BuildNYC
Public elementary, junior or senior high
X198
1180 TINTON AVENUE · BIN 2004869
💬 Discuss this project
1974Year Built
4Stories
W1Building Class
R6Zoning
146,590 sfGross Floor Area
1Units
LL97 Covered7 Active Violations 1 unresolved · 6 paperwork only 2 likely answered ▸
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 107,800 sf lot · 1.36 FAR built · Flood zone X
Locations of Work
StructuralMechanicalEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofAutism Charter School4p · 1 filing · 17 docs
Floor 4Autism Charter School4p · 1 filing · 17 docs
Floor 3
Floor 2
Floor 1
Site & exteriorP.S. 212XUnder Construction25p · 4 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority10507/08/2026
NYC Autism Charter Schools507/08/2026
NYC Department of Education303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Valentino Pompeo Architect309/25/2023
Dseny Engineering Services406/21/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Dseny Engineering Services803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Roma ScaffoldingScaffold1107/08/2026
KG Construction ServicesGeneral Contractor807/08/2026
KG Construction ServicesScaffold607/08/2026
Roma Scaffoldingspecialty_contractor303/21/2026
Approved Electric Cont'gElectrical103/21/2026
Lodaya RajivElectrical103/21/2026
Falcon Electrical ContractingElectrical103/21/2026
Anco Electl ContctngElectrical103/22/2026
Ryan JosephElectrical103/21/2026
ExlGeneral Contractor107/08/2026
Ark Systems ElectricElectrical103/21/2026
E.N.E.L. ElectricalElectrical103/21/2026
Prince ElectricElectrical103/21/2026
Charan Electrical Enterp'sElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C.M. Testing Laboratory1352209/25/2023
Twin Peaks317206/21/2021
Building Lifecycle
All (117)Filed (7)Permit Issued (16)Signed Off (4)Violation (60)Objection (8)Special Inspection (22)
07/09/2026
Violation issued (ECB, open)
Construction
07/09/2026
Violation issued (ECB, open)
Construction
07/09/2026
Violation issued (ECB, open)
Construction
07/09/2026
Violation issued (ECB, open)
Construction
03/17/2026
Permit issued — Support of Excavation
X00538755-I1-SE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/09/2025
Violation issued (ECB, open)
Construction
09/09/2025
Violation issued (ECB, open)
Construction
08/04/2025
Signed off — Alteration
X00503453-I1
05/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/22/2024
Permit issued — Support of Excavation
X00538755-I1-SE
11/06/2023
Signed off — Alteration
APPLICATION FILED FOR THE INSTALLATION OF NEW SPLIT UNIT HEAT PUMPS AT EXISTING SCHOOL. ALL WORK IS AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, BULK, OCCUPANCY OR EGRESS.
X08037377-I1
09/26/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN SEMIOLI
09/26/2023
Special inspection requirement — HVAC-R and service water heating system controls
JOHN SEMIOLI
09/26/2023
Special inspection requirement — Mechanical Systems
JOHN SEMIOLI
09/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN SEMIOLI
09/26/2023
Special inspection requirement — Final
JOHN SEMIOLI
09/26/2023
Special inspection requirement — Maintenance information
JOHN SEMIOLI
09/26/2023
Special inspection requirement — HVAC-R and service water heating equipment
JOHN SEMIOLI
09/25/2023
Filed — Alteration
APPLICATION FILED FOR THE INSTALLATION OF NEW SPLIT UNIT HEAT PUMPS AT EXISTING SCHOOL. ALL WORK IS AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, BULK, OCCUPANCY OR EGRESS.
X08037377-P2
09/20/2023
Special inspection requirement — Final
JOHN SEMIOLI
09/20/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN SEMIOLI
09/20/2023
Special inspection requirement — HVAC-R and service water heating system controls
JOHN SEMIOLI
09/20/2023
Special inspection requirement — HVAC-R and service water heating equipment
JOHN SEMIOLI
09/20/2023
Special inspection requirement — Maintenance information
JOHN SEMIOLI
09/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN SEMIOLI
09/20/2023
Special inspection requirement — Mechanical Systems
JOHN SEMIOLI
08/29/2023
Signed off — Alteration
SF/PS212X - FOR TEMPORARY CONSTRUCTION EQUIPMENT(SCAFFOLD) SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH DOB NUMBER 201202812 NO CHANGE IN USE, OCCUPANCY OR EGRESS
X00503480-I1
08/29/2023
Signed off — Alteration
SH/PS212X - FOR TEMPORARY CONSTRUCTION EQUIPMENT(SHED) SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH DOB NUMBER 201202812 NO CHANGE IN USE, OCCUPANCY OR EGRESS
X00503468-I1
08/15/2023
Permit issued — Mechanical Systems
X08037377-I1-MS
08/04/2023
Permit issued — Construction Fence
X00503453-I1-FN
07/07/2023
Permit issued — Sidewalk Shed
X00503468-I1-SH
06/13/2023
Permit issued — Supported Scaffold
X00503480-I1-SF
02/21/2023
Permit issued — Support of Excavation
X00538755-I1-SE
01/23/2023
Filed — Alteration
APPLICATION FILED FOR THE INSTALLATION OF NEW SPLIT UNIT HEAT PUMPS AT EXISTING SCHOOL. ALL WORK IS AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, BULK, OCCUPANCY OR EGRESS.
X08037377-P1
01/20/2023
Special inspection requirement — HVAC-R and service water heating equipment
01/20/2023
Special inspection requirement — Mechanical Systems
01/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/20/2023
Special inspection requirement — Final
01/20/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
01/20/2023
Special inspection requirement — Maintenance information
01/20/2023
Special inspection requirement — HVAC-R and service water heating system controls
11/28/2022
Objection raised — Other
11/28/2022
Objection resolved — Addressed
11/28/2022
Objection raised — Other
11/28/2022
Objection resolved — Addressed
11/21/2022
Filed — Alteration
APPLICATION FILED FOR THE INSTALLATION OF NEW SPLIT UNIT HEAT PUMPS AT EXISTING SCHOOL. ALL WORK IS AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, BULK, OCCUPANCY OR EGRESS.
X08037377-I1
08/17/2022
Permit issued — Support of Excavation
X00538755-I1-SE
08/15/2022
Permit issued — Construction Fence
X00503453-I1-FN
06/29/2022
Permit issued — Supported Scaffold
X00503480-I1-SF
03/04/2022
Violation issued (ECB, closed)
Construction
03/04/2022
Violation issued (ECB, closed)
Construction
08/18/2021
Permit issued — Support of Excavation
X00538755-I1-SE
08/18/2021
Permit issued — Construction Fence
X00503453-I1-FN
07/27/2021
Permit issued — Support of Excavation
X00538755-I1-SE
07/20/2021
Permit issued — Supported Scaffold
X00503480-I1-SF
07/08/2021
Permit issued — Sidewalk Shed
X00503468-I1-SH
07/08/2021
Permit issued — Construction Fence
X00503453-I1-FN
06/28/2021
Objection raised — Other
Latest 60 of 117 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupport of ExcavationPermit IssuedStalco03/17/2026
DOB NOWSupport of ExcavationPermit IssuedStalco02/22/2024
DOB NOWMechanical SystemsSigned-offExl08/15/2023
DOB NOWConstruction FenceSigned-offStalco08/04/2023
DOB NOWSidewalk ShedSigned-offRoma Scaffolding07/07/2023
DOB NOWSupported ScaffoldSigned-offRoma Scaffolding06/13/2023
DOB NOWSupport of ExcavationPermit IssuedStalco02/21/2023
DOB NOWSupport of ExcavationPermit IssuedStalco08/17/2022
DOB NOWConstruction FenceSigned-offStalco08/15/2022
DOB NOWSupported ScaffoldSigned-offRoma Scaffolding06/29/2022
DOB NOWSupport of ExcavationPermit IssuedStalco08/18/2021
DOB NOWConstruction FenceSigned-offStalco08/18/2021
DOB NOWSupport of ExcavationPermit IssuedStalco07/27/2021
DOB NOWSupported ScaffoldSigned-offRoma Scaffolding07/20/2021
DOB NOWSidewalk ShedSigned-offRoma Scaffolding07/08/2021
DOB NOWConstruction FenceSigned-offStalco07/08/2021
BISOTISSUEDKG Construction Services03/16/2026
BISPLISSUEDForsythe P&H03/03/2025
BISOTISSUEDKG Construction Services03/03/2025
BISOTISSUEDKG Construction Services03/03/2025
BISMHISSUEDKG Construction Services03/03/2025
BISOTISSUEDKG Construction Services03/03/2025
BISOTISSUEDKG Construction Services03/05/2024
BISOTISSUEDKG Construction Services03/05/2024
BISMHISSUEDKG Construction Services03/05/2024
BISOTISSUEDKG Construction Services03/05/2024
BISPLISSUEDForsythe P&H07/26/2023
BISOTISSUEDKG Construction Services02/23/2023
BISOTISSUEDKG Construction Services02/23/2023
BISOTISSUEDKG Construction Services02/23/2023
BISMHISSUEDKG Construction Services02/23/2023
BISPLISSUEDForsythe P&H07/26/2022
BISOTISSUEDKG Construction Services02/23/2022
BISMHISSUEDKG Construction Services02/23/2022
BISOTISSUEDKG Construction Services02/23/2022
BISOTISSUEDKG Construction Services02/23/2022
BISPLISSUEDForsythe P&H07/28/2021
BISOTISSUEDKG Construction Services07/28/2021
BISMHISSUEDKG Construction Services07/28/2021
BISOTISSUEDKG Construction Services07/28/2021
+ 26 more permits on file
13 projects · most recent 01/07/2025
General Wiring
FiledStatusContractorScope
01/07/2025CompleteAnco Electl Contctng—
09/13/2024CompleteAnco Electl ContctngGeneral Wiring
07/01/2024CompleteAnco Electl Contctng—
06/25/2024CompleteJamcob ElectricGeneral Wiring
05/21/2024CompleteRodel Electrical ContractorsGeneral Wiring
08/18/2021CompleteCharan Electrical Enterp's—
06/29/2021CompleteStanco System Electrical Cont—
09/28/2020CompleteG & F.a.st ElectricGeneral Wiring
11/25/2019CompleteEverest ElectricGeneral Wiring
06/13/2019CompletePrince Electric—
03/28/2019CompleteCharan Electrical Enterp'sGeneral Wiring
07/09/2018CompleteLaser Electrical Constr'gGeneral Wiring
01/16/2018CompleteCharan Electrical Enterp's—
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
09/26/2023HVAC-R and service water piping design and insulationJOHN SEMIOLIenergy_progress
09/26/2023HVAC-R and service water heating system controlsJOHN SEMIOLIenergy_progress
09/26/2023Mechanical SystemsJOHN SEMIOLIspecial
09/26/2023Fire-Resistant Penetrations and JointsJOHN SEMIOLIspecial
09/26/2023FinalJOHN SEMIOLIprogress
09/26/2023Maintenance informationJOHN SEMIOLIenergy_progress
09/26/2023HVAC-R and service water heating equipmentJOHN SEMIOLIenergy_progress
09/20/2023FinalJOHN SEMIOLIprogress
09/20/2023HVAC-R and service water piping design and insulationJOHN SEMIOLIenergy_progress
09/20/2023HVAC-R and service water heating system controlsJOHN SEMIOLIenergy_progress
09/20/2023HVAC-R and service water heating equipmentJOHN SEMIOLIenergy_progress
09/20/2023Maintenance informationJOHN SEMIOLIenergy_progress
09/20/2023Fire-Resistant Penetrations and JointsJOHN SEMIOLIspecial
09/20/2023Mechanical SystemsJOHN SEMIOLIspecial
01/20/2023HVAC-R and service water heating equipment—energy_progress
01/20/2023Mechanical Systems—special
01/20/2023Fire-Resistant Penetrations and Joints—special
01/20/2023Final—progress
01/20/2023HVAC-R and service water piping design and insulation—energy_progress
01/20/2023Maintenance information—energy_progress
01/20/2023HVAC-R and service water heating system controls—energy_progress
04/14/2021Post-installed AnchorsMIKHAIL ZEYGMANspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Autism Charter SchoolEducationFloor 4, Roof
Project X08037377 Alteration · LOC Issued · 11/21/2022
P.S. 212XEducation—
Project X00503468 Alteration · LOC Issued · 06/21/2021
Project X00503480 Alteration · LOC Issued · 06/21/2021
Project X00503453 Alteration · LOC Issued · 06/18/2021
Project X00538755 Alteration · Permit Entire · 06/14/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 85 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/25/2026X00538755-I1Request digital key ↗
08/25/2026X00503453-I1Request digital key ↗
08/23/2026X08037377-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits9
▸BISWORK PERMIT APPLICATION6
01/10/2018220546675Open ↗
04/13/2017220546675Open ↗
01/13/2017220546675Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
08/19/2016220546675Open ↗
08/19/2016220546684Open ↗
08/19/2016220546675Open ↗
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature10
09/02/2026X08037377-P2Open ↗
09/02/2026X08037377-P2Open ↗
09/02/2026X08037377-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/25/2026X00538755-I1Open ↗
08/25/2026X00503480-I1Open ↗
08/25/2026X00503468-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026X00503480-I1Open ↗
09/02/2026X08037377-P2Open ↗
09/02/2026X08037377-P2Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
06/27/2018220546675Open ↗
12/15/2016220546675Open ↗
08/19/2016220546675Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
08/19/2016220546675Open ↗
08/19/2016220546675Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/19/2016220546675Open ↗
▸Trade Schedules & Equipment2
▸BISFA - FDNY APPROVAL : FD-FAA1
05/14/2018220546684Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
08/19/2016220546675Open ↗
▸Safety & Tenant Protection3
▸DOB NOWNYCSCA - Approved Site Safety Plans3
08/13/2026X00503468-I1Open ↗
08/13/2026X00503480-I1Open ↗
08/13/2026X00503453-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/23/2026X08037377-P2Open ↗
08/23/2026X08037377-P1Open ↗
08/15/2026X08037377-I1Open ↗
▸BISDEP FORM V5 - ASBESTOS VARIANCE2
07/02/2019220546684Open ↗
07/02/2019220546675Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
12/15/2016220546675Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
12/19/2016220546675Open ↗
08/19/2016220546675Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/27/2018220546675Open ↗
▸Approvals, Objections & Sign-offs12
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/25/2026X00538755-I1Open ↗
08/13/2026X00503468-I1Open ↗
08/13/2026X00503480-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)4
08/13/2026X00538755-I1Open ↗
08/13/2026X00503480-I1Open ↗
08/13/2026X00503468-I1Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
07/02/2019220546684Open ↗
07/02/2019220546675Open ↗
06/27/2018220546675Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026X00503453-I1Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
07/02/2019220546684Open ↗
07/02/2019220546675Open ↗
08/19/2016220546675Open ↗
▸Filing & Intake Forms6
▸BISBOROUGH INTAKE FORM3
07/02/2019220546684Open ↗
07/02/2019220546675Open ↗
06/27/2018220546675Open ↗
▸BISEFILING COVER SHEET3
08/19/2016220546675Open ↗
08/19/2016220546684Open ↗
08/19/2016220546675Open ↗
▸Other Documents6
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal4
08/13/2026X00503480-I1Open ↗
08/13/2026X00503468-I1Open ↗
08/13/2026X00538755-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026X00538755-I1Open ↗
▸DOB NOWNYCSCA Exhibit 21
08/13/2026X00503453-I1Open ↗