEST OR INSPECTIONS BEING PERFORMED ON THE NEW OR ALTERED SYSTEM., PERFORM TEST$2K due
ECB12/01/2021I OBSERVED IN THE CELLAR AREA OF BUILDINGS BOILER ROOM, 2 HOT WATER HEATERS REPLACED. ALL THE GAS AND INSTALLATION IS 100% COMPLETED AND DONE WITHOUT A PERMIT., OBTAIN PERMIT$2K due
DOB12/01/2021DUE TO FIRE