← Back
BuildNYC
Over six families without stores
1180 LEBANON STREET
BRONX · BIN 2042479
💬 Discuss this project
1928Year Built
5Stories
C1Building Class
M1-1Zoning
36,852 sfGross Floor Area
56Units
LL97 CoveredRent Stabilized55 Active Violations 51 unresolved · 4 paperwork only ▸
Over six families without stores · Owner of record: 1180 SF Holdings · 12,202 sf lot · 3.02 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Installation of heavy duty sidewalk shed4p · 1 filing · 2 docs
Sub-Basement21p · 1 filing · 20 docs
Site & exteriorStucco and masonry repairs and reconstruction7p · 2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Citiapts1107/08/2026
1180 Realty603/21/2026
1180 SF Holdings103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JLN Associates105/22/2024
Arquitectura Varela101/31/2023
Enthink Engineers101/18/2023
New York & Company503/22/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
New York & Company1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Reliable EnterprisesScaffold807/08/2026
Bauer MechancialPlumbing507/08/2026
Facade Res GroupGeneral Contractor303/21/2026
Alan E RosenbergPlumbing103/21/2026
Windsor EnergyGeneral Contractor109/06/2019
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA Building & Inspection1519101/31/2023
Butterfield & O'Connor4189101/31/2023
New York Engineering Associates851503/22/2021
Building Lifecycle
09/03/2026
Signed off — Alteration
X00814506-I1
07/14/2026
Failure to maintain building in code compliant manner. Observed the following defected conditions. Exposure 1: cracks, damaged joints & deflated…
DOB violation · open
07/14/2026
Failure to provide unobstructed exit passageway. Note:-at the time of inspection view items stored at fire escape landing at exposure #1…
ECB violation · closed
06/30/2026
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR…
HPD violation · closed
04/13/2026
Boiler inspection report filed
Initial · no defects · Accepted
252 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offReliable Enterprises10/03/2025
DOB NOWSidewalk ShedSigned-offReliable Enterprises10/30/2024
DOB NOWGeneral ConstructionSigned-offFacade Res Group07/11/2024
DOB NOWSidewalk ShedSigned-offReliable Enterprises11/28/2023
DOB NOWSidewalk ShedSigned-offReliable Enterprises01/18/2023
DOB NOWPlumbingSigned-offMidwood-Raftery Plumbing & Heating04/15/2021
DOB NOWBoiler EquipmentSigned-offMidwood-Raftery Plumbing & Heating03/23/2021
DOB NOWBoiler EquipmentSigned-offMidwood-Raftery Plumbing & Heating03/22/2021
DOB NOWBoiler EquipmentSigned-offMidwood-Raftery Plumbing & Heating03/16/2020
DOB NOWPlumbingSigned-offMidwood-Raftery Plumbing & Heating02/24/2020
BISOTISSUEDWindsor Energy09/06/2019
BISFSISSUEDG. Bauer03/04/2013
BISPLISSUEDAlan E. Rosenberg03/04/2013
BISFBISSUEDMarlande Heating11/14/1997
1 project · most recent 01/20/2023
FiledStatusContractorScope
01/20/2023CompleteRichard Neu—
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
04/23/2024FinalJAMES NAPOLIprogress
01/26/2023Structural Stability – Alterations of existing buildingsBRIAN T. O'CONNORspecial
01/26/2023MasonryBRIAN T. O'CONNORspecial
01/26/2023FinalVicente Varelaprogress
01/26/2023Tenant Protection Plan ComplianceYounes Abouyaalaspecial
03/25/2021HVAC and service water heating system controls LOUIS ARENAenergy_progress
03/25/2021Energy Code Compliance InspectionsLOUIS ARENAprogress
03/25/2021Heating SystemsLOUIS ARENAspecial
03/25/2021Maintenance informationLOUIS ARENAenergy_progress
03/25/2021Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
03/25/2021HVAC and service water heating equipment LOUIS ARENAenergy_progress
03/12/2021HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
03/12/2021Energy Code Compliance InspectionsLOUIS ARENAprogress
03/12/2021Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
03/11/2021HVAC and service water heating equipment LOUIS ARENAenergy_progress
03/11/2021Maintenance informationLOUIS ARENAenergy_progress
03/11/2021HVAC and service water heating system controls LOUIS ARENAenergy_progress
03/11/2021Heating SystemsLOUIS ARENAspecial
03/10/2021Heating SystemsLOUIS ARENAspecial
03/10/2021Maintenance informationLOUIS ARENAenergy_progress
03/10/2021HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
91 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account