ECB02/09/1998WORK DONE CONTRARY TO APPROVED NOTED: VERTICAL ENLARGEMENT TO GARAGE AND HORIZONTAL EXTENSION TO DWELLING IS CONTRARY TO DEPT. OF BUILDINGS PLAN NB 364/40. REMEDY: CONFORM TO APPROVED PLANS ON FILE OBTAIN PERMINothing owed — awaiting certificate of correction
ECB03/23/1996WORK WITHOUT A PERMIT. TO WIT: CONSTRUCTED ONE STORY 2 CAR GARAGE AND AN EXTENSION HAS BEEN PLACED AT RIGHT SIDE 20THX2 STORY HIGH WITH BRICK VENEER. REMEDY: OBTAIN PERMIT AND APPROVALS FROM DEPT. OF BUILDING.Nothing owed — awaiting certificate of correction
ECB02/24/1993BUILDING IS CONTRARY TO APPROVED PLANS. NOTED: 1.TWO STORY,TOW CAR GARAGE IS CONTRARY TO NB 364/40 WHICH DESIGNATES ONE STORY GARAGE. 2. RIGHT SIDE TWO STORY ADDITION DOES NOT APPEAR ON APPROVED PLANS NBNothing owed — awaiting certificate of correction
ECB08/05/1992WRK WITHOUT A PERMIT WORK NOTED CONSTRUCTED A ONE STORY,TWO CAR GARAGE AN EXTENSION HAS BEEN PLACED AT RIGHT SIDE,APPROX.20'-0"WIDE TWO STORYS HIGH,WITH BRICK VENEER.REMEDY:OBTAIN A VALID PERMIT IF FEASIBLE ORNothing owed — awaiting certificate of correction
ECB04/30/1990FAILURE TO PROVIDE CONTRACTOR'S SIGN. REMEDY: PROVIDE CONTRACTORS SIGN. FAILURE TO PROPERLY STORE BUILDING MATERIALS AND EQUIPMENT.Nothing owed — awaiting certificate of correction
ECB04/30/1990WORK WITHOUT A PERMIT. INTERIOR WORK ENTIRE HOUSE 2 2 STY INTERIOR ONLY. REMEDY: STOP ALL WORK, OBTAIN A PERMIT.Nothing owed — awaiting certificate of correction
ECB04/30/1990WORK WITHOUT A PERMIT. 1 STY 2 CAR GARAGE CONVERTED TO 2 STY 2 CAR GARAGE A EXTENSION HAS BEEN PLACED AT RIGHT SIDE APPROX. 20FT WIDE 2 STYHIGH. ENTIRE STRUCTURE HAS BEEN BRICK VENEERED. REMEDY: STOP ALL WORKNothing owed — awaiting certificate of correction