← Back
Primarily 2 family with 1 store or office
1189 BAY STREET
STATEN ISLAND · BIN 5042132
💬 Discuss this project
1931Year Built
3Stories
S2Building Class
R4Zoning
3,000 sfGross Floor Area
3Units
2 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · 2,825 sf lot · 1.06 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 31p · 1 filing · 20 docs
Floor 23p · 2 filings · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar2p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THINK DESIGN ARCHITECTURE801/05/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SCALI CONSTRUCTION INCGeneral Contractor603/21/2026
PRO STAR PLBG,HTG&MECH INPlumbing307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THINK DESIGN ARCHITECTURA683101/05/2022
A TECH ENGINEERING NYC, P6738612/27/2021
Building Lifecycle
All (55)Filed (8)Permit Issued (5)Signed Off (4)Violation (7)Inspection (1)Special Inspection (30)
05/24/2022
Signed off — Alteration
Application filed for new installation of Hood system for interior alteration to existing restaurant at first floor. All work as per plans submitted herewith. No change in use, occupancy or egress under this application.
S00454388-I1
05/24/2022
Signed off — Alteration
Filed for replacement of plumbing fixtures associated with interior alteration to existing restaurant at first floor and cellar of a mixed use building. Also filed to remove boiler and hwh at 2nd and 3rd floors and install new combi boiler/hwh.
S00454186-I1
02/17/2022
Signed off — Alteration
FILED FOR THE REMOVAL OF EXISTING HWH/BOILERS & INSTALLATION OF COMBO HWH/BOILERS AT RESIDENTIAL FLOORS AS WELL AS INSTALLATION OF NEW BOILER AT CELLAR OF COMMERCIAL SPACE. ALL WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
S00654123-I1
01/26/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/20/2022
Permit issued — Boiler Equipment
S00654123-I1-BE
01/05/2022
Filed — Alteration
FILED FOR THE REMOVAL OF EXISTING HWH/BOILERS & INSTALLATION OF COMBO HWH/BOILERS AT RESIDENTIAL FLOORS AS WELL AS INSTALLATION OF NEW BOILER AT CELLAR OF COMMERCIAL SPACE. ALL WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
S00654123-I1
01/03/2022
Violation issued (HPD, open)
C
01/03/2022
Violation issued (HPD, closed)
C
01/03/2022
Violation issued (HPD, open)
C
12/28/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Frank Martarella III
12/28/2021
Special inspection requirement — Permanent certificate
Frank Martarella III
12/28/2021
Special inspection requirement — Maintenance information
Frank Martarella III
12/27/2021
Filed — Alteration
Filed for replacement of plumbing fixtures associated with interior alteration to existing restaurant at first floor and cellar of a mixed use building. Also filed to remove boiler and hwh at 2nd and 3rd floors and install new combi boiler/hwh.
S00454186-P4
12/27/2021
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
12/27/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
12/27/2021
Special inspection requirement — Energy Code Compliance
anthony santoro
12/27/2021
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
12/27/2021
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
12/27/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
12/27/2021
Special inspection requirement — Maintenance information
anthony santoro
12/08/2021
Signed off — Alteration
S00455729-I1
12/03/2021
Filed — Alteration
Filed for replacement of plumbing fixtures associated with interior alteration to existing restaurant at first floor and cellar of a mixed use building. Also filed to remove boiler and hwh at 2nd and 3rd floors and install new combi boiler/hwh.
S00454186-P3
12/02/2021
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
12/02/2021
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
12/02/2021
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
12/02/2021
Special inspection requirement — Energy Code Compliance
anthony santoro
12/02/2021
Special inspection requirement — Maintenance information
anthony santoro
12/02/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
12/02/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
10/12/2021
Filed — Alteration
Filed for replacement of plumbing fixtures associated with interior alteration to existing restaurant at first floor and cellar of a mixed use building. Also filed to remove boiler and hwh at 2nd and 3rd floors and install new combi boiler/hwh.
S00454186-P2
10/11/2021
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
10/11/2021
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
10/11/2021
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
10/11/2021
Special inspection requirement — Maintenance information
anthony santoro
10/11/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
10/11/2021
Special inspection requirement — Energy Code Compliance
anthony santoro
10/11/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
09/16/2021
Filed — Alteration
Filed for replacement of plumbing fixtures associated with interior alteration to existing restaurant at first floor and cellar of a mixed use building. Also filed to remove boiler and hwh at 2nd and 3rd floors and install new combi boiler/hwh.
S00454186-P1
09/15/2021
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
09/15/2021
Special inspection requirement — Maintenance information
anthony santoro
09/15/2021
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
09/15/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
09/15/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
09/15/2021
Special inspection requirement — Energy Code Compliance
anthony santoro
08/17/2021
Permit issued — Construction Fence
S00455729-I1-FN
08/17/2021
Permit issued — Mechanical Systems
S00454388-I1-MS
07/19/2021
Permit issued — Plumbing
S00454186-I1-PL
04/23/2021
Permit issued — Plumbing
S00454186-I1-PL
02/02/2021
Filed — Alteration
Application filed for new installation of Hood system for interior alteration to existing restaurant at first floor. All work as per plans submitted herewith. No change in use, occupancy or egress under this application.
S00454388-I1
02/02/2021
Filed — Alteration
Filed for replacement of plumbing fixtures associated with interior alteration to existing restaurant at first floor and cellar of a mixed use building. Also filed to remove boiler and hwh at 2nd and 3rd floors and install new combi boiler/hwh.
S00454186-I1
01/26/2021
Filed — Alteration
S00455729-I1
11/19/2020
Violation issued (FDNY_ORDER, closed)
11/19/2020
Violation issued (FDNY_ORDER, closed)
02/27/2020
Violation issued (FDNY_NOV, closed)
02/06/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offPRO STAR PLBG,HTG&MECH IN01/20/2022
DOB NOWConstruction FenceSigned-offSCALI CONSTRUCTION INC08/17/2021
DOB NOWMechanical SystemsSigned-offSCALI CONSTRUCTION INC08/17/2021
DOB NOWPlumbingSigned-offPRO STAR PLBG,HTG&MECH IN07/19/2021
DOB NOWPlumbingSigned-offPRO STAR PLBG,HTG&MECH IN04/23/2021
BISOTISSUEDSCALI CONSTRUCTION INC07/20/2021
BISOTISSUEDRIDGE CONTRACTING CORP03/26/2021
BISFPISSUEDALLIED FIRE CONTROL12/12/2005
BISFPISSUEDMETFLOW FIRE CONTROL LLC11/23/1993
1 project · most recent 04/22/2021
General Wiring
FiledStatusContractorScope
04/22/2021CompleteFICHERA ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
01/26/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
12/28/2021Fire-Resistant Penetrations and JointsFrank Martarella IIIspecial
12/28/2021Permanent certificateFrank Martarella IIIenergy_progress
12/28/2021Maintenance informationFrank Martarella IIIenergy_progress
12/27/2021Energy Code Compliance Inspectionsanthony santoroprogress
12/27/2021Fire-Resistant Penetrations and Jointsanthony santorospecial
12/27/2021Energy Code Complianceanthony santoroprogress
12/27/2021HVAC-R and service water heating system controlsanthony santoroenergy_progress
12/27/2021HVAC-R and service water heating equipmentanthony santoroenergy_progress
12/27/2021HVAC-R and service water piping design and insulationanthony santoroenergy_progress
12/27/2021Maintenance informationanthony santoroenergy_progress
12/02/2021HVAC-R and service water heating equipmentanthony santoroenergy_progress
12/02/2021HVAC-R and service water heating system controlsanthony santoroenergy_progress
12/02/2021Energy Code Compliance Inspectionsanthony santoroprogress
12/02/2021Energy Code Complianceanthony santoroprogress
12/02/2021Maintenance informationanthony santoroenergy_progress
12/02/2021Fire-Resistant Penetrations and Jointsanthony santorospecial
12/02/2021HVAC-R and service water piping design and insulationanthony santoroenergy_progress
10/11/2021Energy Code Compliance Inspectionsanthony santoroprogress
10/11/2021HVAC-R and service water heating system controlsanthony santoroenergy_progress
10/11/2021HVAC-R and service water heating equipmentanthony santoroenergy_progress
10/11/2021Maintenance informationanthony santoroenergy_progress
10/11/2021Fire-Resistant Penetrations and Jointsanthony santorospecial
10/11/2021Energy Code Complianceanthony santoroprogress
10/11/2021HVAC-R and service water piping design and insulationanthony santoroenergy_progress
09/15/2021HVAC-R and service water heating equipmentanthony santoroenergy_progress
Latest 25 of 31.
▾Documents — 91 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch - Plumbing5
08/25/2026S00454186-P3Request digital key ↗
08/25/2026S00454186-I1Request digital key ↗
08/25/2026S00454186-P4Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch1
08/24/2026S00654123-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/25/2026S00454388-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/25/2026S00455729-I1Request digital key ↗
▸Applications & Permits14
▸BISPLAN / WORK APPROVAL APPLICATION10
11/14/2022500077016Open ↗
09/27/2022500810544Open ↗
09/27/2022500077016Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
09/27/2022500077016Open ↗
09/27/2022500810544Open ↗
▸BISWORK PERMIT APPLICATION2
07/20/2021540188777Open ↗
03/26/2021540188777Open ↗
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature13
09/23/2026S00654123-I1Open ↗
09/01/2026S00454186-I1Open ↗
09/01/2026S00454186-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/25/2026S00455729-I1Open ↗
08/13/2026S00454186-P2Open ↗
08/13/2026S00454388-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026S00654123-I1Open ↗
09/01/2026S00454186-I1Open ↗
08/31/2026S00454186-P1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/27/2020540188777Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/27/2020540188777Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/27/2020540188777Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
10/27/2020540188777Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/13/2026S00454388-I1Open ↗
08/13/2026S00454186-P4Open ↗
08/13/2026S00454186-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/27/2020540188777Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
05/24/2022540188777Open ↗
04/28/2022540188777Open ↗
04/07/2022540188777Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026S00454186-I1Open ↗
08/13/2026S00454388-I1Open ↗
08/13/2026S00654123-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/24/2022540188777Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/27/2020540188777Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/07/2022540188777Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026S00654123-I1Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY5
05/24/2022540188777Open ↗
04/28/2022540188777Open ↗
04/07/2022540188777Open ↗
Showing 3 of 5 on file for this type
▸BISDOB FINAL INSPECTION REQUIRED1
04/28/2022540188777Open ↗
▸Approvals, Objections & Sign-offs6
▸BISLetter from Homeowner for Withdrawal3
11/14/2022500077016Open ↗
09/27/2022500077016Open ↗
09/27/2022500810544Open ↗
▸BISSUPERSEDING LETTER2
07/20/2021540188777Open ↗
07/20/2021540188777Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
08/30/2022540188777Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
10/27/2020540188777Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
08/29/2022540188777Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION3
04/08/2022540188777Open ↗
12/06/2021540188777Open ↗
09/15/2021540188777Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/27/2020540188777Open ↗
▸BISBOROUGH INTAKE FORM1
07/20/2021540188777Open ↗