Crown Gardens
1185 CARROLL STREET · BIN 3337867
💬 Discuss this project
1972Year Built
15Stories
D4Building Class
R7-1Zoning
221,100 sfGross Floor Area
241Units
LL97 CoveredRent Stabilized139 Active Violations 121 unresolved · 18 paperwork only 4 likely answered 7 old, status unconfirmed ▸FISP: UNSAFEFDNY Report ↗
Elevator cooperative · Owner of record: Crown Gardens Housing · 92,506 sf lot · 2.39 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsMetro Management Development, Inc.Under Construction3 filings
RoofMetro Management Development, Inc.Under Construction2p · 2 filings · 2 docs
BulkheadMetro Management Development, Inc.Under Construction2p · 2 filings · 7 docs
Floor 2Crown Garden HousingUnder Construction1p · 1 filing
Floor 1Crown Garden HousingUnder Construction1p · 2 filings · 2 docs
CellarMetro Management Development, Inc.1 filing · 2 docs
Site & exteriorMetro Management Development, Inc.Under Construction3 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Crown Gardens Housing1803/22/2026
Highlawn Terrace707/01/2026
East Coast USA Construction203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Lawless & Mangione807/22/2026
Soni Engineering Consulting112/15/2025
Joel Phagoo P.E109/16/2024
Queens102/08/2024
Dean Mendez RA109/19/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Xinos Construction403/21/2026
AE Design Solution403/21/2026
A1 Expediting Service203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Akm Construction NYScaffold407/01/2026
Futura Builders GroupGeneral Contractor307/22/2026
Tower ElectricElectrical103/21/2026
A & H InstallationScaffold107/01/2026
Mega Electrical ContractingElectrical103/21/2026
Neptune MechanicalPlumbing107/29/2026
Matsikas VasiliosElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Special Testing & Consulting16881007/22/2026
Soni Engineering Consulting9819203/10/2026
KN3 Engineering9238112/15/2025
Queens Engineering8898102/08/2024
Building Lifecycle
All (165)Filed (13)Permit Issued (12)Signed Off (1)Facade (FISP) (13)Violation (60)Inspection (1)Objection (42)Special Inspection (23)
10/02/2026
Permit issued — Sidewalk Shed
B01111675-I1-SH
08/30/2026
Violation issued (HPD, open)
C
08/30/2026
Violation issued (HPD, open)
B
08/30/2026
Violation issued (HPD, open)
B
08/30/2026
Violation issued (HPD, open)
C
08/30/2026
Violation issued (HPD, open)
B
08/30/2026
Violation issued (HPD, open)
B
08/28/2026
Violation issued (ECB, open)
Construction
08/28/2026
Violation issued (ECB, open)
Unknown
08/24/2026
Violation issued (HPD, open)
B
08/19/2026
Violation issued (HPD, open)
B
08/19/2026
Violation issued (HPD, open)
B
08/19/2026
Violation issued (HPD, open)
C
08/19/2026
Violation issued (HPD, open)
B
08/19/2026
Violation issued (HPD, open)
B
08/19/2026
Violation issued (HPD, open)
B
08/19/2026
Violation issued (HPD, open)
B
08/19/2026
Violation issued (HPD, open)
B
08/19/2026
Violation issued (HPD, open)
C
08/14/2026
Inspection — Fail-Final PL - More than 10 Requested Floors
Fail
View inspection ↗
08/11/2026
Special inspection requirement — Mechanical Systems
SEBASTIAN SETTEDUCATE JR., P.E
08/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
jamal taha
08/11/2026
Special inspection requirement — HVAC-R and service water heating system controls
jamal taha
08/11/2026
Special inspection requirement — Final
jamal taha
08/11/2026
Special inspection requirement — Tenant Protection Plan Compliance
SEBASTIAN SETTEDUCATE JR., P.E
07/28/2026
Permit issued — Plumbing
B01186185-I1-PL
07/24/2026
Violation issued (HPD, open)
C
07/22/2026
Filed — Alteration
Replacement of existing sanitary, vent, water piping and valves as shown on plans. No change is use or egress.
B01186185-P1
07/22/2026
Filed — Alteration
Replacement and installation of new mechaical equipment as shown on plans.
B01186171-P1
07/20/2026
Permit issued — General Construction
B01179815-I1-GC
07/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
07/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
jamal taha
07/20/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/20/2026
Special inspection requirement — Mechanical Systems
SEBASTIAN SETTEDUCATE JR., P.E
07/20/2026
Special inspection requirement — Final
jamal taha
07/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
jamal taha
07/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
jamal taha
07/20/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/29/2026
Permit issued — Sidewalk Shed
B01111675-I1-SH
05/28/2026
Violation issued (ECB, open)
Construction
05/28/2026
Violation issued (ECB, open)
Construction
05/28/2026
Violation issued (ECB, open)
Construction
05/28/2026
Violation issued (ECB, closed)
Cranes and Derricks
05/06/2026
Permit issued — General Construction
B01389154-I1-GC
05/04/2026
Violation issued (HPD, open)
C
04/22/2026
Filed — Alteration
Filing for facade repairs , balcony and concrete repairs and coating. No change in use, occupancy or egress.
B01389154-I1
04/22/2026
Special inspection requirement — Air barrier - visual inspection
ANTHONY ORLANDO
04/22/2026
Special inspection requirement — Masonry
SEBASTIAN SETTEDUCATE JR., P.E
04/22/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SEBASTIAN SETTEDUCATE JR., P.E
04/22/2026
Special inspection requirement — Energy Code Compliance Inspections
ANTHONY ORLANDO
04/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
SEBASTIAN SETTEDUCATE JR., P.E
04/17/2026
Special inspection requirement — Final
ANTHONY ORLANDO
04/03/2026
Permit issued — Structural
B01300086-I1-ST
04/02/2026
Violation issued (HPD, open)
B
03/30/2026
Permit issued — Sidewalk Shed
B01111675-I1-SH
03/16/2026
Permit issued — Suspended Scaffold
B01369709-I1-SC
03/11/2026
Violation issued (HPD, closed)
C
03/10/2026
Filed — Alteration
Installation of suspended scaffold for facade work or inspection.
B01369709-I1
03/09/2026
Violation issued (FDNY_NOV, closed)
02/12/2026
Cycle 9 facade report submitted
Latest 60 of 165 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedStream Rock Contsruction*10/02/2026
DOB NOWPlumbingPermit IssuedNeptune Mechanical07/28/2026
DOB NOWGeneral ConstructionPermit IssuedFutura Builders Group07/20/2026
DOB NOWSidewalk ShedPermit IssuedAkm Construction NY06/29/2026
DOB NOWGeneral ConstructionPermit IssuedFutura Builders Group05/06/2026
DOB NOWStructuralPermit IssuedGyasi Jackson04/03/2026
DOB NOWSidewalk ShedPermit IssuedAkm Construction NY03/30/2026
DOB NOWSuspended ScaffoldPermit IssuedFutura Builders Group03/16/2026
DOB NOWSidewalk ShedPermit IssuedA H Installation01/20/2026
DOB NOWSidewalk ShedPermit IssuedAkm Construction NY09/15/2025
DOB NOWSidewalk ShedPermit IssuedAkm Construction NY09/17/2024
DOB NOWSuspended ScaffoldPermit IssuedXinos Construction02/09/2024
BISEQISSUEDEmpire Scaffolding System10/03/2017
BISOTISSUEDEast Coast USA Construction01/04/2017
BISEQISSUEDEast Coast USA Construction09/07/2016
BISMHISSUEDC C Controlled Combustion07/25/2016
BISOTISSUEDC C Controlled Combustion02/25/2016
BISPLISSUEDCC Controlled Plumbing Co02/25/2016
BISEQISSUEDXinos Construction03/02/2015
BISOTISSUEDXinos Construction02/25/2015
BISEQISSUEDXinos Construction02/24/2015
BISOTISSUEDXinos Construction07/15/2014
BISEQISSUEDXinos Construction03/03/2014
BISEQISSUEDXinos Construction02/24/2014
BISEQISSUEDXinos Construction10/16/2013
BISEQISSUEDXinos Construction09/05/2013
BISOTISSUEDMillenium Restoration06/13/2007
BISEQISSUEDStar-Cel Waterproofing12/14/2001
BISFBISSUEDC C Controlled Combustion04/28/1993
BISPLISSUEDKofsky & Sons04/28/1993
1 project · most recent 07/22/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/22/2026——Ventilation Systems
Ventilation
Greenheck G-099-VG 650 CFM · Exhaust Fan ×18
Renewaire HE2XRT 650 CFM · Erv ×4
1 project · most recent 07/22/2026
Storm Water/Sanitary
FiledStatusContractorScope
07/22/2026Permit IssuedNeptune MechanicalStorm, Water/Sanitary
4 projects · most recent 01/20/2026
General Wiring Boiler Controls
FiledStatusContractorScope
01/20/2026Permit IssuedRichard Neu—
09/12/2024Permit IssuedHigh Quality Electric of—
03/02/2023Permit IssuedSafetech Electrical ContngGeneral Wiring
10/01/2020CompleteKraft ElectricBoiler Controls
4 projects · most recent 04/22/2026
Concrete Masonry Steel
FiledStatusContractorScope
04/22/2026Permit IssuedFutura Builders Group1 scope_items
12/15/2025Permit IssuedFutura Builders Group2 scope_items
03/06/2025——Concrete, Masonry
03/03/2025——Steel
1 project · most recent 09/16/2024
Sidewalk Shed
FiledStatusContractorScope
09/16/2024Permit IssuedAkm Construction NYSidewalk Shed
1 project · most recent 03/10/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
03/10/2026Permit IssuedFutura Builders GroupSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/14/2026Fail-Final PL - More than 10 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
08/11/2026Mechanical SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
08/11/2026HVAC-R and service water piping design and insulationjamal tahaenergy_progress
08/11/2026HVAC-R and service water heating system controlsjamal tahaenergy_progress
08/11/2026Finaljamal tahaprogress
08/11/2026Tenant Protection Plan ComplianceSEBASTIAN SETTEDUCATE JR., P.Especial
07/20/2026Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
07/20/2026HVAC-R and service water piping design and insulationjamal tahaenergy_progress
07/20/2026Tenant Protection Plan Compliance—special
07/20/2026Mechanical SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
07/20/2026Finaljamal tahaprogress
07/20/2026HVAC-R and service water piping design and insulationjamal tahaenergy_progress
07/20/2026HVAC-R and service water heating system controlsjamal tahaenergy_progress
07/20/2026Tenant Protection Plan Compliance—special
04/22/2026Air barrier - visual inspectionANTHONY ORLANDOenergy_progress
04/22/2026MasonrySEBASTIAN SETTEDUCATE JR., P.Especial
04/22/2026Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
04/22/2026Energy Code Compliance InspectionsANTHONY ORLANDOprogress
04/21/2026Tenant Protection Plan ComplianceSEBASTIAN SETTEDUCATE JR., P.Especial
04/17/2026FinalANTHONY ORLANDOprogress
12/15/2025Tenant Protection Plan ComplianceKUNAL BAKHTARWALAspecial
10/09/2025Post-installed Anchorsnayan sonispecial
10/08/2025Structural Stability – Alterations of existing buildingsnayan sonispecial
10/08/2025Finalnayan soniprogress
▾Documents — 164 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/26/2026B00935600-I1Request digital key ↗
08/26/2026B00993305-I1Request digital key ↗
08/24/2026B01111675-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits25
▸BISWORK PERMIT APPLICATION15
10/02/2017340550362Open ↗
12/29/2016340459293Open ↗
09/05/2016340416776Open ↗
Showing 3 of 15 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION8
10/02/2017340550362Open ↗
02/14/2017340080272Open ↗
12/29/2016340459293Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
08/04/2017321102524Open ↗
01/25/2017320776870Open ↗
▸Seals & Professional Certifications54
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/26/2026B00993305-I1Open ↗
08/22/2026B01179815-I1Open ↗
08/22/2026B01186185-P1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
10/22/2019321102524Open ↗
10/22/2019321102524Open ↗
04/04/2017320881792Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/24/2026B01186171-P1Open ↗
09/24/2026B01186171-P1Open ↗
09/01/2026B01186185-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/24/2026B01186171-P1Open ↗
09/01/2026B01186185-P1Open ↗
08/29/2026B01300086-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
10/02/2017340550362Open ↗
12/29/2016340459293Open ↗
09/05/2016340416776Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
10/02/2017340550362Open ↗
12/29/2016340459293Open ↗
09/05/2016340416776Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
10/02/2017340550362Open ↗
12/29/2016340459293Open ↗
09/05/2016340416776Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/02/2013320881792Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
11/14/2017321102524Open ↗
11/01/2017321102524Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
09/24/2015321102524Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES2
10/02/2017340550362Open ↗
09/05/2016340416776Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/19/2026B01300086-I1Open ↗
08/17/2026B01389154-I1Open ↗
08/13/2026B01184447-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
11/02/2013320881792Open ↗
06/26/2013320776870Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
02/26/2016321102524Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
11/02/2013320881792Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
12/29/2016340459293Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
10/22/2019321102524Open ↗
10/22/2019321102524Open ↗
02/15/2017320776870Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
10/22/2019321102524Open ↗
02/15/2017320776870Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
10/02/2017340550362Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/29/2016340459293Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
10/02/2017340550362Open ↗
12/29/2016340459293Open ↗
09/05/2016340416776Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs21
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter9
08/22/2026B01186185-P1Open ↗
08/22/2026B01186171-P1Open ↗
08/17/2026B01389154-I1Open ↗
Showing 3 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
10/22/2019321102524Open ↗
04/04/2017320881792Open ↗
04/04/2017340080272Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP Variance (V5) letter3
08/22/2026B01179815-I1Open ↗
08/22/2026B01184383-I1Open ↗
08/22/2026B01186185-I1Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
11/02/2013320881792Open ↗
06/26/2013320776870Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
09/30/2014320776870Open ↗
▸BISSHED LETTER1
03/06/2014340080272Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
10/22/2019321102524Open ↗
02/15/2017320776870Open ↗
12/29/2016340459293Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms12
▸BISADDITIONAL INFORMATION4
06/11/2018321102524Open ↗
08/16/2017321102524Open ↗
02/14/2017340080272Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
10/02/2017340550362Open ↗
12/29/2016340459293Open ↗
09/05/2016340416776Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET3
09/24/2015321102524Open ↗
11/02/2013320881792Open ↗
06/26/2013320776870Open ↗
▸BISBOROUGH INTAKE FORM1
10/22/2019321102524Open ↗
▸Other Documents8
▸DOB NOWManufacturer's Specifications2
08/13/2026B01369709-I1Open ↗
08/13/2026B00993305-I1Open ↗
▸DOB NOWCalculations2
08/13/2026B00993305-I1Open ↗
08/13/2026B01369709-I1Open ↗
▸BISFEE EXEMPTION DOCUMENTATION1
10/02/2017340550362Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
09/04/2013340080272Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
02/16/2017340080272Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01179815-I1Open ↗