← Back
BuildNYC
Elevator apt, semi-fireproof without stores
Highbridge Apartments
1182 WOODYCREST AVENUE · BIN 2003157
💬 Discuss this project
2020Year Built
9Stories
D1Building Class
R7-1Zoning
41,215 sfGross Floor Area
45Units
LL97 CoveredRent Stabilized1 Active Violation ▸
Elevator apt, semi-fireproof without stores · Owner of record: HP Woodycrest Housing Development Fund C Ompany · 7,375 sf lot · 5.59 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsHp Woodycrest Housing Development F2 filings
RoofEz Scale and 2-Point Platform Assembly2p · 2 filings · 5 docs
Floor 44th floor wall structural repair2p · 1 filing · 5 docs
Floor 3
Floor 2
Floor 1Hp Woodycrest Housing Development F4 filings · 11 docs
Site & exteriorEz Scale and 2-Point Platform Assembly6 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1182 Woodycrest5303/21/2026
HP Woodycrest Housing Development Fund C Ompany1207/08/2026
Woodycrest Apartments203/21/2026
HP Woodycrest HDFC203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/06/2018$1.6M—1182 WOODYCREST LLC → HP WOODYCREST HOUSING DEVELOPMENT FUND COMPANY INC— not available
03/10/2017$1.6M—Private party → 1182 WOODYCREST LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Patuxent Engineering1203/21/2026
Crown Design Consulting1003/21/2026
KD Designs203/21/2026
Rigid Structural Design103/21/2026
Eurocelt Expediting403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DHS FracoScaffold1907/08/2026
Republic Scaffold & HoistScaffold1407/08/2026
DDS Mechanical FPSFire Protection607/08/2026
Vaya Restorationspecialty_contractor603/21/2026
Republic Exterior ServiceScaffold607/08/2026
Vaya RestorationScaffold607/08/2026
Banta HomesGeneral Contractor207/08/2026
RJ Russo Electric CoElectrical203/22/2026
Chris SiderisElectrical103/21/2026
Man Power ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Domani Inspection Service843712/20/2021
Building Lifecycle
05/18/2026
Elevator Category 1 inspection report filed
05/08/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
02/25/2026
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD violation · closed
02/04/2026
Signed off — Alteration
Herein filing Temporary Dry Standpipe Alteration Type 2 subsequent to new 9-story residential apartment building.
X00347249-I1
11/17/2025
Signed off — Alteration
X00645873-I1
154 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offVaya Restoration07/17/2025
DOB NOWCurb CutPermit IssuedBanta Homes04/21/2025
DOB NOWSuspended ScaffoldSigned-offVaya Restoration08/15/2024
DOB NOWGeneral ConstructionSigned-offVaya Restoration07/24/2024
DOB NOWSidewalk ShedSigned-offRepublic Exterior Service07/16/2024
DOB NOWSidewalk ShedSigned-offDHS Fraco06/06/2024
DOB NOWProtection and Mechanical MethodsSigned-offDHS Fraco06/06/2024
DOB NOWSupported ScaffoldSigned-offDHS Fraco06/06/2024
DOB NOWSupported ScaffoldSigned-offVaya Restoration05/31/2024
DOB NOWStandpipeSigned-offDDS Mechanical FPS04/03/2024
DOB NOWGeneral ConstructionSigned-offVaya Restoration07/20/2023
DOB NOWSidewalk ShedSigned-offRepublic Exterior Service07/19/2023
DOB NOWProtection and Mechanical MethodsSigned-offDHS Fraco07/11/2023
DOB NOWSidewalk ShedSigned-offRepublic Exterior Service06/15/2023
DOB NOWSidewalk ShedSigned-offDHS Fraco06/07/2023
DOB NOWProtection and Mechanical MethodsSigned-offDHS Fraco06/07/2023
DOB NOWSupported ScaffoldSigned-offDHS Fraco06/07/2023
DOB NOWStandpipeSigned-offDDS Mechanical FPS04/19/2023
DOB NOWSupported ScaffoldSigned-offDHS Fraco03/16/2023
DOB NOWSidewalk ShedSigned-offDHS Fraco02/08/2023
DOB NOWStructuralSigned-offBanta Homes10/21/2022
DOB NOWSidewalk ShedSigned-offRepublic Exterior Service06/09/2022
DOB NOWProtection and Mechanical MethodsSigned-offDHS Fraco06/02/2022
DOB NOWSidewalk ShedSigned-offRepublic Scaffold & Hoist04/28/2022
DOB NOWStandpipeSigned-offDDS Mechanical FPS04/28/2022
DOB NOWSidewalk ShedSigned-offRepublic Scaffold & Hoist03/30/2022
DOB NOWSupported ScaffoldSigned-offDHS Fraco03/14/2022
DOB NOWSidewalk ShedSigned-offRepublic Scaffold & Hoist03/09/2022
DOB NOWSidewalk ShedSigned-offDHS Fraco03/09/2022
DOB NOWSupported ScaffoldSigned-offVaya Restoration01/08/2022
DOB NOWProtection and Mechanical MethodsSigned-offDHS Fraco05/18/2021
DOB NOWStandpipeSigned-offDDS Mechanical FPS05/07/2021
DOB NOWSupported ScaffoldSigned-offDHS Fraco11/24/2020
DOB NOWStandpipeSigned-offDDS Mechanical FPS11/04/2020
DOB NOWStandpipeSigned-offDDS Mechanical FPS08/07/2020
DOB NOWSidewalk ShedSigned-offDHS Fraco05/07/2020
DOB NOWSupported ScaffoldSigned-offRepublic Scaffold & Hoist04/02/2020
DOB NOWSidewalk ShedSigned-offRepublic Scaffold & Hoist12/17/2019
DOB NOWSidewalk ShedSigned-offRepublic Scaffold & Hoist06/07/2019
DOB NOWSupported ScaffoldSigned-offRepublic Scaffold & Hoist01/04/2019
+ 51 more permits on file
8 projects · most recent 06/13/2025
General Wiring
FiledStatusContractorScope
06/13/2025CompleteMan Power Electric—
03/10/2025CompleteRJ Russo Electric Co—
01/09/2025CompleteMan Power ElectricGeneral Wiring
11/30/2020CompleteNash Electric Services—
10/27/2020CompleteNewbridge Electl Contng—
06/09/2020CompleteMan Power Electric—
05/08/2020CompleteNash Electric Services—
12/04/2018CompleteNash Electric Services—
1 project · most recent 12/05/2018
Sidewalk Shed
FiledStatusContractorScope
12/05/2018Signed-offRepublic Scaffold & HoistSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
12/10/2021Structural Steel - WeldingJOHN MCMONAGLEspecial
12/10/2021MasonryJOHN MCMONAGLEspecial
12/10/2021Structural Stability – Alterations of existing buildingsJOHN MCMONAGLEspecial
12/10/2021Structural Steel - High Strength BoltingJOHN MCMONAGLEspecial
12/10/2021Post-installed AnchorsJOHN MCMONAGLEspecial
12/10/2021FinalJOHN MCMONAGLEprogress
12/10/2021Structural Steel - DetailsJOHN MCMONAGLEspecial
06/09/2021Concrete - Cast-In-PlaceJOHN MCMONAGLEspecial
06/09/2021Structural Steel - High Strength BoltingJOHN MCMONAGLEspecial
06/09/2021Structural Steel - WeldingJOHN MCMONAGLEspecial
05/27/2021Structural Steel - High Strength BoltingJOHN MCMONAGLEspecial
05/27/2021Concrete - Cast-In-PlaceJOHN MCMONAGLEspecial
05/27/2021Structural Steel - WeldingJOHN MCMONAGLEspecial
09/11/2020Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
09/11/2020Standpipe SystemsJOHN MCMONAGLEspecial
08/05/2020Fire-Resistant Penetrations and JointsSTEPHEN WOODCHEKEspecial
08/05/2020Standpipe SystemsSTEPHEN WOODCHEKEspecial
06/06/2019FinalJOHN O'CONNOR, P.E.progress
396 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account