DOB12/17/2025N1-STRUCTURAL STABILITY REQUESTED FOR BUILDING AT EXPO 1 PARAPET FA ADE MULTIPLE CRACKS, EXPO 2&3 RUNNING CRACK 2ND TO 4TH FLOOR POTENTIAL TO COLLAPSE.
ECB12/17/2025FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED AT EXPOSURE 1(FRONT) PARAPET CRACKS AT FACADE, EXPO 2(LEFT) RUNNING CRACK FLOORS BETWEEN 2ND &4TH, EXPO 3(BACK) RUNNING CRAC$2K due
HPD09/07/2024§ 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES AIR CONDITIONER UNIT PROTRUDING BEYOND 6 INCHES AT WINDOW SILL 3RD STORY BALCONY BUILDING FRONT AT FIRE ESCAPE
HPD09/07/2024§ 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES AIR CONDITIONER UNIT PROTRUDING BEYOND 6 INCHES AT WINDOW SILL 4TH STORY BALCONY BUILDING FRONT AT FIRE ESCAPE
HPD06/05/2019§ 27-2043 ADM CODE PROVIDE A LOCK AND KEY TO THE ENTRANCE DOOR OF DWELLING UNIT AND, IF A CL A MULTIPLE DWELLING, ALSO CHAIN DOOR GUARD IN THE ENTRANCE LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
DOB04/14/2000V-DOB VIOLATION - ACTIVE
DOB04/14/2000V-DOB VIOLATION - ACTIVE
DOB04/13/2000V-DOB VIOLATION - ACTIVE
DOB08/16/1993V-DOB VIOLATION - ACTIVE