← Back
BuildNYC
Two family frame
1182 JEFFERSON AVENUE
BROOKLYN · BIN 3077887
💬 Discuss this project
1910Year Built
2Stories
B2Building Class
R6Zoning
2,430 sfGross Floor Area
2Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Two family frame · Owner of record: Townhouse Rental · 1,800 sf lot · 1.35 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 28p · 2 filings · 20 docs
Floor 19p · 2 filings · 20 docs
Basement1p · 1 filing · 9 docs
Sub-Basement8p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Park Slope Associates103/22/2026
Townhouse Rental103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/25/2022$1.9M—JEFFERSON AVE 26 LLC → TOWNHOUSE RENTAL II, L.L.C.$798/sf building
06/29/2021$892K—1182 JEFFERSON AVENUE LLC → JEFFERSON AVE 26 LLC$367/sf building
04/27/2017$340K—Private party → 1182 JEFFERSON AVENUE LLC$140/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LWL Associates505/23/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Prime Zone Building Consulting503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Morell BuildersGeneral Contractor407/08/2026
Royal Electrical ContractingElectrical103/22/2026
Superior Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL Engineering6781305/23/2022
Building Lifecycle
02/11/2026
§ 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES NO VOLUME IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st…
HPD violation · closed
02/11/2026
§ 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES NO VOLUME ( CAUSE UNKNOWN) IN THE ENTIRE APARTMENT LOCATED AT APT 2,…
HPD violation · closed
08/12/2023
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 20 SQ FT AT CEILING IN THE 5th ROOM FROM NORTH LOCATED…
HPD violation · closed
08/12/2023
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 15 SQ FT AT CEILING IN THE 2nd BATHROOM FROM NORTH…
HPD violation · closed
08/12/2023
§ 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK FROM CEILING IN THE 5th ROOM FROM NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT…
HPD violation · closed
59 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMorell Builders05/09/2022
DOB NOWPlumbingSigned-offSuperior Plumbing & Heating10/20/2021
DOB NOWGeneral ConstructionSigned-offMorell Builders08/20/2021
1 project · most recent 06/15/2022
General Wiring
FiledStatusContractorScope
06/15/2022CompleteRoyal Electrical ContractingGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
06/15/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/08/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/02/2022Pass-Final General Construction Non-Directive 14PassView ↗
05/25/2022Fail-Final General Construction Non-Directive 14FailView ↗
11/24/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/24/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/24/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
05/23/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
05/23/2022Energy Code Compliance InspectionsCHI WAI CHUNGprogress
05/23/2022Air barrier — testing CHI WAI CHUNGenergy_progress
05/23/2022Interior lighting powerCHI WAI CHUNGenergy_progress
05/23/2022HVAC-R and service water piping design and insulationCHI WAI CHUNGenergy_progress
05/23/2022Air barrier - visual inspectionCHI WAI CHUNGenergy_progress
05/23/2022Fenestration and door U-factor and product ratingsCHI WAI CHUNGenergy_progress
05/23/2022Fenestration areasCHI WAI CHUNGenergy_progress
05/23/2022Fenestration air leakageCHI WAI CHUNGenergy_progress
05/23/2022Fenestration areasCHI WAI CHUNGenergy_progress
05/23/2022Air barrier — testing CHI WAI CHUNGenergy_progress
05/23/2022Interior lighting powerCHI WAI CHUNGenergy_progress
05/23/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
05/23/2022Fenestration air leakageCHI WAI CHUNGenergy_progress
05/23/2022HVAC-R and service water piping design and insulationCHI WAI CHUNGenergy_progress
05/23/2022Air barrier - visual inspectionCHI WAI CHUNGenergy_progress
05/23/2022Fenestration and door U-factor and product ratingsCHI WAI CHUNGenergy_progress
05/23/2022Energy Code Compliance InspectionsCHI WAI CHUNGprogress
11/16/2021HVAC-R and service water piping design and insulationCHI WAI CHUNGenergy_progress
11/16/2021Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
11/16/2021Fenestration air leakageCHI WAI CHUNGenergy_progress
11/16/2021Fenestration and door U-factor and product ratingsCHI WAI CHUNGenergy_progress
11/16/2021Air barrier — testing CHI WAI CHUNGenergy_progress
11/16/2021Energy Code Compliance InspectionsCHI WAI CHUNGprogress
11/16/2021Air barrier - visual inspectionCHI WAI CHUNGenergy_progress
Latest 25 of 31.
28 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account