← Back
Walk-up apt, over six families with stores
118 WEST 78 STREET
MANHATTAN · Upper West Side (Central) · BIN 1030218
💬 Discuss this project
1886Year Built
4Stories
C7Building Class
R8BZoning
6,894 sfGross Floor Area
10Units
Rent Stabilized5 Open Violations ▸
Walk-up apt, over six families with stores · 1,660 sf lot · 4.15 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Cellar5p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KEMS ENGINEERING AND CONSTRUCTION404/26/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LEWSAN CONSULTING803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AQUA PLUMBING & HTNG CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EC SPECIAL INSPECTIONS8355504/26/2023
Building Lifecycle
All (27)Filed (4)Permit Issued (2)Violation (11)Inspection (1)Special Inspection (9)
11/22/2024
Violation issued (HPD, closed)
I
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/26/2023
Filed — Alteration
Register Boiler, work done under LAA M00310031-I1
M00804545-P2
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/20/2023
Filed — Alteration
Register Boiler, work done under LAA M00310031-I1
M00804545-P1
04/19/2023
Special inspection requirement — Maintenance information
Steven Bendoraitis
04/19/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Bendoraitis
04/19/2023
Special inspection requirement — HVAC-R and service water heating equipment
Steven Bendoraitis
04/19/2023
Special inspection requirement — HVAC-R and service water heating system controls
Steven Bendoraitis
04/19/2023
Special inspection requirement — Heating Systems
ABDALLAH ELCHERBINI
04/19/2023
Special inspection requirement — Tenant Protection Plan Compliance
03/16/2023
Violation issued (HPD, closed)
A
02/15/2023
Permit issued — Boiler Equipment
M00804545-I1-BE
02/07/2023
Filed — Alteration
Register Boiler, work done under LAA M00310031-I1
M00804545-I1
02/06/2023
Permit issued — Plumbing
M00803943-I1-PL
02/02/2023
Filed — Alteration
Gas piping associated with boiler replacement and indirect water heater
M00803943-I1
01/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
01/05/2023
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
01/05/2023
Special inspection requirement — Tenant Protection Plan Compliance
ABDALLAH ELCHERBINI
04/01/2021
Violation issued (HPD, closed)
A
11/06/2017
Violation issued (HPD, closed)
I
10/26/2016
Violation issued (HPD, closed)
I
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/06/1988
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offAQUA PLUMBING & HTNG CORP02/15/2023
DOB NOWPlumbingPermit IssuedAQUA PLUMBING & HTNG CORP02/06/2023
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
04/25/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
04/19/2023Maintenance informationSteven Bendoraitisenergy_progress
04/19/2023HVAC-R and service water piping design and insulationSteven Bendoraitisenergy_progress
04/19/2023HVAC-R and service water heating equipmentSteven Bendoraitisenergy_progress
04/19/2023HVAC-R and service water heating system controlsSteven Bendoraitisenergy_progress
04/19/2023Heating SystemsABDALLAH ELCHERBINIspecial
04/19/2023Tenant Protection Plan Compliance—special
01/05/2023Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
01/05/2023Energy Code Compliance InspectionsSteven Bendoraitisprogress
01/05/2023Tenant Protection Plan ComplianceABDALLAH ELCHERBINIspecial
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/31/2026M00803943-I1Request digital key ↗
08/31/2026M00804545-P1Request digital key ↗
08/31/2026M00804545-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits4
▸DOB NOWLPC Approval/Permit4
08/13/2026M00803943-I1Open ↗
08/13/2026M00804545-P2Open ↗
08/13/2026M00804545-I1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWProgress Inspector Seal & Signature5
09/27/2026M00803943-I1Open ↗
08/24/2026M00804545-P1Open ↗
08/24/2026M00804545-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/31/2026M00804545-P2Open ↗
08/31/2026M00804545-P1Open ↗
08/31/2026M00804545-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/27/2026M00803943-I1Open ↗
08/24/2026M00804545-P1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/31/2026M00804545-P2Open ↗
08/31/2026M00804545-P1Open ↗
08/31/2026M00804545-I1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents1
▸DOB NOWDHCR Document1
08/13/2026M00803943-I1Open ↗