Elevator apt, semi-fireproof with stores
118 MADISON AVENUE
MANHATTAN · BIN 1016956
💬 Discuss this project
1920Year Built
14Stories
D7Building Class
C5-2Zoning
32,917 sfGross Floor Area
13Units
LL97 CoveredRent Stabilized18 Open Violations 16 unresolved · 2 paperwork only ▸FISP: SAFE
Elevator apt, semi-fireproof with stores · 2,351 sf lot · 14 FAR built · Flood zone X
Locations of Work
StructuralFire Alarm
Permit Issued — active, not yet Signed-off
Floor 111p · 1 filing · 7 docs
Floor 10
Floor 9
Floor 8Under Construction1 filing · 2 docs
Floor 7Under Construction1 filing · 2 docs
Floor 6Under Construction1 filing · 2 docs
Floor 5Under Construction1p · 2 filings · 9 docs
Floor 4Under Construction1 filing · 2 docs
Floor 3Under Construction1 filing · 2 docs
Floor 2Under Construction1 filing · 2 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
REPUBLIC EXTERIOR SERVICE103/22/2026
WACKY DUCK, LLC/PAN AM EQ403/22/2026
TUBA CORP PAN AM EQUITIES103/22/2026
TUBA803/22/2026
TUDA CORP.103/22/2026
PAN AM EQUITIES1003/22/2026
WACKY CUCK LLC103/22/2026
50 RIVERSIDE TENANTS103/22/2026
CHARTER COMMUNICATIONS103/22/2026
YAKITORI403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/07/2019$38.0M—— → —$1,154/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATUXENT ENGINEERING803/21/2026
NEW YORK ENGINEERING ASSOCIATES P C1203/21/2026
LDC CONSULTANTS203/21/2026
H Z BUILDING NY203/21/2026
AE DESIGN SOLUTION603/21/2026
NORFAST CONSULTING GROUP INC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
REPUBLIC EXTERIOR SERVICEGeneral Contractor1107/08/2026
REPUBLIC SCAFFOLD&HOIST CGeneral Contractor807/08/2026
H&Z BUILDING CONSULTING IGeneral Contractor403/21/2026
SKYLINE RESTORATION INCGeneral Contractor207/08/2026
ARISTON CHIMNEY LLCGeneral Contractor104/09/2026
STONEGATE BUILD INCGeneral Contractor107/08/2026
BELL FUEL OIL, LLCPlumbing106/02/2026
CONSTANCE GARGIULOElectrical103/21/2026
MARATHON MECHANICAL LLCPlumbing106/28/2026
DEYI LINGElectrical103/21/2026
EMPIRE LIC ELECL CONTRSElectrical103/22/2026
JTE ELECTRICAL SERVICESElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851601/23/2026
LEO Y LEE ASSOCIATES2481312/01/2025
NORFAST ENGINEERING PLLC6655111/26/2024
JAE CHUNG ARCHITECT, P.C.7830206/22/2023
Building Lifecycle
All (160)Filed (17)Permit Issued (23)Signed Off (4)Facade (FISP) (26)Violation (60)Inspection (4)Special Inspection (26)
06/23/2026
Cycle 10 facade report submitted
06/22/2026
Cycle 10 facade report signed — SAFE
05/22/2026
Cycle 9 facade report signed — SAFE
05/21/2026
Cycle 10 facade inspection completed
05/21/2026
Cycle 9 facade inspection completed
05/06/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/29/2026
Violation issued (HPD, open)
A
04/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/21/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/07/2026
Signed off — Alteration
Facade repairs including terra cotta repair and replacement, brick repair and replacement, cut and repointing at deteriorated joints, and lintel replacement.
M01028934-I1
04/07/2026
Permit issued — Sidewalk Shed
M00263105-I1-SH
04/07/2026
Cycle 9 facade report submitted
02/27/2026
Permit issued — General Construction
M01028934-I1-GC
02/26/2026
Permit issued — Suspended Scaffold
M01158702-I1-SC
01/25/2026
Permit issued — Plumbing
M01068590-S1-PL
01/25/2026
Permit issued — Boiler Equipment
M01068590-I1-BE
01/24/2026
Permit issued — Boiler Equipment
M01068590-S3-BE
01/23/2026
Filed — Alteration
INSTALL NEW GAS PIPING FROM EXISTING GAS METER AND SERVICE TO REPLACEMENT GAS/OIL BURNER.
M01068590-P4
01/16/2026
Permit issued — Suspended Scaffold
M01158702-I1-SC
01/09/2026
Filed — Alteration
INSTALL NEW GAS PIPING FROM EXISTING GAS METER AND SERVICE TO REPLACEMENT GAS/OIL BURNER.
M01068590-P2
01/09/2026
Filed — Alteration
INSTALL NEW GAS PIPING FROM EXISTING GAS METER AND SERVICE TO REPLACEMENT GAS/OIL BURNER.
M01068590-S3
12/31/2025
Signed off — Alteration
INSTALL NEW GAS PIPING FROM EXISTING GAS METER AND SERVICE TO REPLACEMENT GAS/OIL BURNER.
M01068590-S2
12/30/2025
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
12/30/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
12/30/2025
Special inspection requirement — Maintenance information
LOUIS ARENA
12/30/2025
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
12/30/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
12/30/2025
Special inspection requirement — Heating Systems
LOUIS ARENA
12/30/2025
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
12/30/2025
Special inspection requirement — Heating Systems
LOUIS ARENA
12/30/2025
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
12/30/2025
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
12/30/2025
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
12/30/2025
Special inspection requirement — Maintenance information
LOUIS ARENA
12/01/2025
Filed — Alteration
Installation of suspended scaffold for facade work or inspection.
M01158702-P2
11/17/2025
Permit issued — Supported Scaffold
M01154512-I1-SF
11/17/2025
Violation issued (HPD, closed)
I
08/08/2025
Violation issued (ECB, closed)
Unknown
06/27/2025
Cycle 9 facade report signed — UNSAFE
06/18/2025
Cycle 9 facade report submitted
06/18/2025
Cycle 9 facade inspection completed
06/13/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/04/2025
Violation issued (HPD, open)
A
05/07/2025
Filed — Alteration
Installation of suspended scaffold for facade work or inspection.
M01158702-P1
05/06/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Leo Lee
05/06/2025
Special inspection requirement — Post-installed Anchors
Leo Lee
03/28/2025
Permit issued — Sidewalk Shed
M00263105-I1-SH
03/24/2025
Permit issued — General Construction
M01028934-I1-GC
01/16/2025
Permit issued — Suspended Scaffold
M01158702-I1-SC
01/13/2025
Filed — Alteration
Installation of suspended scaffold for facade work or inspection.
M01158702-I1
12/13/2024
Filed — Alteration
INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M00263105-P2
12/12/2024
Filed — Alteration
INSTALLATION OF SUPPORTED SCAFFOLDING IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M01154512-I1
12/12/2024
Permit issued — Supported Scaffold
M01154512-I1-SF
11/26/2024
Filed — Alteration
Facade repairs including terra cotta repair and replacement, brick repair and replacement, cut and repointing at deteriorated joints, and lintel replacement.
M01028934-I1
11/22/2024
Violation issued (HPD, closed)
I
08/13/2024
Permit issued — Boiler Equipment
M01068590-I1-BE
08/06/2024
Permit issued — Plumbing
M01068590-S1-PL
07/23/2024
Permit issued — General Construction
M01068590-S2-GC
07/16/2024
Permit issued — Sidewalk Shed
M00263105-I1-SH
07/02/2024
Filed — Alteration
INSTALL NEW GAS PIPING FROM EXISTING GAS METER AND SERVICE TO REPLACEMENT GAS/OIL BURNER.
M01068590-S2
Latest 60 of 160 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedREPUBLIC EXTERIOR SERVICE04/07/2026
DOB NOWGeneral ConstructionSigned-offSKYLINE RESTORATION INC02/27/2026
DOB NOWSuspended ScaffoldPermit IssuedSKYLINE RESTORATION INC02/26/2026
DOB NOWPlumbingSigned-offBELL FUEL OIL, LLC01/25/2026
DOB NOWBoiler EquipmentSigned-offAPPROVED OIL CO OF BKLYN01/25/2026
DOB NOWBoiler EquipmentSigned-offAPPROVED OIL CO OF BKLYN01/24/2026
DOB NOWSuspended ScaffoldPermit IssuedSKYLINE RESTORATION INC01/16/2026
DOB NOWSupported ScaffoldPermit IssuedREPUBLIC SCAFFOLD&HOIST C11/17/2025
DOB NOWSidewalk ShedPermit IssuedREPUBLIC EXTERIOR SERVICE03/28/2025
DOB NOWGeneral ConstructionSigned-offSKYLINE RESTORATION INC03/24/2025
DOB NOWSuspended ScaffoldPermit IssuedSKYLINE RESTORATION INC01/16/2025
DOB NOWSupported ScaffoldPermit IssuedREPUBLIC SCAFFOLD&HOIST C12/12/2024
DOB NOWBoiler EquipmentSigned-offCAM ENERGY HTG AND MECH08/13/2024
DOB NOWPlumbingSigned-offMARATHON MECHANICAL LLC08/06/2024
DOB NOWGeneral ConstructionSigned-offARISTON CHIMNEY LLC07/23/2024
DOB NOWSidewalk ShedPermit IssuedREPUBLIC EXTERIOR SERVICE07/16/2024
DOB NOWSidewalk ShedPermit IssuedREPUBLIC EXTERIOR SERVICE07/17/2023
DOB NOWMechanical SystemsSigned-offSTONEGATE BUILD INC06/16/2023
DOB NOWSidewalk ShedPermit IssuedREPUBLIC EXTERIOR SERVICE07/01/2022
DOB NOWSidewalk ShedPermit IssuedREPUBLIC SCAFFOLD&HOIST C04/02/2021
DOB NOWSidewalk ShedPermit IssuedREPUBLIC SCAFFOLD&HOIST C11/15/2019
DOB NOWConstruction FenceSigned-offH&Z BUILDING CONSULTING I03/20/2019
DOB NOWConstruction FenceSigned-offH&Z BUILDING CONSULTING I11/01/2017
BISEQISSUEDSAFWAY ATLANTIC, LLC07/20/2021
BISEQISSUEDSAFWAY ATLANTIC, LLC08/03/2020
BISSPISSUEDQMB PLUMBING & HTG INC07/02/2020
BISPLISSUEDQMB PLUMBING & HEATING INC06/30/2020
BIS—ISSUEDSPK/LEWIS CONSTRUCTION LL06/12/2020
BISEQISSUEDSAFWAY ATLANTIC, LLC09/20/2018
BISFPISSUEDMETFLOW FIRE CONTROL LLC05/23/2018
BISOTISSUEDH&Z BUILDING CONSULTING I04/09/2018
BISPLISSUEDTOP PLUMBING GROUP,INC04/09/2018
BISFPISSUEDMETFLOW FIRE CONTROL LLC03/20/2018
BISOTISSUEDH&Z BUILDING CONSULTING I01/25/2018
BISEQISSUEDSAFWAY ATLANTIC, LLC10/30/2017
BISPLISSUEDTOP PLUMBING GROUP,INC09/18/2017
BISMHISSUEDH&Z BUILDING CONSULTING I09/18/2017
BISOTISSUEDH&Z BUILDING CONSULTING I09/05/2017
BISOTISSUEDBOHEMIA J&P LLC05/19/2017
BISOTISSUEDFRANK DENNER ARCHITECTS08/12/2014
+ 15 more permits on file
1 project · most recent 01/23/2026
Gas
FiledStatusContractorScope
01/23/2026Signed-offBELL FUEL OIL, LLCGas
9 projects · most recent 11/18/2025
General Wiring
FiledStatusContractorScope
11/18/2025Pending PaymentLAURA ELEC'L LIGHTING &—
12/17/2024Permit IssuedJTE ELECTRICAL SERVICES—
07/27/2023Permit IssuedROBERT CHIMENTI16 meters, 1 new_meters
01/09/2023CancelledEMPIRE LIC ELECL CONTRS1 meters, 1 new_meters
11/11/2021Permit IssuedY.S ELECTRICGeneral Wiring
08/20/2020Permit IssuedINTERSTATE ELECTRIC, LLCGeneral Wiring
06/30/2020CompleteKWONG MING ELECTRIC INCGeneral Wiring
11/08/2019Permit IssuedNASH ELECTRIC SERVICES IN—
09/11/2018CancelledLAREDO ELECTRIC, INC.General Wiring
1 project · most recent 12/13/2024
Sidewalk Shed
FiledStatusContractorScope
12/13/2024Permit IssuedREPUBLIC EXTERIOR SERVICESidewalk Shed
1 project · most recent 12/01/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
12/01/2025Permit IssuedSKYLINE RESTORATION INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
05/06/2026Pass-Final Boiler Equipment InspectionPassView ↗
04/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/21/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/13/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
12/30/2025Tenant Protection Plan ComplianceLOUIS ARENAspecial
12/30/2025HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
12/30/2025Maintenance informationLOUIS ARENAenergy_progress
12/30/2025HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
12/30/2025HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
12/30/2025Heating SystemsLOUIS ARENAspecial
12/30/2025HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
12/30/2025Heating SystemsLOUIS ARENAspecial
12/30/2025Tenant Protection Plan ComplianceLOUIS ARENAspecial
12/30/2025HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
12/30/2025HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
12/30/2025Maintenance informationLOUIS ARENAenergy_progress
05/06/2025Alternative Materials - OTCR Buildings Bulletin NumberLeo Leespecial
05/06/2025Post-installed AnchorsLeo Leespecial
06/19/2024FinalLOUIS ARENAprogress
06/19/2024Chimneys and ventsLOUIS ARENAspecial
06/19/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
04/02/2024MasonryMichelle Norisspecial
04/02/2024Tenant Protection Plan ComplianceMichelle Norisspecial
04/02/2024Structural Stability – Alterations of existing buildingsMichelle Norisspecial
04/01/2024FinalMichelle Norisprogress
06/22/2023HVAC-R and service water heating equipmentJAE HAK CHUNGenergy_progress
06/22/2023HVAC-R and service water heating system controlsJAE HAK CHUNGenergy_progress
06/22/2023FinalJAE HAK CHUNGprogress
06/22/2023Energy Code Compliance InspectionsJAE HAK CHUNGprogress
Latest 25 of 26.
▾Documents — 383 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch14
09/06/2026M00001429-I1Request digital key ↗
08/30/2026M00884226-I1Request digital key ↗
08/30/2026M00884226-P1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
08/25/2026M00263105-P2Request digital key ↗
08/25/2026M00263105-I1Request digital key ↗
08/25/2026M00263105-P1Request digital key ↗
▸Applications & Permits80
▸BISPLAN / WORK APPROVAL APPLICATION57
10/26/2022123410512Open ↗
08/08/2022123410512Open ↗
06/28/2022123410512Open ↗
Showing 3 of 57 on file for this type
▸BISWORK PERMIT APPLICATION22
07/02/2020123494423Open ↗
06/30/2020123410512Open ↗
06/12/2020123410512Open ↗
Showing 3 of 22 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
09/01/2020123410512Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
08/09/2018123410512Open ↗
▸Seals & Professional Certifications85
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION24
04/12/2019123494423Open ↗
06/22/2018123111346Open ↗
06/22/2018123111346Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/06/2026M00001429-I1Open ↗
08/30/2026M00884226-P1Open ↗
08/30/2026M00884226-I1Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST10
06/14/2018123148833Open ↗
03/08/2018123161504Open ↗
10/31/2017123148833Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026M01068590-S3Open ↗
08/31/2026M01028934-I1Open ↗
08/28/2026M01068590-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026M01068590-S3Open ↗
08/31/2026M01028934-I1Open ↗
08/31/2026M01028934-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
06/14/2018123148833Open ↗
05/02/2018140761940Open ↗
03/08/2018123161504Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
05/02/2018140761940Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
05/02/2018140761940Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment27
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
04/17/2018123111346Open ↗
04/10/2018123111346Open ↗
04/09/2018123111346Open ↗
Showing 3 of 8 on file for this type
▸BISEQUIPMENT USE PERMITS4
06/22/2018123111346Open ↗
06/22/2018123111346Open ↗
06/22/2018123111346Open ↗
Showing 3 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA4
12/31/2020123321208Open ↗
02/28/2020123494423Open ↗
03/30/2018123161504Open ↗
Showing 3 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFIRE ALARM TEST1
02/27/2024123410512Open ↗
▸BISFIRE PROTECTION PLAN (FPP): FDNY APPROVAL1
11/23/2021123410512Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
06/22/2018123111346Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
11/23/2021123410512Open ↗
▸Safety & Tenant Protection6
▸BISTenant Protection Plan and Notes5
04/12/2019123494423Open ↗
03/08/2018123161504Open ↗
02/08/2018123211201Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST1
03/28/2018123410512Open ↗
▸Environmental & Asbestos22
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
07/02/2020123494423Open ↗
06/05/2020123410512Open ↗
05/23/2018140761940Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026M01068590-S1Open ↗
08/27/2026M01068590-I1Open ↗
08/27/2026M01068590-P4Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/27/2026M01068590-S3Open ↗
08/13/2026M01028934-I1Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance20
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
04/05/2019123410512Open ↗
06/22/2018123111346Open ↗
03/28/2018123410512Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
06/22/2018123111346Open ↗
06/26/2017122087776Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
06/05/2020123410512Open ↗
04/21/2017140632769Open ↗
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLIGHTING CONTROLS1
10/28/2021123410512Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/27/2026M01068590-I1Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY6
11/13/2020123494423Open ↗
10/05/2020123494423Open ↗
07/02/2020123494423Open ↗
Showing 3 of 6 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION2
06/22/2018123111346Open ↗
06/22/2018123111346Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
10/28/2021123410512Open ↗
▸Approvals, Objections & Sign-offs40
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST16
01/04/2023102606832Open ↗
10/25/2022123148833Open ↗
06/18/2021102890310Open ↗
Showing 3 of 16 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE12
10/26/2022123410512Open ↗
06/28/2022123410512Open ↗
09/23/2020123410512Open ↗
Showing 3 of 12 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
06/11/2020123410512Open ↗
08/09/2018123410512Open ↗
Showing 2 of 3 on file for this type
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFINAL1
10/24/2022123148833Open ↗
▸Cost, Insurance & Ownership24
▸BISCOST AFFIDAVIT22
06/18/2021140761940Open ↗
01/25/2021123321208Open ↗
04/12/2019123494423Open ↗
Showing 3 of 22 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
01/25/2021123321208Open ↗
11/30/2020123494423Open ↗
▸Filing & Intake Forms43
▸BISEFILING COVER SHEET17
04/18/2019123494673Open ↗
04/12/2019123494423Open ↗
04/12/2019123321208Open ↗
Showing 3 of 17 on file for this type
▸BISADDITIONAL INFORMATION12
11/17/2020123410512Open ↗
11/17/2020123410512Open ↗
10/05/2020123494423Open ↗
Showing 3 of 12 on file for this type
▸BISBOROUGH INTAKE FORM12
12/06/2019123410512Open ↗
11/19/2019123410512Open ↗
03/13/2019123410512Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
05/02/2018140761940Open ↗
Showing 1 of 2 on file for this type
▸Other Documents9
▸DOB NOWManufacturer's Specifications3
08/13/2026M01158702-P2Open ↗
08/13/2026M01158702-I1Open ↗
08/13/2026M01158702-P1Open ↗
▸DOB NOWCalculations3
08/13/2026M01158702-P2Open ↗
08/13/2026M01158702-P1Open ↗
08/13/2026M01158702-I1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
05/02/2018140761940Open ↗
Showing 1 of 2 on file for this type
▸BISSP/SD DEVICE CERT : LTR-LIC ELECT1
01/08/2021123494423Open ↗