One story retail building
1184 FLATBUSH AVENUE
BROOKLYN · BIN 3119580
💬 Discuss this project
1933Year Built
1Stories
K1Building Class
R7AZoning
33,350 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One story retail building · Owner of record: 1188 FLATBUSH LLC · 19,792 sf lot · 1.69 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 9 docs
Floor 1Under Construction40p · 3 filings · 20 docs
Cellar35p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEXTCOM CONSTRUCTION503/22/2026
1188 FLATBUSH LLC103/22/2026
HIRESPRINT403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DESIGN GROUP IN H&K LLC1407/16/2026
ALBERT MONTOYA ARCHITECT209/09/2024
KZ ENGINEERING, P.C109/13/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DESIGN GROUP IN H K2603/21/2026
CSMR DESIGNS203/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEXTCOM CONSTRUCTION, INC.General Contractor1507/08/2026
PETER PLUMBING ASSOC. INC.Plumbing308/26/2026
CS BRIDGE CORPGeneral Contractor203/21/2026
PETER PLUMBING ASSOC. INC.Fire Protection207/08/2026
B.P. ELECTRIC CORPElectrical103/22/2026
SEOUL INTERIOR & BUILD INGeneral Contractor107/22/2026
POWER ELECTRICAL CONTS INElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DESIGN GROUP IN H&K LLC1363207/16/2026
CHONG ENGINEERING P.C.74111012/09/2025
Building Lifecycle
All (136)Filed (17)Permit Issued (16)Signed Off (6)Violation (1)Inspection (9)Objection (57)Special Inspection (30)
07/21/2026
Permit issued — Mechanical Systems
B01426458-I1-MS
07/16/2026
Filed — Alteration
INSTALLATION OF EXHAUST DUCT HODD AT DELI CORNER IN EXISTING SUPERMARKET. NO CHANGE IN USE, EGRESS, AND OCCUPAMCY UNDER THIS APPLICATION.
B01426458-I1
07/06/2026
Special inspection requirement — Mechanical Systems
SUKHWAN KIM
07/06/2026
Special inspection requirement — Final
SUKHWAN KIM
04/10/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/18/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
01/14/2026
Special inspection requirement — Fenestration areas
Tae Chong
01/14/2026
Special inspection requirement — Sprayed fire-resistant materials
Tae Chong
01/14/2026
Special inspection requirement — Fire-Resistance Rated Construction
Tae Chong
01/14/2026
Special inspection requirement — Interior lighting power
Tae Chong
01/14/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Tae Chong
01/14/2026
Special inspection requirement — Lighting controls
Tae Chong
01/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Tae Chong
01/14/2026
Special inspection requirement — Insulation placement and R values
Tae Chong
01/14/2026
Special inspection requirement — Fenestration air leakage
Tae Chong
01/14/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Tae Chong
01/14/2026
Special inspection requirement — Exterior lighting power
Tae Chong
01/14/2026
Special inspection requirement — Energy Code Compliance Inspections
Tae Chong
01/14/2026
Special inspection requirement — Air barrier - visual inspection
Tae Chong
01/14/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Tae Chong
12/10/2025
Objection raised — Scope
12/10/2025
Objection resolved — Addressed
12/09/2025
Filed — Alteration CO
INSTALLATION/MODIFICATION OF PLUMBING & SPRINKLER SYSTEM IN CONJUNCTION WITH B00839247-I1. (SUPERMARKET) THIS APPLICATION IS TO SUPERSEDE OLD BIS#310171079. FIRE ALARM FILED UNDER FDNY APPLICATION#2023-TMFALM-003251. GAS WORK IS DONE UNDER DOB#B00953823.
B00839247-P6
12/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Tae Chong
12/08/2025
Special inspection requirement — Sprayed fire-resistant materials
Tae Chong
12/08/2025
Special inspection requirement — Energy Code Compliance Inspections
Tae Chong
12/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Tae Chong
12/08/2025
Special inspection requirement — Fire-Resistance Rated Construction
Tae Chong
12/08/2025
Special inspection requirement — Insulation placement and R values
Tae Chong
12/08/2025
Special inspection requirement — Exterior lighting power
Tae Chong
12/08/2025
Special inspection requirement — Air barrier - visual inspection
Tae Chong
12/08/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Tae Chong
12/08/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Tae Chong
12/08/2025
Special inspection requirement — Fenestration areas
Tae Chong
12/08/2025
Special inspection requirement — Lighting controls
Tae Chong
12/08/2025
Special inspection requirement — Interior lighting power
Tae Chong
12/08/2025
Special inspection requirement — Fenestration air leakage
Tae Chong
08/05/2025
Signed off — Alteration CO
INSTALLATION/MODIFICATION OF PLUMBING & SPRINKLER SYSTEM IN CONJUNCTION WITH B00839247-I1. (SUPERMARKET) THIS APPLICATION IS TO SUPERSEDE OLD BIS#310171079. FIRE ALARM FILED UNDER FDNY APPLICATION#2023-TMFALM-003251. GAS WORK IS DONE UNDER DOB#B00953823.
B00839247-S1
07/29/2025
Signed off — Alteration CO
INSTALLATION/MODIFICATION OF PLUMBING & SPRINKLER SYSTEM IN CONJUNCTION WITH B00839247-I1. (SUPERMARKET) THIS APPLICATION IS TO SUPERSEDE OLD BIS#310171079. FIRE ALARM FILED UNDER FDNY APPLICATION#2023-TMFALM-003251. GAS WORK IS DONE UNDER DOB#B00953823.
B00839247-S2
05/30/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/14/2025
Objection resolved — Addressed
05/01/2025
Objection raised — Cost
04/23/2025
Objection resolved — Addressed
04/23/2025
Objection resolved — Addressed
04/23/2025
Objection resolved — Addressed
04/23/2025
Objection resolved — Addressed
04/21/2025
Objection raised — Scope
04/21/2025
Objection raised — Fire_Protection
04/21/2025
Objection raised — Fire_Protection
04/21/2025
Objection raised — Fire_Protection
04/15/2025
Filed — Alteration CO
INSTALLATION/MODIFICATION OF PLUMBING & SPRINKLER SYSTEM IN CONJUNCTION WITH B00839247-I1. (SUPERMARKET) THIS APPLICATION IS TO SUPERSEDE OLD BIS#310171079. FIRE ALARM FILED UNDER FDNY APPLICATION#2023-TMFALM-003251. GAS WORK IS DONE UNDER DOB#B00953823.
B00839247-P4
04/15/2025
Filed — Alteration CO
INSTALLATION/MODIFICATION OF PLUMBING & SPRINKLER SYSTEM IN CONJUNCTION WITH B00839247-I1. (SUPERMARKET) THIS APPLICATION IS TO SUPERSEDE OLD BIS#310171079. FIRE ALARM FILED UNDER FDNY APPLICATION#2023-TMFALM-003251. GAS WORK IS DONE UNDER DOB#B00953823.
B00839247-P5
03/20/2025
Signed off — Alteration CO
INSTALLATION/MODIFICATION OF PLUMBING & SPRINKLER SYSTEM IN CONJUNCTION WITH B00839247-I1. (SUPERMARKET) THIS APPLICATION IS TO SUPERSEDE OLD BIS#310171079. FIRE ALARM FILED UNDER FDNY APPLICATION#2023-TMFALM-003251. GAS WORK IS DONE UNDER DOB#B00953823.
B00839247-S3
03/19/2025
Signed off — Alteration CO
INSTALLATION/MODIFICATION OF PLUMBING & SPRINKLER SYSTEM IN CONJUNCTION WITH B00839247-I1. (SUPERMARKET) THIS APPLICATION IS TO SUPERSEDE OLD BIS#310171079. FIRE ALARM FILED UNDER FDNY APPLICATION#2023-TMFALM-003251. GAS WORK IS DONE UNDER DOB#B00953823.
B00839247-S4
03/10/2025
Permit issued — Sprinklers
B00839247-S3-EW-SP
03/05/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/03/2025
Permit issued — Sprinklers
B00839247-S3-PL
03/03/2025
Permit issued — Sprinklers
B00839247-S3-PL
02/28/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/28/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
Latest 60 of 136 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedSEOUL INTERIOR & BUILD IN07/21/2026
DOB NOWSprinklersSigned-offPETER PLUMBING ASSOC. INC.03/10/2025
DOB NOWSprinklersSigned-offPETER PLUMBING ASSOC. INC.03/03/2025
DOB NOWSprinklersSigned-offKINGS GROUP NY CORP03/03/2025
DOB NOWGeneral ConstructionPermit IssuedNEXTCOM CONSTRUCTION, INC09/23/2024
DOB NOWMechanical SystemsSigned-offNEXTCOM CONSTRUCTION, INC06/10/2024
DOB NOWSprinklersSigned-offPETER PLUMBING ASSOC. INC.02/16/2024
DOB NOWGeneral ConstructionPermit IssuedNEXTCOM CONSTRUCTION, INC10/16/2023
DOB NOWFoundationSigned-offNEXTCOM CONSTRUCTION, INC10/16/2023
DOB NOWConstruction FenceSigned-offNEXTCOM CONSTRUCTION, INC10/05/2023
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP09/13/2023
DOB NOWSprinklersSigned-offPETER PLUMBING ASSOC. INC.06/27/2023
DOB NOWFoundationSigned-offNEXTCOM CONSTRUCTION, INC06/06/2023
DOB NOWGeneral ConstructionPermit IssuedNEXTCOM CONSTRUCTION, INC06/06/2023
DOB NOWMechanical SystemsSigned-offNEXTCOM CONSTRUCTION, INC06/06/2023
DOB NOWMechanical SystemsSigned-offNEXTCOM CONSTRUCTION, INC07/01/2021
BISOTISSUEDVOLTAIR SOLAR LLC05/22/2024
BISOTISSUEDVOLTAIR SOLAR LLC12/22/2023
BISOTISSUEDJTJ STUDIO CORP02/28/2020
BIS—ISSUEDUNITECH DESIGN INC11/24/2009
BISOTISSUEDINSITE NYC INC12/30/2008
BISPLISSUEDPLUMBING & HTG DOCTOR INC07/28/2008
BISSPISSUEDPLUMBING & HTG DOCTOR INC07/28/2008
BISOTISSUEDINSITE NYC INC.04/04/2008
BISEQISSUEDINSITE NYC INC.04/04/2008
BISOTISSUEDC-TOWN SUPERMARKET08/25/1992
2 projects · most recent 07/16/2026
Ventilation Systems Heating and Air Conditioning Systems Refrigeration Systems
FiledStatusContractorScopeMake / Model / Capacity
07/16/2026Permit IssuedSEOUL INTERIOR & BUILD INVentilation Systems
Ventilation
Naks SF7 2,000 CFM · Kitchen Exhaust ×1
12/09/2025Permit IssuedNEXTCOM CONSTRUCTION, INCHeating and Air Conditioning Systems, Refrigeration Systems
Heat / Cool
Johnson Controls ZJ150N18R2A1BAA1A2 180,000 BTU · Chiller ×4
Refrigeration
Hussmann CS0207TDK 83,650 CFM · Condensing Unit ×1
LEVE-27410KA CPC1 NCA4 83,650 CFM · Condensing Unit ×1
1 project · most recent 12/09/2025
Sprinkler System
FiledStatusContractorScope
12/09/2025Signed-offPETER PLUMBING ASSOC. INCSprinkler System
1 project · most recent 12/09/2025
Water/Sanitary
FiledStatusContractorScope
12/09/2025Signed-offPETER PLUMBING ASSOC. INCWater/Sanitary
4 projects · most recent 05/20/2025
General Wiring Lighting
FiledStatusContractorScope
05/20/2025CompletePOWER ELECTRICAL CONTS INGeneral Wiring, Lighting
03/27/2025CompleteB.P. ELECTRIC CORP—
10/07/2024CompleteY.S ELECTRICGeneral Wiring, Lighting
09/13/2023CompleteNASH ELECTRIC SERVICES IN—
1 project · most recent 12/09/2025
Steel Concrete Masonry
FiledStatusContractorScope
12/09/2025Signed-offPETER PLUMBING ASSOC. INCSteel, Concrete, Masonry
1 project · most recent 12/09/2025
Fence
FiledStatusContractorScope
12/09/2025Signed-offPETER PLUMBING ASSOC. INCFence
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
04/10/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/18/2026Fail-Final CND-Occupancy InspectionFailView ↗
05/30/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/05/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/28/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/28/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/14/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 102
DateRequirementInspectorRole
07/06/2026FinalSUKHWAN KIMprogress
07/06/2026Mechanical SystemsSUKHWAN KIMspecial
01/14/2026Interior lighting powerTae Chongenergy_progress
01/14/2026Sprayed fire-resistant materialsTae Chongspecial
01/14/2026Fire-Resistant Penetrations and JointsTae Chongspecial
01/14/2026Construction Operations Influencing Adjacent StructuresTae Chongspecial
01/14/2026Structural Stability – Alterations of existing buildingsTae Chongspecial
01/14/2026Energy Code Compliance InspectionsTae Chongprogress
01/14/2026Fire-Resistance Rated ConstructionTae Chongprogress
01/14/2026Fenestration air leakageTae Chongenergy_progress
01/14/2026Insulation placement and R valuesTae Chongenergy_progress
01/14/2026Fenestration and door U-factor and product ratingsTae Chongenergy_progress
01/14/2026Exterior lighting powerTae Chongenergy_progress
01/14/2026Lighting controlsTae Chongenergy_progress
01/14/2026Air barrier - visual inspectionTae Chongenergy_progress
01/14/2026Fenestration areasTae Chongenergy_progress
12/08/2025Fenestration areasTae Chongenergy_progress
12/08/2025Fenestration air leakageTae Chongenergy_progress
12/08/2025Insulation placement and R valuesTae Chongenergy_progress
12/08/2025Interior lighting powerTae Chongenergy_progress
12/08/2025Lighting controlsTae Chongenergy_progress
12/08/2025Air barrier - visual inspectionTae Chongenergy_progress
12/08/2025Exterior lighting powerTae Chongenergy_progress
12/08/2025Fenestration and door U-factor and product ratingsTae Chongenergy_progress
12/08/2025Fire-Resistance Rated ConstructionTae Chongprogress
Latest 25 of 102.
▾Documents — 285 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
09/01/2026B00539053-I1Request digital key ↗
08/27/2026B08051067-I1Request digital key ↗
08/26/2026B00932938-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸Applications & Permits38
▸BISPLAN / WORK APPROVAL APPLICATION28
06/04/2024310086876Open ↗
05/20/2024310171079Open ↗
05/08/2024310171079Open ↗
Showing 3 of 28 on file for this type
▸BISWORK PERMIT APPLICATION10
12/22/2023340885607Open ↗
03/05/2020310086876Open ↗
03/05/2020310086876Open ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram5
08/15/2026B00839247-I1Open ↗
08/13/2026B00839247-P6Open ↗
08/13/2026B00839247-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)2
08/15/2026B00839247-I1Open ↗
08/13/2026B00839247-P6Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
02/21/2023321793056Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026B00839247-I1Open ↗
▸Seals & Professional Certifications71
▸DOB NOWProgress Inspector Seal & Signature23
09/23/2026B00839247-P1Open ↗
09/12/2026B00839247-I1Open ↗
09/12/2026B00839247-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/01/2026B00539053-I1Open ↗
08/27/2026B08051067-I1Open ↗
08/26/2026B00932938-I1Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
09/18/2019321987276Open ↗
12/31/2008310124941Open ↗
12/30/2008310086876Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/23/2026B00839247-P1Open ↗
09/12/2026B00839247-I1Open ↗
09/01/2026B00839247-P6Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
07/24/2008310171079Open ↗
04/02/2008310124941Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
07/24/2008310171079Open ↗
04/02/2008310124941Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
04/21/2023340885607Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/15/2024340910848Open ↗
▸BISPC FULL REPORT1
02/14/2008310086876Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING5
06/02/2009310171079Open ↗
01/17/2009310171079Open ↗
08/19/2008310086876Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS1
12/08/2022310086876Open ↗
▸Safety & Tenant Protection12
▸DOB NOWStreet Tree Checklist7
08/19/2026B00839247-S1Open ↗
08/19/2026B00839247-P2Open ↗
08/19/2026B00839247-P1Open ↗
Showing 3 of 7 on file for this type
▸BISST-1: Street Tree Checklist3
12/30/2008310086876Open ↗
11/18/2008310086876Open ↗
07/24/2008310171079Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
12/22/2023340885607Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
12/07/2022310086876Open ↗
▸Environmental & Asbestos36
▸DOB NOWOER: Notice to Proceed11
09/01/2026B00539053-I1Open ↗
08/15/2026B00839247-I1Open ↗
08/13/2026B00839247-P3Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWOER: Notice of Satisfaction9
09/01/2026B00539053-I1Open ↗
08/15/2026B00839247-I1Open ↗
08/13/2026B00839247-P6Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
08/27/2026B08051067-I1Open ↗
08/19/2026B00839247-S1Open ↗
08/19/2026B00839247-S2Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
07/24/2008310171079Open ↗
04/02/2008310124941Open ↗
02/14/2008310086876Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
09/01/2009320063756Open ↗
09/01/2009320063747Open ↗
04/22/2008310086876Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
03/03/2025340910848Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
04/21/2023340885607Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/21/2023340885607Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026B01426458-I1Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
05/12/2025340885607Open ↗
01/10/2024340885607Open ↗
04/21/2023340885607Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
04/21/2023340885607Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
05/12/2025340885607Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/24/2023310086876Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/12/2025340885607Open ↗
▸BISTR8: Energy Code Progress Inspections1
07/25/2014310086876Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00839247-S2Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/01/2026B00539053-I1Open ↗
▸Inspections & Test Reports15
▸BISTECHNICAL REPORT: RESPONSIBILITY5
05/12/2025340885607Open ↗
01/10/2024340885607Open ↗
04/21/2023340885607Open ↗
Showing 3 of 5 on file for this type
▸BISFOOTING AND FOUNDATION INSPECTION1
12/07/2022310086876Open ↗
▸BISMASONRY1
12/07/2022310086876Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
12/07/2022310086876Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
12/07/2022310086876Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
12/07/2022310086876Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
11/18/2008310086876Open ↗
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION1
12/07/2022310086876Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
12/07/2022310086876Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
12/07/2022310086876Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
12/07/2022310086876Open ↗
▸Approvals, Objections & Sign-offs15
▸BISADMINISTRATIVE OBJECTIONS5
09/01/2009320063756Open ↗
09/01/2009320063747Open ↗
07/24/2008310171079Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
03/12/2016320063756Open ↗
03/12/2016320063747Open ↗
07/25/2014310086876Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
05/15/2025340885607Open ↗
03/12/2016320063756Open ↗
03/12/2016320063747Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
07/15/2025340910848Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
09/18/2019321987276Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT10
04/21/2023340885607Open ↗
09/18/2019321987276Open ↗
03/12/2016320063756Open ↗
Showing 3 of 10 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
05/12/2025340885607Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
03/05/2020310086876Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
03/05/2020310086876Open ↗
▸Filing & Intake Forms12
▸BISEFILING COVER SHEET7
01/25/2023321793056Open ↗
09/18/2019321987276Open ↗
09/01/2009320063756Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION4
04/21/2023340885607Open ↗
04/21/2023340885607Open ↗
12/30/2020310086876Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
04/21/2023340885607Open ↗
▸Other Documents31
▸DOB NOWSite Survey: Initial7
08/15/2026B00839247-I1Open ↗
08/13/2026B00839247-P4Open ↗
08/13/2026B00839247-P6Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone7
08/15/2026B00839247-I1Open ↗
08/13/2026B00839247-P1Open ↗
08/13/2026B00839247-P6Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlot Diagram7
08/15/2026B00839247-I1Open ↗
08/13/2026B00839247-P6Open ↗
08/13/2026B00839247-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProperty Ownership Certification5
08/27/2026B08051067-I1Open ↗
08/19/2026B00839247-P1Open ↗
08/15/2026B00839247-I1Open ↗
Showing 3 of 5 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
01/25/2023321793056Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
02/21/2023321793056Open ↗
▸BISTax Abatement Miscellaneous1
05/15/2025340885607Open ↗
▸BISUNDERPINNING1
12/07/2022310086876Open ↗
▸DOB NOWFinal Survey1
08/15/2026B00839247-I1Open ↗