← Back
Two stories - detached, small or mid-size
118 WINHAM AVENUE
STATEN ISLAND · BIN 5056079
💬 Discuss this project
1910Year Built
2Stories
A1Building Class
R3-1Zoning
1,848 sfGross Floor Area
1Units
2 Open Violations 1 unresolved · 1 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: IMC 1688 LLC · 3,475 sf lot · 0.53 FAR built · Flood zone X500
Locations of Work
ArchitectureElectricalPlumbingGeneral
Roof4p · 1 filing · 20 docs
Floor 26p · 1 filing · 20 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CUBE BUILDERS GROUP NY CU103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIC 88 CORP611/20/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PIPESTYLISTS, INCPlumbing207/08/2026
CUBE BUILDERS GROUP NYGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIC 88 CORP8371411/20/2025
NIC DESIGN INC9758205/22/2025
Building Lifecycle
All (33)Filed (6)Permit Issued (3)Signed Off (2)Violation (3)Inspection (3)Special Inspection (16)
05/28/2026
Violation issued (ECB, open)
Construction
12/24/2025
Signed off — Alteration
INSTALL GAS AND PLUMBING FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
S01208402-I1
12/23/2025
Signed off — Alteration
INSTALL GAS AND PLUMBING FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
S01208402-S1
11/25/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
11/20/2025
Filed — Alteration
INSTALL GAS AND PLUMBING FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
S01208402-P4
11/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
10/08/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/23/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/21/2025
Filed — Alteration
INSTALL GAS AND PLUMBING FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
S01208402-P3
07/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
07/03/2025
Filed — Alteration
INSTALL GAS AND PLUMBING FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
S01208402-P2
07/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
06/06/2025
Filed — Alteration
INSTALL GAS AND PLUMBING FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
S01208402-P1
06/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
06/06/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
06/06/2025
Special inspection requirement — Final
Eric Sun
06/06/2025
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sun
06/06/2025
Special inspection requirement — Interior lighting power
Eric Sun
06/06/2025
Special inspection requirement — Insulation placement and R values
Eric Sun
06/05/2025
Permit issued — Plumbing
S01208402-S1-PL
05/27/2025
Permit issued — Plumbing
S01208402-S1-PL
05/22/2025
Filed — Alteration
INSTALL GAS AND PLUMBING FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
S01208402-S1
05/22/2025
Special inspection requirement — Final
Eric Sun
05/22/2025
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sun
05/22/2025
Special inspection requirement — Insulation placement and R values
Eric Sun
05/22/2025
Special inspection requirement — Interior lighting power
Eric Sun
05/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
05/22/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
05/16/2025
Violation issued (ECB, closed)
Construction
04/22/2025
Permit issued — General Construction
S01208402-I1-GC
04/18/2025
Filed — Alteration
INSTALL GAS AND PLUMBING FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
S01208402-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offT & T PLUMBING INC06/05/2025
DOB NOWPlumbingSigned-offT & T PLUMBING INC05/27/2025
DOB NOWGeneral ConstructionSigned-offCUBE BUILDERS GROUP NY04/22/2025
1 project · most recent 06/04/2025
General Wiring
FiledStatusContractorScope
06/04/2025CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/25/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/23/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
11/21/2025Fire-Resistant Penetrations and JointsEric Sunspecial
11/20/2025Fire-Resistant Penetrations and JointsEric Sunspecial
07/18/2025Fire-Resistant Penetrations and JointsEric Sunspecial
07/03/2025Fire-Resistant Penetrations and JointsEric Sunspecial
06/06/2025Fire-Resistant Penetrations and JointsEric Sunspecial
06/06/2025Energy Code Compliance InspectionsEric Sunprogress
06/06/2025FinalEric Sunprogress
06/06/2025Fire-Resistance Rated ConstructionEric Sunprogress
06/06/2025Interior lighting powerEric Sunenergy_progress
06/06/2025Insulation placement and R valuesEric Sunenergy_progress
05/22/2025FinalEric Sunprogress
05/22/2025Fire-Resistance Rated ConstructionEric Sunprogress
05/22/2025Insulation placement and R valuesEric Sunenergy_progress
05/22/2025Interior lighting powerEric Sunenergy_progress
05/22/2025Fire-Resistant Penetrations and JointsEric Sunspecial
05/22/2025Energy Code Compliance InspectionsEric Sunprogress
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/19/2026S01208402-S1Request digital key ↗
08/19/2026S01208402-I1Request digital key ↗
08/19/2026S01208402-P4Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/19/2026S01208402-I1Open ↗
08/19/2026S01208402-P3Open ↗
08/19/2026S01208402-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026S01208402-P3Open ↗
08/26/2026S01208402-P2Open ↗
08/25/2026S01208402-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/25/2026S01208402-I1Open ↗
08/25/2026S01208402-I1Open ↗
08/25/2026S01208402-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/19/2026S01208402-I1Open ↗
08/19/2026S01208402-S1Open ↗
08/19/2026S01208402-P3Open ↗
Showing 3 of 6 on file for this type