← Back
BuildNYC
Elevator apt, semi-fireproof without stores
1185 WASHINGTON AVENUE
BRONX · BIN 2130695
💬 Discuss this project
2021Year Built
7Stories
D1Building Class
R7-1Zoning
19,938 sfGross Floor Area
28Units
Rent Stabilized10 Active Violations ▸
Elevator apt, semi-fireproof without stores · Owner of record: 1185 Washington Ave · 5,610 sf lot · 3.55 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofDomestic water system modification12p · 4 filings · 17 docs
BulkheadSupport of excavation and foundation2p · 2 filings · 16 docs
Floor 7Plumbing and sprinkler systems filing21p · 4 filings · 20 docs
Floor 6Plumbing and sprinkler systems filing20p · 4 filings · 20 docs
Floor 5Plumbing and sprinkler systems filing20p · 4 filings · 20 docs
Floor 4Plumbing and sprinkler systems filing17p · 4 filings · 20 docs
Floor 3Plumbing and sprinkler systems filing17p · 4 filings · 20 docs
Floor 2Plumbing and sprinkler systems filing21p · 4 filings · 20 docs
Floor 1Plumbing and sprinkler systems filing19p · 5 filings · 20 docs
CellarSupport of excavation and foundation15p · 2 filings · 7 docs
Site & exteriorPlumbing and sprinkler systems filing15p · 5 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1185 Washington Ave803/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/07/2020$950K—Private party → 1185 WASHINGTON AVE LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMG Group USA303/21/2026
AE Design Solution1003/21/2026
Ymbluefiling103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Core Scaffold SystemsScaffold903/21/2026
Precision Builders USAGeneral Contractor807/08/2026
Precision Builders USAScaffold407/08/2026
Precision Builders USAspecialty_contractor303/21/2026
Watson's Plumbing, Heating, & BuildingPlumbing207/08/2026
RRP PlumbingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Engineering Consulting SE2050410/18/2021
IP Concrete Testing and I6252104/26/2021
Building Lifecycle
11/09/2026
Elevator Category 1 inspection report filed
09/01/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL VENTILATION SYSTEM IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 7C,…
HPD violation · open
09/01/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL VENTILATION SYSTEM IN THE KITCHEN LOCATED AT APT 7C, 7th STORY, 1st…
HPD violation · open
07/21/2026
Class 1 (cu):failure to maintain building in code compliant manner passenger elevator equipment as per BC3001.2 & 27-987. Upon inspection, elevator…
ECB violation · open
02/11/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SLIDING DOOR OFF TRACK AT EAST WALL IN THE KITCHEN LOCATED AT APT 7C, 7th STORY,…
HPD violation · open
106 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offWatson's Plumbing, Heating, & Building10/20/2023
DOB NOWMechanical SystemsSigned-offPrecision Builders USA01/31/2023
DOB NOWPlumbingSigned-offWatson's Plumbing, Heating, & Building02/25/2022
DOB NOWSprinklersSigned-offRalph W. Landolfi JR02/24/2022
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems09/27/2021
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems09/07/2021
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems08/26/2021
DOB NOWCurb CutSigned-offPrecision Builders USA08/16/2021
DOB NOWStructuralSigned-offPrecision Builders USA08/10/2021
DOB NOWSupport of ExcavationSigned-offPrecision Builders USA06/18/2021
DOB NOWConstruction FenceSigned-offPrecision Builders USA05/15/2021
DOB NOWConstruction FenceSigned-offPrecision Builders USA10/05/2020
BIS—ISSUEDPrecision Builders USA02/15/2023
BIS—ISSUEDPrecision Builders USA08/12/2021
1 project · most recent 12/14/2023
Water/Sanitary
FiledStatusContractorScope
12/14/2023Signed-offWatson's Plumbing, Heating, & BuildingWater/Sanitary
4 projects · most recent 03/15/2023
General Wiring
FiledStatusContractorScope
03/15/2023CompleteTFK ElectricGeneral Wiring
05/26/2022CompleteV. Vass Electric—
11/30/2021CompleteStar Electrical Contractors—
11/09/2021CompleteTFK Electric—
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
12/21/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/10/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/07/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/05/2023Pass-Final General Construction Non-Directive 14PassView ↗
04/04/2023Fail-Final General Construction Non-Directive 14FailView ↗
03/07/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
03/02/2023Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
02/22/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
02/15/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
02/09/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/30/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/14/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/14/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/14/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/14/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
12/20/2023Fire-Resistant Penetrations and Joints—special
12/20/2023Energy Code Compliance InspectionsPAUL MARINOprogress
12/20/2023HVAC-R and service water piping design and insulationPAUL MARINOenergy_progress
12/12/2023Energy Code Compliance InspectionsPAUL MARINOprogress
12/12/2023HVAC-R and service water piping design and insulationPAUL MARINOenergy_progress
12/12/2023Fire-Resistant Penetrations and Joints—special
09/02/2021Fire-Resistant Penetrations and JointsPAUL MARINOspecial
09/02/2021HVAC and service water heating equipment PAUL MARINOenergy_progress
09/02/2021Shutoff dampersPAUL MARINOenergy_progress
09/02/2021Heating SystemsPAUL MARINOspecial
09/02/2021Energy Code Compliance InspectionsPAUL MARINOprogress
09/02/2021HVAC insulation and sealing PAUL MARINOenergy_progress
09/02/2021Maintenance informationPAUL MARINOenergy_progress
09/02/2021HVAC and service water heating system controls PAUL MARINOenergy_progress
06/09/2021Excavations - Sheeting, Shoring, and BracingPAUL MARINOspecial
08/03/2020FinalNAVEEN KUMARprogress
08/03/2020Mechanical SystemsPAUL MARINOspecial
137 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account