← Back
Two family frame
118 SCHAEFER STREET
BROOKLYN · BIN 3079442
💬 Discuss this project
1925Year Built
2Stories
B2Building Class
R6Zoning
2,430 sfGross Floor Area
2Units
0 Open Violations
Two family frame · Owner of record: 204 BRICKS LLC · 1,800 sf lot · 1.35 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralGeneral
Roof3p · 1 filing · 12 docs
Bulkhead1p · 1 filing · 12 docs
Floor 21p · 1 filing · 12 docs
Floor 1
Cellar1p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BRICKSTONE GROUP904/09/2026
204 BRICKS LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/16/2024$998K—— → —$411/sf building
10/16/2024$980K—— → —$403/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CLIP ARCHITECTS410/23/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WM ARCH803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MORELL BUILDERS INCGeneral Contractor204/09/2026
PLBG P & H INCPlumbing207/08/2026
FLOW STATE ELECTRIC, LLCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
D&E BUILD EVERGREEN I9342210/23/2025
Building Lifecycle
All (36)Filed (4)Permit Issued (4)Signed Off (3)Violation (2)Inspection (6)Special Inspection (17)
03/13/2026
Signed off — Alteration
INTERIOR RENOVATION ON EXISTING 2-FAMILY HOUSE WITH PARTITION MECHANICAL WORK AT THE CELLAR, BASEMENT, 1ST, 2ND FLOOR, BULKHEAD AND OPEN SPACE. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B01125365-S1
02/19/2026
Permit issued — Plumbing
B01125365-S1-PL
12/09/2025
Signed off — Alteration
B01124013-I1
11/25/2025
Signed off — Alteration
INTERIOR RENOVATION ON EXISTING 2-FAMILY HOUSE WITH PARTITION MECHANICAL WORK AT THE CELLAR, BASEMENT, 1ST, 2ND FLOOR, BULKHEAD AND OPEN SPACE. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B01125365-I1
11/20/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/09/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/23/2025
Filed — Alteration
INTERIOR RENOVATION ON EXISTING 2-FAMILY HOUSE WITH PARTITION MECHANICAL WORK AT THE CELLAR, BASEMENT, 1ST, 2ND FLOOR, BULKHEAD AND OPEN SPACE. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B01125365-P1
10/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Danny Chen
10/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Danny Chen
10/21/2025
Special inspection requirement — Energy Code Compliance Inspections
Jaeyoung Jang
10/21/2025
Special inspection requirement — Final
Jaeyoung Jang
10/21/2025
Special inspection requirement — Fire-Resistance Rated Construction
Jaeyoung Jang
10/21/2025
Special inspection requirement — Structural Wood Frame
Jaeyoung Jang
10/21/2025
Special inspection requirement — Air barrier - visual inspection
Jaeyoung Jang
10/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Jaeyoung Jang
10/21/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Jaeyoung Jang
10/21/2025
Special inspection requirement — Fenestration air leakage
Jaeyoung Jang
10/21/2025
Special inspection requirement — Insulation placement and R values
Jaeyoung Jang
10/21/2025
Special inspection requirement — Fenestration areas
Jaeyoung Jang
10/21/2025
Special inspection requirement — Interior lighting power
Jaeyoung Jang
10/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
Jaeyoung Jang
10/21/2025
Special inspection requirement — Maintenance information
Jaeyoung Jang
10/21/2025
Special inspection requirement — Metering
Jaeyoung Jang
10/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
Jaeyoung Jang
07/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/07/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/06/2024
Permit issued — General Construction
B01125365-I1-GC-CX
11/04/2024
Permit issued — Plumbing
B01125365-S1-PL
10/30/2024
Permit issued — Construction Fence
B01124013-I1-FN
10/28/2024
Filed — Alteration
INTERIOR RENOVATION ON EXISTING 2-FAMILY HOUSE WITH PARTITION MECHANICAL WORK AT THE CELLAR, BASEMENT, 1ST, 2ND FLOOR, BULKHEAD AND OPEN SPACE. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B01125365-S1
10/28/2024
Filed — Alteration
INTERIOR RENOVATION ON EXISTING 2-FAMILY HOUSE WITH PARTITION MECHANICAL WORK AT THE CELLAR, BASEMENT, 1ST, 2ND FLOOR, BULKHEAD AND OPEN SPACE. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B01125365-I1
10/08/2024
Filed — Alteration
B01124013-I1
06/02/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/1994
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPLBG P & H INC02/19/2026
DOB NOWGeneral ConstructionSigned-offMORELL BUILDERS INC11/06/2024
DOB NOWPlumbingSigned-offPLBG P & H INC11/04/2024
DOB NOWConstruction FenceSigned-offMORELL BUILDERS INC10/30/2024
1 project · most recent 09/04/2025
General Wiring
FiledStatusContractorScope
09/04/2025CompleteFLOW STATE ELECTRIC, LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
11/20/2025Pass-Final General Construction Non-Directive 14PassView ↗
11/09/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/07/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/07/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
10/21/2025Fire-Resistant Penetrations and JointsDanny Chenspecial
10/21/2025Structural Stability – Alterations of existing buildingsDanny Chenspecial
10/21/2025Energy Code Compliance InspectionsJaeyoung Jangprogress
10/21/2025FinalJaeyoung Jangprogress
10/21/2025Fire-Resistance Rated ConstructionJaeyoung Jangprogress
10/21/2025Structural Wood FrameJaeyoung Jangprogress
10/21/2025Air barrier - visual inspectionJaeyoung Jangenergy_progress
10/21/2025HVAC-R and service water piping design and insulationJaeyoung Jangenergy_progress
10/21/2025Fenestration and door U-factor and product ratingsJaeyoung Jangenergy_progress
10/21/2025Fenestration air leakageJaeyoung Jangenergy_progress
10/21/2025Insulation placement and R valuesJaeyoung Jangenergy_progress
10/21/2025Fenestration areasJaeyoung Jangenergy_progress
10/21/2025Interior lighting powerJaeyoung Jangenergy_progress
10/21/2025HVAC-R and service water heating system controlsJaeyoung Jangenergy_progress
10/21/2025Maintenance informationJaeyoung Jangenergy_progress
10/21/2025MeteringJaeyoung Jangenergy_progress
10/21/2025HVAC-R and service water heating equipmentJaeyoung Jangenergy_progress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/23/2026B01124013-I1Request digital key ↗
08/23/2026B01125365-P1Request digital key ↗
08/23/2026B01125365-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/23/2026B01124013-I1Open ↗
08/23/2026B01125365-I1Open ↗
08/13/2026B01125365-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026B01125365-P1Open ↗
08/23/2026B01125365-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026B01125365-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/23/2026B01125365-I1Open ↗
08/13/2026B01125365-P1Open ↗
08/13/2026B01125365-S1Open ↗