Elevator apt, fireproof without stores
EAST 229TH STREET
BRONX · BIN 2093739
💬 Discuss this project
1951Year Built
14Stories
D3Building Class
R5Zoning
1,028,976 sfGross Floor Area
1,019Units
LL97 CoveredRent Stabilized123 Open Violations 111 unresolved · 12 paperwork only ▸
Elevator apt, fireproof without stores · Owner of record: CSA PRESERVATION PARTNERS LLC · 1,003,262 sf lot · 1.03 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingLandscape
Permit Issued — active, not yet Signed-off
Roof3p · 2 filings · 20 docs
CellarUnder Construction36p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CSA PRESERVATION PARTNERS LLC6309/13/2026
NEW YORK CITY HOUSING AUTHORITY1206/28/2026
NYCHA803/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.2403/21/2026
A1 EXPEDITING SERVICE403/21/2026
Rigid Structural Design, LLC103/21/2026
HIERARCH-E203/21/2026
JULIAN A. GOMEZ403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RIVER CITY BUILDERS LLCGeneral Contractor1507/08/2026
ROCKLEDGE SCAFFOLD CORPGeneral Contractor407/08/2026
ACCORD POWER INCGeneral Contractor403/21/2026
CAPONE ELECL CONTRS CORPElectrical303/22/2026
4 BROTHERS & SONS FENCEGeneral Contractor307/08/2026
SAP CONSTRUCTION LLCGeneral Contractor303/21/2026
STEPHENS, KENNETHElectrical103/21/2026
INPRO PLUMBING CORPPlumbing107/08/2026
SNS ORGNIZATION LTDGeneral Contractor104/09/2026
HAY MECHANICAL SOLUTIONSPlumbing106/27/2026
THOMAS KELLYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS1061307/21/2026
SYNERGIC DESIGN LLC8561203/23/2026
RAND ENGINEERING & ARCHIT266208/27/2025
Building Lifecycle
All (109)Filed (21)Permit Issued (24)Signed Off (3)Violation (21)Inspection (6)Objection (4)Special Inspection (30)
08/24/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/19/2026
Signed off — Alteration
REMOVAL AND REPLACEMENT OF THE EXISTING STEAM SUPPLIED HOT WATER GENERATION TO A DIRECT NATURAL GAS FIRED WATER HEATING SYSTEM. ADDITIONAL SUPPLY AND RETURN PIPING AT CELLAR LEVEL. NO CHANGE TO EXISTING USE, OCCUPANCY OR EGRESS.
X08053545-I1
07/21/2026
Filed — Alteration
REMOVAL AND REPLACEMENT OF THE EXISTING STEAM SUPPLIED HOT WATER GENERATION TO A DIRECT NATURAL GAS FIRED WATER HEATING SYSTEM. ADDITIONAL SUPPLY AND RETURN PIPING AT CELLAR LEVEL. NO CHANGE TO EXISTING USE, OCCUPANCY OR EGRESS.
X08053545-P8
05/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/20/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/12/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/01/2026
Permit issued — Plumbing
X08053545-S3-PL
03/27/2026
Special inspection requirement — Final
Malathi Ananthakrishnan
03/27/2026
Special inspection requirement — Energy Code Compliance Inspections
Malathi Ananthakrishnan
03/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Malathi Ananthakrishnan
03/27/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Malathi Ananthakrishnan
03/27/2026
Special inspection requirement — Air barrier - visual inspection
Malathi Ananthakrishnan
03/23/2026
Filed — Alteration
Installation of 48.505 kw solar energy system on roof. No change of occupancy, use or egress. Conduit Exterior Masonry.
X01118709-P1
03/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Malathi Ananthakrishnan
03/06/2026
Special inspection requirement — Final
Malathi Ananthakrishnan
03/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Malathi Ananthakrishnan
03/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Malathi Ananthakrishnan
02/25/2026
Permit issued — Mechanical Systems
X08053545-S4-MS
02/23/2026
Permit issued — Mechanical Systems
X08053545-S4-MS
02/10/2026
Permit issued — General Construction
X08053545-I1-GC
02/04/2026
Permit issued — Mechanical Systems
X08053545-S2-MS
01/16/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/08/2026
Permit issued — Solar
X01118709-I1-SL
01/06/2026
Permit issued — General Construction
X08053545-I1-GC
12/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
12/03/2025
Filed — Alteration
REMOVAL AND REPLACEMENT OF THE EXISTING STEAM SUPPLIED HOT WATER GENERATION TO A DIRECT NATURAL GAS FIRED WATER HEATING SYSTEM. ADDITIONAL SUPPLY AND RETURN PIPING AT CELLAR LEVEL. NO CHANGE TO EXISTING USE, OCCUPANCY OR EGRESS.
X08053545-P7
10/08/2025
Signed off — Alteration
Limited Exterior Repairs & Roof Replacement not to include replacement of the entire underlying roof deck or assembly. No change to use, egress or occupancy.
X00882781-I1
09/30/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
09/18/2025
Special inspection requirement — Heating Systems
GEORGE GHEBRYAL
09/18/2025
Special inspection requirement — Mechanical Systems
GEORGE GHEBRYAL
09/18/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
09/10/2025
Filed — Alteration
REMOVAL AND REPLACEMENT OF THE EXISTING STEAM SUPPLIED HOT WATER GENERATION TO A DIRECT NATURAL GAS FIRED WATER HEATING SYSTEM. ADDITIONAL SUPPLY AND RETURN PIPING AT CELLAR LEVEL. NO CHANGE TO EXISTING USE, OCCUPANCY OR EGRESS.
X08053545-P6
09/05/2025
Special inspection requirement — Final
John Monroe
09/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
John Monroe
09/05/2025
Special inspection requirement — Masonry
John Monroe
09/05/2025
Special inspection requirement — Post-installed Anchors
John Monroe
09/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
09/04/2025
Permit issued — Plumbing
X08053545-S1-PL
08/27/2025
Filed — Alteration
Limited Exterior Repairs & Roof Replacement not to include replacement of the entire underlying roof deck or assembly. No change to use, egress or occupancy.
X00882781-P1
08/19/2025
Special inspection requirement — Tenant Protection Plan Compliance
08/19/2025
Special inspection requirement — Heating Systems
GEORGE GHEBRYAL
08/19/2025
Special inspection requirement — Mechanical Systems
GEORGE GHEBRYAL
08/19/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
07/25/2025
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
07/11/2025
Special inspection requirement — Post-installed Anchors
John Monroe
07/11/2025
Special inspection requirement — Masonry
John Monroe
07/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
John Monroe
07/11/2025
Special inspection requirement — Final
John Monroe
04/29/2025
Filed — Alteration
REMOVAL AND REPLACEMENT OF THE EXISTING STEAM SUPPLIED HOT WATER GENERATION TO A DIRECT NATURAL GAS FIRED WATER HEATING SYSTEM. ADDITIONAL SUPPLY AND RETURN PIPING AT CELLAR LEVEL. NO CHANGE TO EXISTING USE, OCCUPANCY OR EGRESS.
X08053545-P4
04/28/2025
Permit issued — General Construction
X08053545-I1-GC
04/23/2025
Filed — Alteration
REMOVAL AND REPLACEMENT OF THE EXISTING STEAM SUPPLIED HOT WATER GENERATION TO A DIRECT NATURAL GAS FIRED WATER HEATING SYSTEM. ADDITIONAL SUPPLY AND RETURN PIPING AT CELLAR LEVEL. NO CHANGE TO EXISTING USE, OCCUPANCY OR EGRESS.
X08053545-P5
04/01/2025
Special inspection requirement — Tenant Protection Plan Compliance
03/17/2025
Filed — Alteration
REMOVAL AND REPLACEMENT OF THE EXISTING STEAM SUPPLIED HOT WATER GENERATION TO A DIRECT NATURAL GAS FIRED WATER HEATING SYSTEM. ADDITIONAL SUPPLY AND RETURN PIPING AT CELLAR LEVEL. NO CHANGE TO EXISTING USE, OCCUPANCY OR EGRESS.
X08053545-S4
02/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
02/11/2025
Permit issued — General Construction
X08053545-I1-GC
02/05/2025
Permit issued — General Construction
X00882781-I1-GC
12/26/2024
Filed — Alteration
REMOVAL AND REPLACEMENT OF THE EXISTING STEAM SUPPLIED HOT WATER GENERATION TO A DIRECT NATURAL GAS FIRED WATER HEATING SYSTEM. ADDITIONAL SUPPLY AND RETURN PIPING AT CELLAR LEVEL. NO CHANGE TO EXISTING USE, OCCUPANCY OR EGRESS.
X08053545-P3
12/04/2024
Filed — Alteration
REMOVAL AND REPLACEMENT OF THE EXISTING STEAM SUPPLIED HOT WATER GENERATION TO A DIRECT NATURAL GAS FIRED WATER HEATING SYSTEM. ADDITIONAL SUPPLY AND RETURN PIPING AT CELLAR LEVEL. NO CHANGE TO EXISTING USE, OCCUPANCY OR EGRESS.
X08053545-S3
11/25/2024
Permit issued — Solar
X01118709-I1-SL
Latest 60 of 109 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedHAY MECHANICAL SOLUTIONS04/01/2026
DOB NOWMechanical SystemsSigned-offSNS ORGNIZATION LTD02/25/2026
DOB NOWMechanical SystemsSigned-offRIVER CITY BUILDERS LLC02/23/2026
DOB NOWGeneral ConstructionSigned-offRIVER CITY BUILDERS LLC02/10/2026
DOB NOWMechanical SystemsSigned-offRIVER CITY BUILDERS LLC02/04/2026
DOB NOWSolarPermit IssuedACCORD POWER INC01/08/2026
DOB NOWGeneral ConstructionSigned-offRIVER CITY BUILDERS LLC01/06/2026
DOB NOWPlumbingSigned-offINPRO PLUMBING CORP09/04/2025
DOB NOWGeneral ConstructionSigned-offRIVER CITY BUILDERS LLC04/28/2025
DOB NOWGeneral ConstructionSigned-offRIVER CITY BUILDERS LLC02/11/2025
DOB NOWGeneral ConstructionSigned-offRIVER CITY BUILDERS LLC02/05/2025
DOB NOWSolarPermit IssuedACCORD POWER INC11/25/2024
DOB NOWConstruction FencePermit Issued4 BROTHERS SONS FENCE10/31/2024
DOB NOWGeneral ConstructionSigned-offRIVER CITY BUILDERS LLC10/31/2024
DOB NOWConstruction FencePermit IssuedROCKLEDGE SCAFFOLD CORP10/10/2024
DOB NOWSidewalk ShedPermit IssuedROCKLEDGE SCAFFOLD CORP10/08/2024
DOB NOWSuspended ScaffoldSigned-offC.C.C. RENOVATION INC06/26/2024
DOB NOWGeneral ConstructionSigned-offRIVER CITY BUILDERS LLC05/13/2024
DOB NOWGeneral ConstructionSigned-offRIVER CITY BUILDERS LLC02/06/2024
DOB NOWConstruction FencePermit Issued4 BROTHERS SONS FENCE10/26/2023
DOB NOWSidewalk ShedPermit IssuedROCKLEDGE SCAFFOLD CORP10/12/2023
DOB NOWConstruction FencePermit IssuedROCKLEDGE SCAFFOLD CORP10/05/2023
DOB NOWGeneral ConstructionSigned-offRIVER CITY BUILDERS LLC07/07/2023
DOB NOWGeneral ConstructionSigned-offSAP CONSTRUCTION LLC07/06/2023
BISPLISSUEDGIACHETTI PLBG & HTG CORP04/03/2017
BISPLISSUEDGIACHETTI PLBG & HTG CORP03/30/2016
BISOTISSUEDNATIONAL ENVIROMENTAL SAFETY08/20/2010
BISPLISSUEDOLYMPIA MECHANICAL08/13/2004
BISOTISSUEDAJET ENTERPRISES INC.03/17/2003
1 project · most recent 07/21/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/21/2026Permit IssuedHAY MECHANICAL SOLUTIONSGas, Water/Sanitary
5 projects · most recent 04/22/2026
General Wiring
FiledStatusContractorScope
04/22/2026Permit IssuedY ELECTRIC INC—
12/09/2025Permit IssuedCAPONE ELECL CONTRS CORPGeneral Wiring
11/14/2025CompleteCAPONE ELECL CONTRS CORPGeneral Wiring
10/23/2024CompleteACCORD POWER ELECTRIC LLC2 meters, 1 new_meters
10/11/2023CompleteANTHONY G FERRY INC—
1 project · most recent 03/23/2026
FiledStatusContractorScope
03/23/2026Permit IssuedACCORD POWER INC89 panels, 48.5 kw, 8,595.92 roof_area_sqft
1 project · most recent 10/04/2023
Fence Sidewalk Shed
FiledStatusContractorScope
10/04/2023Permit IssuedROCKLEDGE SCAFFOLD CORPFence, Sidewalk Shed
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/24/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/22/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/20/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/12/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/16/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/30/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
03/27/2026FinalMalathi Ananthakrishnanprogress
03/27/2026Energy Code Compliance InspectionsMalathi Ananthakrishnanprogress
03/27/2026Fire-Resistant Penetrations and JointsMalathi Ananthakrishnanspecial
03/27/2026Structural Stability – Alterations of existing buildingsMalathi Ananthakrishnanspecial
03/27/2026Air barrier - visual inspectionMalathi Ananthakrishnanenergy_progress
03/23/2026Structural Stability – Alterations of existing buildingsMalathi Ananthakrishnanspecial
03/06/2026FinalMalathi Ananthakrishnanprogress
03/06/2026Energy Code Compliance InspectionsMalathi Ananthakrishnanprogress
03/06/2026Fire-Resistant Penetrations and JointsMalathi Ananthakrishnanspecial
12/18/2025Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
09/18/2025Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
09/18/2025Heating SystemsGEORGE GHEBRYALspecial
09/18/2025Mechanical SystemsGEORGE GHEBRYALspecial
09/18/2025FinalGEORGE GHEBRYALprogress
09/05/2025FinalJohn Monroeprogress
09/05/2025Structural Stability – Alterations of existing buildingsJohn Monroespecial
09/05/2025MasonryJohn Monroespecial
09/05/2025Post-installed AnchorsJohn Monroespecial
09/05/2025Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
08/19/2025Tenant Protection Plan Compliance—special
08/19/2025Heating SystemsGEORGE GHEBRYALspecial
08/19/2025Mechanical SystemsGEORGE GHEBRYALspecial
08/19/2025FinalGEORGE GHEBRYALprogress
07/25/2025Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
07/11/2025Post-installed AnchorsJohn Monroespecial
Latest 25 of 47.
▾Documents — 184 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
08/22/2026X00936746-S1Request digital key ↗
08/22/2026X00936746-I1Request digital key ↗
08/22/2026X00941655-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸Applications & Permits12
▸BISPLAN / WORK APPROVAL APPLICATION8
09/03/2020220335616Open ↗
09/02/2020220335616Open ↗
04/01/2016220335616Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION4
04/01/2016220335616Open ↗
08/20/2010220001959Open ↗
09/21/2009220001959Open ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram3
08/17/2026X08053545-P1Open ↗
08/17/2026X08053545-I1Open ↗
08/17/2026X08053545-P3Open ↗
▸Seals & Professional Certifications67
▸DOB NOWDPL-1: Design Professional Seal & Signature20
08/22/2026X00941655-I1Open ↗
08/18/2026X00882781-I1Open ↗
08/18/2026X00882781-P1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
09/01/2026X08053545-I1Open ↗
09/01/2026X08053545-I1Open ↗
09/01/2026X08053545-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/01/2026X08053545-I1Open ↗
09/01/2026X08053545-I1Open ↗
09/01/2026X00882781-I1Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
04/01/2016220335616Open ↗
10/04/2013220335616Open ↗
02/04/2013220001959Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
02/04/2013220001959Open ↗
04/16/2009220001959Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/16/2009220001959Open ↗
▸Trade Schedules & Equipment7
▸BISSELF-CERT PLUMBING NOTICE4
04/29/2010220001959Open ↗
04/26/2010220001959Open ↗
04/19/2010220001959Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING3
10/04/2013220335616Open ↗
04/16/2009220001959Open ↗
09/12/2008210067443Open ↗
▸Environmental & Asbestos20
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
08/17/2026X08053545-S2Open ↗
08/17/2026X08053545-S1Open ↗
08/17/2026X08053545-I1Open ↗
Showing 3 of 15 on file for this type
▸BISASBESTOS-WORK UNDET 1000 SQ FT (DEP ACP7)1
02/04/2013220001959Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/04/2013220335616Open ↗
▸BISASBESTOS INSPECTION REPORT1
04/16/2009220001959Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
09/12/2008210067443Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/18/2026X00882781-I1Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
04/01/2016220335616Open ↗
10/04/2013220335616Open ↗
▸Approvals, Objections & Sign-offs26
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter19
08/17/2026X08053545-P2Open ↗
08/17/2026X08053545-P1Open ↗
08/17/2026X08053545-S2Open ↗
Showing 3 of 19 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
07/29/2011220001959Open ↗
04/16/2009220001959Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
04/16/2009220001959Open ↗
09/12/2008210067443Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
02/04/2013220001959Open ↗
07/29/2011220001959Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026X00882781-I1Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
10/04/2013220335616Open ↗
07/29/2011220001959Open ↗
04/16/2009220001959Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION2
02/04/2013220001959Open ↗
09/12/2012220001959Open ↗
▸BISEFILING COVER SHEET2
10/04/2013220335616Open ↗
09/12/2008210067443Open ↗
▸Other Documents18
▸DOB NOWProof of Historic Building5
08/17/2026X08053545-I1Open ↗
08/17/2026X08053545-P1Open ↗
08/17/2026X08053545-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/17/2026X08053545-P1Open ↗
08/17/2026X08053545-I1Open ↗
08/17/2026X08053545-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial3
08/17/2026X08053545-P1Open ↗
08/17/2026X08053545-I1Open ↗
08/17/2026X08053545-P3Open ↗
▸DOB NOWPlot Diagram3
08/17/2026X08053545-P1Open ↗
08/17/2026X08053545-I1Open ↗
08/17/2026X08053545-P3Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026X01071995-I1Open ↗
▸DOB NOWCalculations1
08/13/2026X01071995-I1Open ↗