← Back
BuildNYC
Dormitory
118 WEST 13TH STREET
MANHATTAN · West Village · BIN 1010613
💬 Discuss this project
1931Year Built
7Stories
H8Building Class
—Zoning
28,516 sfGross Floor Area
2Units
LL97 CoveredRent Stabilized2 Active Violations ▸FISP: UNSAFE
Dormitory · Owner of record: 118 West 13th Street Owner · 6,453 sf lot · 4.42 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofThe New SchoolUnder Construction168p · 9 filings · 20 docs
Bulkhead118W13 structural workUnder Construction10p · 2 filings · 20 docs
Floor 7The New School142p · 5 filings · 20 docs
Floor 6The New SchoolUnder Construction123p · 7 filings · 20 docs
Floor 5The New School137p · 5 filings · 20 docs
Floor 4The New School115p · 5 filings · 20 docs
Floor 3The New School13p · 7 filings · 20 docs
Floor 2The New SchoolUnder Construction171p · 6 filings · 20 docs
Floor 1The New School172p · 7 filings · 20 docs
CellarThe New School142p · 5 filings · 20 docs
Site & exterior118 West 13th St Owner LLC170p · 7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
The New School2203/21/2026
New School University1703/21/2026
Structural Preservation System807/08/2026
Safecore Developers804/09/2026
SD Builders and Construction210/08/2026
118 West 13th Street Owner103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/09/2021$22.9M—— → —$801/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB Building Consulting1003/21/2026
Pristine Gutters403/21/2026
Expediting403/21/2026
JM Zoning4803/21/2026
Design 2147803/21/2026
Platinum Services NY403/21/2026
Rigid Structural Design203/21/2026
Green Studio203/21/2026
A1 Expediting Service203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
The Organic Gardener NYC*General Contractor3607/08/2026
Eca DevelopersGeneral Contractor1707/08/2026
The Organic Gardener NYC*Scaffold1407/08/2026
Platinum Services NYScaffold1208/11/2026
Sasco Construction SvceScaffold907/08/2026
Tri ContractingGeneral Contractor707/08/2026
Eca DevelopersScaffold407/08/2026
E.M.P. Fire SprinklerFire Protection310/04/2026
Zapas ConstructionPlumbing207/08/2026
Rockledge ScaffoldScaffold203/21/2026
Advanced Plumbing, Mechanical & SprinklerFire Protection207/08/2026
A. Tobin InteriorsGeneral Contractor207/09/2026
Pacific Plumbing & HeatingFire Protection207/08/2026
Dynatec ContractingGeneral Contractor203/21/2026
Emp Fire SprinklerScaffold104/09/2026
Etech ElectricalElectrical103/21/2026
Aurous Construction Coll*General Contractor104/09/2026
Home AirGeneral Contractor107/08/2026
JS Realty DevelopmentGeneral Contractor104/09/2026
Sasco Construction SvceGeneral Contractor109/22/2026
Trident Builders GroupGeneral Contractor110/03/2026
Intelogic ElectricElectrical103/21/2026
Garden State ConstructionScaffold104/09/2026
JS Realty DevelopmentScaffold104/09/2026
Advanced Plumbing MechanicalPlumbing107/08/2026
Crossfield Plumbing & HeatingPlumbing106/28/2026
P.S.I. MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Big Apple Group NY A Rma91682310/07/2026
Geiger Engineering689107/07/2026
1+1 Design Studio1039104/10/2026
WKC Engineering9718302/11/2026
Cthree Architecture + Des1124302/11/2026
Welldone Inspection8628102/11/2026
Prise Construction Management9248211/17/2025
Napach Architectu2945101/15/2020
Kline Engineering1007201/10/2020
Building Lifecycle
All (300)Filed (54)Permit Issued (80)Signed Off (18)Facade (FISP) (19)Violation (60)Inspection (15)Objection (24)Special Inspection (30)
10/20/2026
Objection resolved — Resolved
10/15/2026
Objection raised — Admin
10/09/2026
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AND OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE 2022. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00841966-I1
10/07/2026
Filed — Alteration CO
MECHANICAL WORK FILED IN CONJUNCTION WITH ALT-CO APPLICATION.
M00635385-A7
10/05/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
SOORJBALLY HARILALL
10/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
10/05/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
SOORJBALLY HARILALL
10/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
Soorjbally Harilall
10/05/2026
Special inspection requirement — Masonry
SOORJBALLY HARILALL
10/05/2026
Special inspection requirement — Sprayed fire-resistant materials
SOORJBALLY HARILALL
10/02/2026
Permit issued — General Construction
M00635385-I1-GC
09/29/2026
Signed off — Alteration
FACADE APPLICATION FILED IN COMPLIANCE WITH LOCAL LAW 11- FISP.
M01426551-I1
09/21/2026
Permit issued — General Construction
M01426551-I1-GC
08/12/2026
Signed off — Alteration CO
MECHANICAL WORK FILED IN CONJUNCTION WITH ALT-CO APPLICATION.
M00635385-S7
08/10/2026
Permit issued — Sidewalk Shed
M00841966-I1-SH
07/13/2026
Special inspection requirement — Final
Benjamin Carr
07/10/2026
Filed — Alteration
PROPOSE INTERIOR RENOVATION ON 6TH FLOOR APPARTMENT, WORKS INCLUDES MINOR PARTITIONS, ANDFINISH WORKS AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
M01347374-P1
07/08/2026
Cycle 9 facade inspection completed
07/07/2026
Filed — Alteration
FACADE APPLICATION FILED IN COMPLIANCE WITH LOCAL LAW 11- FISP.
M01426551-I1
07/07/2026
Permit issued — General Construction
M01352966-I1-GC
07/07/2026
Special inspection requirement — Masonry
FADY HABEEL
07/06/2026
Special inspection requirement — Final
FADY HABEEL
06/29/2026
Permit issued — Structural
M01352966-S2-ST
06/25/2026
Signed off — Alteration
M01167906-I1
06/24/2026
Objection raised — Scope
06/24/2026
Objection raised — Scope
06/24/2026
Objection raised — Inspections
06/24/2026
Objection raised — Scope
06/24/2026
Objection raised — Cost
06/24/2026
Objection raised — Other
06/24/2026
Objection raised — Other
06/24/2026
Objection raised — Other
06/03/2026
Filed — Alteration
Installation of air handling units for existing condenser system with associated ductwok and piping. No change to occupancy or egress.
M01352966-S3
05/28/2026
Permit issued — Plumbing
M01352966-S1-PL
05/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/22/2026
Special inspection requirement — Mechanical Systems
05/22/2026
Special inspection requirement — Post-installed Anchors
05/22/2026
Special inspection requirement — Final
05/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
05/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
05/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
05/22/2026
Special inspection requirement — Maintenance information
05/19/2026
Permit issued — Sidewalk Shed
M00841966-I1-SH
05/01/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/23/2026
Permit issued — Mechanical Systems
M01373471-I1-MS
04/16/2026
Cycle 9 facade report submitted
04/10/2026
Filed — Alteration
FILE MECHANICAL WORK TYPE TO RELOCATE 1 AND REPLACE 1 INDOOR AIR HANDLER UNIT.NO CHANGE IN USE, EGRESS, OCCUPANCY AND BULK
M01373471-I1
04/01/2026
Special inspection requirement — Post-installed Anchors
Hung Pui Ho
04/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hung Pui Ho
03/31/2026
Signed off — Alteration CO
MECHANICAL WORK FILED IN CONJUNCTION WITH ALT-CO APPLICATION.
M00635385-S2
03/31/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
SOORJBALLY HARILALL
03/31/2026
Special inspection requirement — Fire-Resistance Rated Construction
Soorjbally Harilall
03/31/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
SOORJBALLY HARILALL
03/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
03/31/2026
Special inspection requirement — Sprayed fire-resistant materials
SOORJBALLY HARILALL
03/31/2026
Special inspection requirement — Masonry
SOORJBALLY HARILALL
03/24/2026
Filed — Alteration CO
MECHANICAL WORK FILED IN CONJUNCTION WITH ALT-CO APPLICATION.
M00635385-A6
03/24/2026
Special inspection requirement — Sprayed fire-resistant materials
SOORJBALLY HARILALL
03/24/2026
Special inspection requirement — Masonry
SOORJBALLY HARILALL
03/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTrident Builders Group10/02/2026
DOB NOWGeneral ConstructionSigned-offSasco Construction Svce09/21/2026
DOB NOWSidewalk ShedSigned-offPlatinum Services NY08/10/2026
DOB NOWGeneral ConstructionPermit IssuedA. Tobin Interiors07/07/2026
DOB NOWStructuralPermit IssuedA. Tobin Interiors06/29/2026
DOB NOWPlumbingPermit IssuedP.S.I. Mechanical05/28/2026
DOB NOWSidewalk ShedSigned-offPlatinum Services NY05/19/2026
DOB NOWMechanical SystemsPermit IssuedHome Air04/23/2026
DOB NOWPlumbingPermit IssuedCrossfield Plumbing & Heating03/13/2026
DOB NOWGeneral ConstructionPermit IssuedAurous Construction Coll*03/06/2026
DOB NOWSidewalk ShedSigned-offPlatinum Services NY02/18/2026
DOB NOWGeneral ConstructionPermit IssuedJS Realty Development01/09/2026
DOB NOWConstruction FenceSigned-offJS Realty Development01/09/2026
DOB NOWSprinklersSigned-offE.M.P. Fire Sprinkler12/04/2025
DOB NOWSuspended ScaffoldPermit IssuedSafecore Developers10/16/2025
DOB NOWGeneral ConstructionPermit IssuedThe Organic Gardener NYC*09/11/2025
DOB NOWConstruction FenceSigned-offThe Organic Gardener NYC*07/01/2025
DOB NOWGeneral ConstructionPermit IssuedThe Organic Gardener NYC*07/01/2025
DOB NOWSuspended ScaffoldPermit IssuedSafecore Developers04/30/2025
DOB NOWConstruction FenceSigned-offThe Organic Gardener NYC*03/27/2025
DOB NOWGeneral ConstructionPermit IssuedThe Organic Gardener NYC*03/27/2025
DOB NOWStructuralSigned-offThe Organic Gardener NYC*03/27/2025
DOB NOWSupported ScaffoldSigned-offSasco Construction Svce03/26/2025
DOB NOWSidewalk ShedSigned-offPlatinum Services NY02/18/2025
DOB NOWSuspended ScaffoldPermit IssuedPhoenix Sutton Structural01/31/2025
DOB NOWGeneral ConstructionSigned-offThe Organic Gardener NYC*11/06/2024
DOB NOWSupported ScaffoldSigned-offSasco Construction Svce10/08/2024
DOB NOWPlumbingSigned-offZapas Construction10/03/2024
DOB NOWSprinklersSigned-offE.M.P. Fire Sprinkler08/29/2024
DOB NOWSuspended ScaffoldPermit IssuedConstructed08/28/2024
DOB NOWSuspended ScaffoldSigned-offConstructed08/15/2024
DOB NOWSidewalk ShedSigned-offSasco Construction Svce07/15/2024
DOB NOWSupported ScaffoldSigned-offSasco Construction Svce07/15/2024
DOB NOWConstruction FenceSigned-offThe Organic Gardener NYC*05/29/2024
DOB NOWStructuralSigned-offThe Organic Gardener NYC*05/29/2024
DOB NOWGeneral ConstructionPermit IssuedThe Organic Gardener NYC*05/29/2024
DOB NOWConstruction FenceSigned-offThe Organic Gardener NYC*05/28/2024
DOB NOWStructuralSigned-offThe Organic Gardener NYC*05/28/2024
DOB NOWGeneral ConstructionPermit IssuedThe Organic Gardener NYC*04/23/2024
DOB NOWStandpipeSigned-offPacific Plumbing & Heating03/20/2024
+ 25 more permits on file
3 projects · most recent 10/07/2026
Heating and Air Conditioning Systems Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/07/2026Permit IssuedTrident Builders GroupAir Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric n/a 24,000 BTU · Fan Coil Indoor ×94
N/A 18,000 BTU · Fan Coil Indoor ×2
PUZ-A24NHA7 775 CFM · Ductwork ×2
TUHYE0963AN41AN 24,000 BTU · Vrf Outdoor ×2
Heat / Cool
Mitsubishi Electric NTXMSM48A182BA 48,000 BTU · Condensing Unit ×12
MXZ-SM60NAM2 60,000 BTU · Condensing Unit ×8
MXZ-SM36NAM 36,000 BTU · Condensing Unit ×4
TUHYE0723AN41AN 72,000 BTU · Condensing Unit ×2
TUHYE0963AN41AN 96,000 BTU · Vrf Outdoor ×2
Ventilation
Mitsubishi Electric n/a 440 CFM ×8
06/03/2026Permit IssuedA. Tobin InteriorsHeating and Air Conditioning Systems
Heat / Cool
04/10/2026Permit IssuedHome AirHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PEFY-P12NMAU-E4 12,000 BTU · Vrf Indoor ×1
Trane TPVFYP012AM141A 12,000 BTU · Vrf Indoor ×1
1 project · most recent 10/07/2026
Sprinkler System
FiledStatusContractorScope
10/07/2026Signed-offE.M.P. Fire SprinklerSprinkler System
3 projects · most recent 10/07/2026
Water/Sanitary Storm Gas
FiledStatusContractorScope
10/07/2026Signed-offZapas ConstructionGas, Storm, Water/Sanitary
07/10/2026Permit IssuedCrossfield Plumbing & HeatingWater/Sanitary
01/15/2020Permit IssuedAdvanced P, Mechanical & SprinklerStorm, Water/Sanitary
12 projects · most recent 10/06/2026
General Wiring Lighting
FiledStatusContractorScope
10/06/2026Permit IssuedDceGeneral Wiring
06/19/2026CompleteBlue Seagull ElectricalGeneral Wiring
05/19/2026CompleteEtech ElectricalGeneral Wiring
03/12/2026Permit IssuedIntelogic ElectricGeneral Wiring
10/28/2025CompleteEtech ElectricalGeneral Wiring
10/21/2025CompleteBlue Seagull ElectricalGeneral Wiring
04/02/2024CompleteKJK Electric—
09/14/2023Permit IssuedShelby ElectricalGeneral Wiring
03/10/2023Permit IssuedIlluminous ElectricGeneral Wiring
01/30/2023CompleteShelby Electrical—
09/07/2022CancelledRGF Electric—
05/17/2018CompleteAnthony G FerryLighting
3 projects · most recent 10/07/2026
Steel Concrete
FiledStatusContractorScope
10/07/2026Permit IssuedTrident Builders GroupSteel, Concrete
07/10/2026Permit IssuedCrossfield Plumbing & Heating1 scope_items
03/17/2022——Steel, Concrete
1 project · most recent 07/10/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
07/10/2026Permit IssuedCrossfield Plumbing & HeatingTenant Protection Plan 72 Hour
1 project · most recent 11/17/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
11/17/2025Permit IssuedSafecore DevelopersSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
05/01/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/14/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/08/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/17/2025Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
03/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/07/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
03/07/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
02/20/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/31/2025Pass-Final General Construction Non-Directive 14PassView ↗
01/09/2025Fail-Final General Construction Non-Directive 14FailView ↗
05/24/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/19/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/19/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 126
DateRequirementInspectorRole
10/05/2026Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
10/05/2026Sprayed fire-resistant materialsSOORJBALLY HARILALLspecial
10/05/2026Mastic and Intumescent Fire-resistant CoatingsSOORJBALLY HARILALLspecial
10/05/2026MasonrySOORJBALLY HARILALLspecial
10/05/2026Fire-Resistance Rated ConstructionSoorjbally Harilallprogress
10/05/2026Wall Panels, Curtain Walls, and VeneersSOORJBALLY HARILALLspecial
07/13/2026FinalBenjamin Carrprogress
07/07/2026MasonryFADY HABEELspecial
07/06/2026FinalFADY HABEELprogress
05/22/2026Mechanical Systems—special
05/22/2026HVAC-R and service water piping design and insulation—energy_progress
05/22/2026HVAC-R and service water heating equipment—energy_progress
05/22/2026Maintenance information—energy_progress
05/22/2026HVAC-R and service water heating system controls—energy_progress
05/22/2026Final—progress
05/22/2026Fire-Resistant Penetrations and Joints—special
05/22/2026Post-installed Anchors—special
04/01/2026Fire-Resistant Penetrations and JointsHung Pui Hospecial
04/01/2026Post-installed AnchorsHung Pui Hospecial
03/31/2026Mastic and Intumescent Fire-resistant CoatingsSOORJBALLY HARILALLspecial
03/31/2026Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
03/31/2026Wall Panels, Curtain Walls, and VeneersSOORJBALLY HARILALLspecial
03/31/2026Sprayed fire-resistant materialsSOORJBALLY HARILALLspecial
03/31/2026MasonrySOORJBALLY HARILALLspecial
03/31/2026Fire-Resistance Rated ConstructionSoorjbally Harilallprogress
Latest 25 of 126.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
The New SchoolEducationCellar, Floors 1–7, Roof
Project M00292935 Alteration · Permit Entire · 01/15/2020
Project M00292953 Alteration · Permit Entire · 01/10/2020
Project M00293043 Alteration · Permit Entire · 01/10/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 436 on file (BIS + DOB NOW)
▸Plans & Drawings53
▸DOB NOWPlans/Sketch49
09/06/2026M00045396-I1Request digital key ↗
09/03/2026M00607486-I1Request digital key ↗
09/03/2026M00635385-P8Request digital key ↗
Showing 3 of 49 on file for this type
▸DOB NOWPlans/Sketch - Standpipe1
09/05/2026M00293043-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/05/2026M00292953-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00292935-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00292651-I1Request digital key ↗
▸Applications & Permits60
▸DOB NOWLPC Approval/Permit35
09/05/2026M00292651-I1Open ↗
09/02/2026M00693863-I1Open ↗
09/02/2026M00701511-I1Open ↗
Showing 3 of 35 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION19
01/06/2026123846543Open ↗
01/06/2026123234972Open ↗
12/24/2025123423385Open ↗
Showing 3 of 19 on file for this type
▸BISWORK PERMIT APPLICATION6
12/27/2019123846543Open ↗
10/10/2018123234972Open ↗
08/08/2018123191811Open ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records3
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
04/11/2025124041839Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
04/11/2025124041839Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications160
▸DOB NOWSpecial Inspector Seal & Signature70
10/09/2026M00635385-A7Open ↗
10/09/2026M00635385-A7Open ↗
10/09/2026M00635385-A7Open ↗
Showing 3 of 70 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature51
09/06/2026M00045396-I1Open ↗
09/05/2026M00293043-I1Open ↗
09/05/2026M00292953-I1Open ↗
Showing 3 of 51 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
10/09/2026M00635385-A7Open ↗
10/01/2026M00635385-P1Open ↗
09/28/2026M00635385-A5Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
12/27/2019123846543Open ↗
12/17/2019123846543Open ↗
10/10/2018123234972Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
12/17/2019123846543Open ↗
02/01/2018123191811Open ↗
05/01/2014140193154Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
12/17/2019123846543Open ↗
02/01/2018123191811Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
05/01/2014140193154Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/01/2014140193154Open ↗
▸Trade Schedules & Equipment8
▸DOB NOWFDNY: Letter of No Objection5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
03/13/2018123385149Open ↗
03/12/2018123385158Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
07/29/2011120470631Open ↗
▸Safety & Tenant Protection28
▸DOB NOWStreet Tree Checklist9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST6
12/27/2019123846543Open ↗
04/12/2018123191811Open ↗
03/13/2018123385149Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist6
09/06/2026M00045396-I1Open ↗
09/05/2026M00292651-I1Open ↗
Showing 2 of 6 on file for this type
▸BISTenant Protection Plan and Notes3
05/31/2018123234972Open ↗
03/13/2018123385149Open ↗
03/12/2018123385158Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISHPD: SRO MD CERTIFICATE OF NO HARASSMENT1
05/31/2018123234972Open ↗
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos29
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/05/2026M00293043-I1Open ↗
09/05/2026M00292953-I1Open ↗
09/05/2026M00292651-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form9
09/03/2026M00635385-I1Open ↗
09/03/2026M00635385-S1Open ↗
09/03/2026M00635385-S2Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
12/17/2019123846543Open ↗
06/01/2018123423385Open ↗
05/31/2018123234972Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
09/22/2010120470631Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
12/17/2019123846543Open ↗
05/31/2018123234972Open ↗
02/01/2018123191811Open ↗
Showing 3 of 4 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
05/01/2014140193154Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
04/26/2012120470631Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
05/01/2014140193154Open ↗
▸Approvals, Objections & Sign-offs22
▸BISLETTERS - SUPPORTING DOCUMENTATION6
04/30/2025124041839Open ↗
04/15/2025124041839Open ↗
04/11/2025124041839Open ↗
Showing 3 of 6 on file for this type
▸BISLANDMARKS APPROVAL6
12/27/2019123846543Open ↗
09/18/2018123234972Open ↗
04/13/2018123191811Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
09/06/2026M00045396-I1Open ↗
09/05/2026M00292953-I1Open ↗
09/05/2026M00292651-I1Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
10/02/2018123191811Open ↗
10/10/2014140193154Open ↗
09/04/2014121833720Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
09/22/2010120470631Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT11
12/17/2019123846543Open ↗
10/02/2018123191811Open ↗
06/01/2018123423385Open ↗
Showing 3 of 11 on file for this type
▸Filing & Intake Forms17
▸BISEFILING COVER SHEET9
03/12/2025124041839Open ↗
12/17/2019123846543Open ↗
06/01/2018123423385Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION3
04/23/2025124041839Open ↗
04/15/2025124041839Open ↗
12/17/2019123846543Open ↗
▸BISBOROUGH INTAKE FORM3
10/02/2018123191811Open ↗
04/25/2018123385149Open ↗
04/25/2018123385158Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/01/2014140193154Open ↗
▸BISHPD-3 - SRO MD ANTI-HARASSEMENT CHECKLIST1
01/13/2014121833720Open ↗
▸Other Documents38
▸DOB NOWProof of Historic Building12
09/02/2026M00701511-I1Open ↗
Showing 1 of 12 on file for this type
▸DOB NOWProperty Ownership Certification8
09/03/2026M00635385-P9Open ↗
09/03/2026M00635385-A5Open ↗
09/03/2026M00635385-A6Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWManufacturer's Specifications5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWCalculations5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
12/17/2019123846543Open ↗
11/09/2013121833720Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISVERIFY DOB PLAN NAMING STANDARD IS MET1
04/23/2025124041839Open ↗
▸BISPLOT DIAGRAM1
04/11/2025124041839Open ↗
▸BISFEE EXEMPTION DOCUMENTATION1
05/01/2014140193154Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
04/15/2025124041839Open ↗