← Back
BuildNYC
Over six families without stores
1181 NEW YORK AVENUE
BROOKLYN · BIN 3428623
💬 Discuss this project
2022Year Built
4.5Stories
C1Building Class
R6Zoning
5,975 sfGross Floor Area
9Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Over six families without stores · Owner of record: 1183 New York Ave BSD · 2,000 sf lot · 2.99 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofHeavy duty sidewalk shed16p · 3 filings · 14 docs
PenthouseMechanical systems installation13p · 3 filings · 20 docs
Floor 4Mechanical systems installation26p · 5 filings · 20 docs
Floor 3Mechanical systems installation26p · 5 filings · 20 docs
Floor 2Mechanical systems installation26p · 5 filings · 20 docs
Floor 1Mechanical systems installation26p · 5 filings · 20 docs
CellarMechanical systems installation22p · 4 filings · 20 docs
Site & exteriorHeavy duty sidewalk shed9p · 3 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1183 New York Ave BSD607/08/2026
1183 New York603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Asher Architect402/15/2023
Eyal Levitt Architect212/28/2022
Paul Perdek, Professional Engineering408/10/2022
R & S Associates111/11/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Eretz Builders Assistance1003/21/2026
AE Design Solution803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Core Scaffold SystemsScaffold507/08/2026
Hershkowitz AsherElectrical103/21/2026
Green Star ElectlElectrical103/21/2026
Cityscape BuildersGeneral Contractor107/08/2026
Cityscape Buildersspecialty_contractor107/08/2026
B&B Mechanical Plumbing & HeatingPlumbing107/08/2026
Asher HershkowitzElectrical103/21/2026
Target Piping NYFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Big Apple Group NY A Rma9168502/15/2023
Metro Fire Control4538212/28/2022
Building Lifecycle
04/03/2023
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
02/22/2023
Signed off — Alteration
INSTALLATION OF MECHANICAL SYSTEMS ASSOCIATED DUCTS AND PIPING PER PLAN IN NEW 9 FAMILY RESIDENCE
B00260190-I1
02/21/2023
Special inspection requirement — Maintenance information
Soorjbally Harilall
02/21/2023
Special inspection requirement — HVAC and service water heating system controls
Soorjbally Harilall
02/21/2023
Special inspection requirement — Shutoff dampers
Soorjbally Harilall
56 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offCityscape Builders09/21/2022
DOB NOWMechanical SystemsSigned-offCityscape Builders09/20/2022
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems05/27/2022
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems05/27/2022
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems05/24/2022
DOB NOWSprinklersSigned-offTarget Piping NY04/28/2022
DOB NOWPlumbingSigned-offTarget Piping NY04/27/2022
BIS—ISSUEDCityscape Builders11/10/2022
BIS—ISSUEDCityscape Builders12/14/2021
BIS—ISSUEDCityscape Builders12/14/2021
3 projects · most recent 01/12/2023
General Wiring
FiledStatusContractorScope
01/12/2023CompleteGreen Star ElectlGeneral Wiring
08/02/2022CompleteGreen Star Electl—
05/31/2022CompleteV. Vass Electric—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
01/12/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/09/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/09/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/09/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/12/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
02/21/2023Maintenance informationSoorjbally Harilallenergy_progress
02/21/2023HVAC and service water heating system controls Soorjbally Harilallenergy_progress
02/21/2023Shutoff dampersSoorjbally Harilallenergy_progress
02/21/2023HVAC insulation and sealing Soorjbally Harilallenergy_progress
02/21/2023Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
02/21/2023Mechanical SystemsSOORJBALLY HARILALLspecial
02/21/2023Energy Code Compliance InspectionsSoorjbally Harilallprogress
02/21/2023FinalSoorjbally Harilallprogress
02/21/2023HVAC and service water heating equipment Soorjbally Harilallenergy_progress
02/15/2023Shutoff dampersSoorjbally Harilallenergy_progress
02/15/2023HVAC and service water heating equipment Soorjbally Harilallenergy_progress
02/15/2023Maintenance informationSoorjbally Harilallenergy_progress
02/15/2023HVAC and service water heating system controls Soorjbally Harilallenergy_progress
02/15/2023HVAC insulation and sealing Soorjbally Harilallenergy_progress
02/15/2023Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
02/15/2023Mechanical SystemsSOORJBALLY HARILALLspecial
02/15/2023Energy Code Compliance InspectionsSoorjbally Harilallprogress
02/15/2023FinalSoorjbally Harilallprogress
09/30/2022Maintenance informationSoorjbally Harilallenergy_progress
09/30/2022HVAC and service water heating equipment Soorjbally Harilallenergy_progress
09/30/2022HVAC and service water heating system controls Soorjbally Harilallenergy_progress
09/30/2022Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
91 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account