← Back
Primarily 2 family with 1 store or office
119-08 LIBERTY AVENUE
QUEENS · South Ozone Park · BIN 4204237
💬 Discuss this project
1930Year Built
2Stories
S2Building Class
R6AZoning
2,930 sfGross Floor Area
3Units
6 Open Violations 4 unresolved · 2 paperwork only ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: LIBERTY 2626 LLC · 2,317 sf lot · 1.26 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 24p · 1 filing · 20 docs
Floor 13p · 2 filings · 20 docs
Cellar6p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2690 JAMAICA3207/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BUILDING ENGINEERING SYSTEMS PLLC1111/05/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BUILDING ENGINEERING SYSTEM2203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KINGS 26 CONSTRUCTION LLCGeneral Contractor603/21/2026
ATN ELECTRIC CORPElectrical303/22/2026
PIPESTYLISTS, INCPlumbing207/08/2026
CAM ENERGY HEATING AND MEPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALL STATE PROPERTY INSPEC42881111/05/2021
Building Lifecycle
All (70)Filed (11)Permit Issued (5)Signed Off (4)Violation (19)Inspection (1)Special Inspection (30)
04/13/2026
Violation issued (FDNY_ORDER, closed)
04/13/2026
Violation issued (FDNY_ORDER, closed)
04/13/2026
Violation issued (FDNY_NOV, closed)
04/13/2026
Violation issued (FDNY_ORDER, closed)
04/13/2026
Violation issued (FDNY_ORDER, closed)
10/14/2024
Violation issued (HPD, open)
B
03/22/2024
Violation issued (ECB, closed)
Construction
03/22/2024
Violation issued (ECB, closed)
Construction
06/23/2022
Signed off — Alteration
Q00401024-I1
06/23/2022
Signed off — Alteration
APPLICATION BEING FILED TO INSTALL 2 NEW RES HWH, 2 NEW RES BOILERS (LESS THAN 350K BTU/HR), 1 NEW 1" RPZA AND 1 NEW 1" WATER MTR AT CELLAR, AND TO REPLACE 2 TOILETS, 2 LAVATORIES, 2 BATHTUBS, 2 STOVES AND 2 KITCHEN SINKS ON EXISTING ROUGHING AT 2ND FLR
Q00564841-S1
06/23/2022
Signed off — Alteration
APPLICATION BEING FILED TO BUILT A NEW BOILER ROOM AT CELLAR FLOOR. AND TO COMPLETELY RENOVATE TWO APARTMENTS AT SECOND FLOOR.
Q00564839-I1
03/09/2022
Violation issued (HPD, open)
B
12/06/2021
Signed off — Alteration
Q00480961-I1
11/05/2021
Filed — Alteration
Q00401024-P3
11/04/2021
Special inspection requirement — Energy Code Compliance Inspections
SEBERT DYER
11/04/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBERT DYER
10/06/2021
Special inspection requirement — Energy Code Compliance Inspections
SEBERT DYER
10/06/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBERT DYER
10/06/2021
Special inspection requirement — Maintenance information
SEBERT DYER
10/05/2021
Filed — Alteration
APPLICATION BEING FILED TO INSTALL 2 NEW RES HWH, 2 NEW RES BOILERS (LESS THAN 350K BTU/HR), 1 NEW 1" RPZA AND 1 NEW 1" WATER MTR AT CELLAR, AND TO REPLACE 2 TOILETS, 2 LAVATORIES, 2 BATHTUBS, 2 STOVES AND 2 KITCHEN SINKS ON EXISTING ROUGHING AT 2ND FLR
Q00564841-P3
10/04/2021
Special inspection requirement — Maintenance information
SEBERT DYER
10/04/2021
Special inspection requirement — Energy Code Compliance Inspections
SEBERT DYER
10/04/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBERT DYER
09/15/2021
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/10/2021
Permit issued — Boiler Equipment
Q00564841-S1-BE
09/03/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
SEBERT DYER
09/03/2021
Special inspection requirement — Fenestration areas
SEBERT DYER
09/03/2021
Special inspection requirement — Fenestration air leakage
SEBERT DYER
09/03/2021
Special inspection requirement — Lighting in dwelling units
SEBERT DYER
09/03/2021
Special inspection requirement — Final
SEBERT DYER
09/03/2021
Special inspection requirement — Fire-Resistance Rated Construction
SEBERT DYER
09/03/2021
Special inspection requirement — Energy Code Compliance Inspections
SEBERT DYER
09/03/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBERT DYER
09/03/2021
Special inspection requirement — Air barrier - visual inspection
SEBERT DYER
09/02/2021
Filed — Alteration
APPLICATION BEING FILED TO INSTALL 2 NEW RES HWH, 2 NEW RES BOILERS (LESS THAN 350K BTU/HR), 1 NEW 1" RPZA AND 1 NEW 1" WATER MTR AT CELLAR, AND TO REPLACE 2 TOILETS, 2 LAVATORIES, 2 BATHTUBS, 2 STOVES AND 2 KITCHEN SINKS ON EXISTING ROUGHING AT 2ND FLR
Q00564841-S1
09/01/2021
Filed — Alteration
APPLICATION BEING FILED TO INSTALL 2 NEW RES HWH, 2 NEW RES BOILERS (LESS THAN 350K BTU/HR), 1 NEW 1" RPZA AND 1 NEW 1" WATER MTR AT CELLAR, AND TO REPLACE 2 TOILETS, 2 LAVATORIES, 2 BATHTUBS, 2 STOVES AND 2 KITCHEN SINKS ON EXISTING ROUGHING AT 2ND FLR
Q00564841-P1
09/01/2021
Filed — Alteration
APPLICATION BEING FILED TO BUILT A NEW BOILER ROOM AT CELLAR FLOOR. AND TO COMPLETELY RENOVATE TWO APARTMENTS AT SECOND FLOOR.
Q00564839-P1
09/01/2021
Special inspection requirement — HVAC-R and service water heating equipment
SEBERT DYER
09/01/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBERT DYER
09/01/2021
Special inspection requirement — Energy Code Compliance Inspections
SEBERT DYER
09/01/2021
Special inspection requirement — Final
SEBERT DYER
09/01/2021
Special inspection requirement — Fire-Resistance Rated Construction
SEBERT DYER
09/01/2021
Special inspection requirement — Fenestration areas
SEBERT DYER
09/01/2021
Special inspection requirement — Lighting in dwelling units
SEBERT DYER
09/01/2021
Special inspection requirement — Fenestration air leakage
SEBERT DYER
09/01/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
SEBERT DYER
09/01/2021
Special inspection requirement — Air barrier - visual inspection
SEBERT DYER
09/01/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBERT DYER
09/01/2021
Special inspection requirement — Heating Systems
SEBERT DYER
09/01/2021
Special inspection requirement — Maintenance information
SEBERT DYER
08/05/2021
Permit issued — General Construction
Q00564839-I1-GC
07/29/2021
Filed — Alteration
APPLICATION BEING FILED TO BUILT A NEW BOILER ROOM AT CELLAR FLOOR. AND TO COMPLETELY RENOVATE TWO APARTMENTS AT SECOND FLOOR.
Q00564839-I1
07/29/2021
Filed — Alteration
APPLICATION BEING FILED TO INSTALL 2 NEW RES HWH, 2 NEW RES BOILERS (LESS THAN 350K BTU/HR), 1 NEW 1" RPZA AND 1 NEW 1" WATER MTR AT CELLAR, AND TO REPLACE 2 TOILETS, 2 LAVATORIES, 2 BATHTUBS, 2 STOVES AND 2 KITCHEN SINKS ON EXISTING ROUGHING AT 2ND FLR
Q00564841-I1
06/24/2021
Permit issued — Plumbing
Q00401024-I1-PL
06/17/2021
Filed — Alteration
Q00401024-P2
05/19/2021
Permit issued — Mechanical Systems
Q00480961-I1-MS
05/06/2021
Filed — Alteration
Q00401024-P1
05/05/2021
Filed — Alteration
Q00480961-I1
02/17/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/17/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 70 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offT & T PLUMBING INC09/10/2021
DOB NOWGeneral ConstructionSigned-offKINGS 26 CONSTRUCTION LLC08/05/2021
DOB NOWPlumbingSigned-offT & T PLUMBING INC06/24/2021
DOB NOWMechanical SystemsSigned-offKINGS 26 CONSTRUCTION LLC05/19/2021
DOB NOWPlumbingSigned-offCAM ENERGY HEATING AND ME12/22/2020
BISOTISSUEDKINGS 26 CONSTRUCTION LLC07/07/2021
BISOTISSUEDKINGS 26 CONSTRUCTION LLC10/26/2020
1 project · most recent 10/05/2021
Gas Water/Sanitary
FiledStatusContractorScope
10/05/2021Signed-offPIPESTYLISTS, INCGas, Water/Sanitary
2 projects · most recent 11/30/2021
General Wiring
FiledStatusContractorScope
11/30/2021CompleteATN ELECTRIC CORPGeneral Wiring
09/01/2021CompleteATN ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
09/15/2021Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
11/04/2021Energy Code Compliance InspectionsSEBERT DYERprogress
11/04/2021Fire-Resistant Penetrations and JointsSEBERT DYERspecial
10/06/2021Energy Code Compliance InspectionsSEBERT DYERprogress
10/06/2021Fire-Resistant Penetrations and JointsSEBERT DYERspecial
10/06/2021Maintenance informationSEBERT DYERenergy_progress
10/04/2021Maintenance informationSEBERT DYERenergy_progress
10/04/2021Energy Code Compliance InspectionsSEBERT DYERprogress
10/04/2021Fire-Resistant Penetrations and JointsSEBERT DYERspecial
09/03/2021Fenestration and door U-factor and product ratingsSEBERT DYERenergy_progress
09/03/2021Fenestration areasSEBERT DYERenergy_progress
09/03/2021Fenestration air leakageSEBERT DYERenergy_progress
09/03/2021Lighting in dwelling unitsSEBERT DYERenergy_progress
09/03/2021FinalSEBERT DYERprogress
09/03/2021Fire-Resistance Rated ConstructionSEBERT DYERprogress
09/03/2021Energy Code Compliance InspectionsSEBERT DYERprogress
09/03/2021Fire-Resistant Penetrations and JointsSEBERT DYERspecial
09/03/2021Air barrier - visual inspectionSEBERT DYERenergy_progress
09/01/2021HVAC-R and service water heating equipmentSEBERT DYERenergy_progress
09/01/2021Fire-Resistant Penetrations and JointsSEBERT DYERspecial
09/01/2021Energy Code Compliance InspectionsSEBERT DYERprogress
09/01/2021FinalSEBERT DYERprogress
09/01/2021Fire-Resistance Rated ConstructionSEBERT DYERprogress
09/01/2021Fenestration areasSEBERT DYERenergy_progress
09/01/2021Lighting in dwelling unitsSEBERT DYERenergy_progress
09/01/2021Fenestration air leakageSEBERT DYERenergy_progress
Latest 25 of 37.
▾Documents — 96 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch7
08/27/2026Q00480961-I1Request digital key ↗
08/27/2026Q00564841-I1Request digital key ↗
08/27/2026Q00564841-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
08/27/2026Q00401024-I1Request digital key ↗
08/15/2026Q00401024-P2Request digital key ↗
08/15/2026Q00401024-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION3
07/19/2021440635877Open ↗
06/21/2021440635877Open ↗
10/16/2020440635877Open ↗
▸BISWORK PERMIT APPLICATION1
10/26/2020440635877Open ↗
▸Seals & Professional Certifications48
▸DOB NOWProgress Inspector Seal & Signature26
09/28/2026Q00564839-I1Open ↗
09/28/2026Q00564839-I1Open ↗
09/28/2026Q00564839-I1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/27/2026Q00401024-P2Open ↗
08/27/2026Q00401024-P1Open ↗
08/27/2026Q00401024-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/28/2026Q00564839-I1Open ↗
09/23/2026Q00564841-S1Open ↗
09/23/2026Q00564841-S1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/16/2020440635877Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/16/2020440635877Open ↗
▸Safety & Tenant Protection5
▸DOB NOWTenant Protection Plan4
08/27/2026Q00401024-P2Open ↗
08/27/2026Q00401024-P1Open ↗
08/27/2026Q00401024-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES1
12/03/2020440635877Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/27/2026Q00401024-P1Open ↗
08/27/2026Q00401024-I1Open ↗
08/27/2026Q00401024-P2Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/16/2020440635877Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
06/29/2022440635877Open ↗
10/26/2020440635877Open ↗
10/16/2020440635877Open ↗
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026Q00480961-I1Open ↗
08/13/2026Q00564841-S1Open ↗
08/13/2026Q00564839-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/29/2022440635877Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
06/29/2022440635877Open ↗
10/26/2020440635877Open ↗
10/16/2020440635877Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/30/2022440635877Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
06/29/2022440635877Open ↗
10/16/2020440635877Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
06/30/2022440635877Open ↗
12/03/2020440635877Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/16/2020440635877Open ↗