← Back
BuildNYC
Two stories - detached, small or mid-size
1186 LAKEWOOD PLACE
BRONX · BIN 2046804
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R3-1Zoning
1,480 sfGross Floor Area
1Units
Rent Stabilized3 Active Violations ▸FDNY Report ↗
Two stories - detached, small or mid-size · 5,885 sf lot · 0.25 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 20 docs
AtticUnder Construction37p · 1 filing · 20 docs
Floor 2Under Construction38p · 1 filing · 20 docs
Floor 1Under Construction37p · 1 filing · 20 docs
CellarUnder Construction18p · 1 filing · 20 docs
BasementUnder Construction21p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Standard General Construction1711/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/21/2023$900K—Private party → Private party$608/sf building
10/18/2016$625K—Private party → Private party$422/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Badaly Engineering611/20/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Dfe ContractorGeneral Contractor307/08/2026
C.R.U. Mechan & HeatingPlumbing211/14/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Badaly Architect7137511/20/2026
Building Lifecycle
11/20/2026
Filed — Alteration CO
PROVIDE PLUMBING SYSTEM FOR 2-1/2 RESIDENCE
X01046039-P5
11/13/2026
Permit renewed — Plumbing
Renewed without changes
X01046039-S1-PL
10/21/2026
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
X01046039-I1-GC
05/20/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/24/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
81 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedC.R.U. Mechan & Heating11/13/2026
DOB NOWGeneral ConstructionPermit IssuedDfe Contractor10/21/2025
DOB NOWGeneral ConstructionPermit IssuedDfe Contractor08/28/2025
DOB NOWPlumbingPermit IssuedC.R.U. Mechan & Heating05/29/2025
DOB NOWGeneral ConstructionPermit IssuedDfe Contractor11/29/2024
1 project · most recent 11/20/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
11/20/2026Permit IssuedC.R.U. Mechan & HeatingGas, Storm, Water/Sanitary
1 project · most recent 07/13/2026
General Wiring
FiledStatusContractorScope
07/13/2026Permit IssuedAttractive Lighting ElectricalGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
05/20/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/10/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
10/15/2025Permanent certificateSHAHIN BADALYenergy_progress
10/15/2025HVAC-R and service water heating equipmentSHAHIN BADALYenergy_progress
10/15/2025HVAC-R and service water heating system controlsSHAHIN BADALYenergy_progress
10/15/2025Energy Code Compliance InspectionsSHAHIN BADALYprogress
10/15/2025Fire-Resistant Penetrations and JointsSHAHIN BADALYspecial
10/15/2025Maintenance informationSHAHIN BADALYenergy_progress
10/15/2025HVAC-R and service water piping design and insulationSHAHIN BADALYenergy_progress
09/28/2025HVAC-R and service water heating system controlsSHAHIN BADALYenergy_progress
09/28/2025Maintenance informationSHAHIN BADALYenergy_progress
09/28/2025HVAC-R and service water heating equipmentSHAHIN BADALYenergy_progress
09/28/2025Energy Code Compliance InspectionsSHAHIN BADALYprogress
09/28/2025Fire-Resistant Penetrations and JointsSHAHIN BADALYspecial
09/28/2025HVAC-R and service water piping design and insulationSHAHIN BADALYenergy_progress
09/28/2025Permanent certificateSHAHIN BADALYenergy_progress
03/14/2025Permanent certificateSHAHIN BADALYenergy_progress
03/14/2025Electric vehicle service equipment requirementsSHAHIN BADALYenergy_progress
03/14/2025Insulation placement and R valuesSHAHIN BADALYenergy_progress
03/14/2025Maintenance informationSHAHIN BADALYenergy_progress
03/14/2025Fenestration areasSHAHIN BADALYenergy_progress
03/14/2025Interior lighting powerSHAHIN BADALYenergy_progress
03/14/2025Fenestration and door U-factor and product ratingsSHAHIN BADALYenergy_progress
03/14/2025Air barrier — testing SHAHIN BADALYenergy_progress
03/14/2025Air barrier - visual inspectionSHAHIN BADALYenergy_progress
03/14/2025Fenestration air leakageSHAHIN BADALYenergy_progress
03/14/2025Structural Stability – Alterations of existing buildingsSHAHIN BADALYspecial
Latest 25 of 45.
58 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account