← Back
Elevator apt, semi-fireproof without stores
1188 SHERIDAN AVENUE
BRONX · Concourse-Concourse Village · BIN 2002756
💬 Discuss this project
1941Year Built
6Stories
D1Building Class
R7-1Zoning
45,360 sfGross Floor Area
52Units
LL97 CoveredRent Stabilized93 Open Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: M 1188 SHERIDAN AVENUE · 10,500 sf lot · 4.32 FAR built · Flood zone X
Locations of Work
ArchitectureEquipmentGeneral
Floor 61p · 1 filing · 6 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Site & exterior4p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
M L REALTY203/21/2026
M 1188 SHERIDAN AVENUE103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PAUL PERDEK, PROF. ENG. PLLC105/16/2024
LEDER-LUIS ARCHITECTURAL DESIGN, PL112/29/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XPDITE GROUP LLC (104)103/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EMPIRE NY INSTALLATIONS INCGeneral Contractor607/02/2026
MSS GOLDEN EAGLE CONSTRUCGeneral Contractor107/08/2026
Building Lifecycle
All (70)Filed (2)Permit Issued (5)Violation (60)Special Inspection (3)
08/16/2026
Violation issued (HPD, open)
A
08/11/2026
Violation issued (HPD, open)
C
08/11/2026
Violation issued (HPD, open)
C
08/11/2026
Violation issued (HPD, open)
C
08/11/2026
Violation issued (HPD, open)
C
08/02/2026
Violation issued (HPD, open)
A
08/02/2026
Violation issued (HPD, open)
B
08/02/2026
Violation issued (HPD, open)
C
08/02/2026
Violation issued (HPD, open)
C
08/02/2026
Violation issued (HPD, open)
B
08/02/2026
Violation issued (HPD, open)
C
07/27/2026
Violation issued (HPD, closed)
C
07/27/2026
Violation issued (HPD, open)
C
07/27/2026
Violation issued (HPD, open)
B
07/10/2026
Violation issued (HPD, open)
B
07/10/2026
Violation issued (HPD, closed)
A
07/10/2026
Violation issued (HPD, open)
C
07/10/2026
Violation issued (HPD, open)
A
07/10/2026
Violation issued (HPD, open)
C
07/10/2026
Violation issued (HPD, closed)
B
07/10/2026
Violation issued (HPD, open)
C
07/10/2026
Violation issued (HPD, closed)
C
07/10/2026
Violation issued (HPD, closed)
C
07/10/2026
Violation issued (HPD, open)
B
06/30/2026
Permit issued — Sidewalk Shed
X01039543-I1-SH
05/22/2026
Violation issued (HPD, open)
A
05/22/2026
Violation issued (HPD, open)
C
05/22/2026
Violation issued (HPD, open)
C
05/22/2026
Violation issued (HPD, open)
A
05/22/2026
Violation issued (HPD, open)
B
05/22/2026
Violation issued (HPD, open)
A
05/22/2026
Violation issued (HPD, open)
C
05/22/2026
Violation issued (HPD, open)
A
05/22/2026
Violation issued (HPD, open)
A
05/22/2026
Violation issued (HPD, open)
A
03/23/2026
Permit issued — Sidewalk Shed
X01039543-I1-SH
02/04/2026
Violation issued (HPD, closed)
C
10/04/2025
Violation issued (HPD, closed)
C
10/04/2025
Violation issued (HPD, open)
C
10/04/2025
Violation issued (HPD, open)
C
10/04/2025
Violation issued (HPD, open)
B
10/04/2025
Violation issued (HPD, open)
B
10/04/2025
Violation issued (HPD, open)
B
10/04/2025
Violation issued (HPD, open)
B
10/04/2025
Violation issued (HPD, open)
B
10/04/2025
Violation issued (HPD, open)
B
10/04/2025
Violation issued (HPD, open)
B
10/04/2025
Violation issued (HPD, open)
B
10/04/2025
Violation issued (HPD, open)
B
10/04/2025
Violation issued (HPD, open)
B
10/04/2025
Violation issued (HPD, open)
A
10/04/2025
Violation issued (HPD, open)
B
10/04/2025
Violation issued (HPD, open)
A
10/04/2025
Violation issued (HPD, open)
B
10/04/2025
Violation issued (HPD, open)
A
10/01/2025
Violation issued (HPD, open)
B
10/01/2025
Violation issued (HPD, open)
C
10/01/2025
Violation issued (HPD, open)
C
10/01/2025
Violation issued (HPD, open)
B
10/01/2025
Violation issued (HPD, open)
B
Latest 60 of 70 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedEMPIRE NY INSTALLATIONS INC06/30/2026
DOB NOWSidewalk ShedPermit IssuedEMPIRE NY INSTALLATIONS I03/23/2026
DOB NOWSidewalk ShedPermit IssuedEMPIRE NY INSTALLATIONS I05/19/2025
DOB NOWSidewalk ShedPermit IssuedEMPIRE NY INSTALLATIONS I05/17/2024
DOB NOWGeneral ConstructionPermit IssuedMSS GOLDEN EAGLE CONSTRUC04/27/2022
BISEQISSUEDMSS CONSTRUCTION CORP.07/31/2003
BISPLISSUEDSILVANO PLG & HTG01/18/2000
BIS—ISSUEDJMM SHERIDAN INC & JOHN MILEVOI11/13/1998
BISFSISSUEDPETER AGLIARDO JR.01/05/1996
BISPLISSUEDR&A HEATING & CONTRG CO.I01/05/1996
2 projects · most recent 04/19/2024
General Wiring
FiledStatusContractorScope
04/19/2024Permit IssuedMEGA ELEC'L CONTR'G, INC—
04/11/2022Permit IssuedWTG ELECTRIC INC.General Wiring
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
12/01/2021Energy Code Compliance InspectionsFrank Caminitiprogress
12/01/2021Fire-Resistance Rated ConstructionFrank Caminitiprogress
12/01/2021Lighting in dwelling unitsFrank Caminitienergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/24/2026X00639922-I1Request digital key ↗
08/21/2026X01039543-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature3
08/28/2026X00639922-I1Open ↗
08/28/2026X00639922-I1Open ↗
08/28/2026X00639922-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/21/2026X01039543-I1Open ↗
08/13/2026X00639922-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026X00639922-I1Open ↗