← Back
BuildNYC
Two family frame
119-07 LIBERTY AVENUE
QUEENS · South Ozone Park · BIN 4203738
💬 Discuss this project
1915Year Built
2.5Stories
B2Building Class
R4-1Zoning
2,754 sfGross Floor Area
2Units
3 Active Violations 0 unresolved · 3 paperwork only ▸FDNY Report ↗
Two family frame · 2,602 sf lot · 1.06 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 21p · 1 filing · 5 docs
Floor 11p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
M&P Liberty Ave303/22/2026
Owner of 119-07 Liberty A103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/11/2024$2.6M—B & D REALTY ASSOCIATES LLC → M&P LIBERTY AVE LLC$944/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Solanki Engineering106/04/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
R&R Contracting ManagementGeneral Contractor303/21/2026
KeybuildersGeneral Contractor203/21/2026
R.M.F. ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Solanki Engineering8451106/04/2024
Building Lifecycle
10/30/2025
Closed: Structure rendered non compliant due to compromised fire rating. At time of inspection the scuttle in the staircase was damaged exposing the inner…
DOB violation · closed on the city's record
10/18/2025
Structure rendered non compliant due to compromised fire rating. At time of inspection the scuttle in the staircase was damaged exposing the inner…
DOB violation · closed
12/13/2024
I observed in the basement the water ground clamp is deuterated, rusted broken and is not secured to the main water pipe., provide grounding
ECB violation · closed
12/13/2024
I observed inside the top floor apartment new installation of a 100AMP panel box with circuit breakers. No application on file with d.o.b. And…
ECB violation · open
12/13/2024
I observe throughout the entire basement open boxes, exposed unprotected wires, unsecured wires, unsecured boxes and ungrounded and not continuous…
ECB violation · open
23 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offR&R Contracting Management10/23/2024
DOB NOWStructuralSigned-offKeybuilders10/04/2024
BIS—ISSUEDFive Town Neon Sign Co07/31/2009
BISPLISSUEDStarr Mechanical07/09/2009
BISMHISSUEDAll-Rite Construction Co06/30/2009
2 projects · most recent 02/06/2025
General Wiring
FiledStatusContractorScope
02/06/2025Permit IssuedAscuatech ElectricalGeneral Wiring
06/18/2024CompleteAscuatech ElectricalGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/30/2024Structural Stability – Alterations of existing buildingsAshray Solankispecial
05/30/2024Fire-Resistant Penetrations and JointsAshray Solankispecial
05/30/2024FinalAshray Solankiprogress
05/30/2024Fire-Resistance Rated ConstructionAshray Solankiprogress
05/30/2024Structural Wood FrameAshray Solankiprogress
45 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account