← Back
Primarily 2 family with 1 store or office
119-10 94 AVENUE
QUEENS · BIN 4199133
💬 Discuss this project
1910Year Built
3Stories
S2Building Class
R5Zoning
4,720 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: E AND A GHOTRA LLC · 1,800 sf lot · 2.62 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 21p · 1 filing · 12 docs
Floor 1
Cellar1p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KAPOOR REAL ESTATE1907/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/10/2024$990K—— → —$210/sf building
03/09/2022$860K—Private party → KAPOOR REAL ESTATE LLC$182/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCHITECTURAL CONCEPT503/06/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHITECTUAL CONCEPT803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRIME CONSTRUCTION NEW YOGeneral Contractor407/08/2026
TOPLINE NYC INCGeneral Contractor303/21/2026
WATSON'S PLBG, HTG, & BDGPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARCHITECTURAL CONCEPT3642302/16/2024
Building Lifecycle
All (76)Filed (5)Permit Issued (5)Signed Off (4)Violation (33)Inspection (7)Objection (10)Special Inspection (12)
11/25/2025
Violation issued (HPD, closed)
I
06/10/2025
Signed off — Alteration
INTERIOR RENOVATION AND ALTERATION OF EXISTING BUILDING TO REPLACE FIRE DAMAGE FLOOR, CEILING, PARTITION AND PLUMBING FIXTURES AS PER DRAWINGS. REPLACE FIRE DAMAGE WOOD JOISTS AND ROOF RAFTERS TO STABILIZE STRUCTURE.
Q00708960-I1
06/09/2025
Permit issued — General Construction
Q00708960-I1-MS
03/05/2025
Signed off — Alteration
Application field to remove a commercial boiler from the cellar. New wall-mounted combination boilers have been installed for existing dwellings on the 2nd and 3rd floors under separate application.
Q00708962-I1
12/05/2024
Violation issued (HPD, closed)
I
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/27/2024
Signed off — Alteration
Application field to remove a commercial boiler from the cellar. New wall-mounted combination boilers have been installed for existing dwellings on the 2nd and 3rd floors under separate application.
Q00708962-S1
06/27/2024
Signed off — Alteration
Q00708961-I1
05/14/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/24/2024
Permit issued — Boiler Equipment
Q00708962-S1-BE
03/06/2024
Filed — Alteration
Application field to remove a commercial boiler from the cellar. New wall-mounted combination boilers have been installed for existing dwellings on the 2nd and 3rd floors under separate application.
Q00708962-S1
02/16/2024
Filed — Alteration
Application field to remove a commercial boiler from the cellar. New wall-mounted combination boilers have been installed for existing dwellings on the 2nd and 3rd floors under separate application.
Q00708962-P1
02/16/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MUZAFFAR JAMAL
02/16/2024
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
02/16/2024
Special inspection requirement — Permanent certificate
MUZAFFAR JAMAL
02/16/2024
Special inspection requirement — HVAC-R and service water heating system controls
MUZAFFAR JAMAL
02/16/2024
Special inspection requirement — HVAC-R and service water heating equipment
MUZAFFAR JAMAL
02/16/2024
Special inspection requirement — Maintenance information
MUZAFFAR JAMAL
02/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
01/18/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/29/2023
Violation issued (HPD, closed)
I
09/07/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/24/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/19/2023
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/20/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/20/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/18/2022
Violation issued (HPD, closed)
I
11/14/2022
Permit issued — Plumbing
Q00708962-I1-PL
11/02/2022
Filed — Alteration
Application field to remove a commercial boiler from the cellar. New wall-mounted combination boilers have been installed for existing dwellings on the 2nd and 3rd floors under separate application.
Q00708962-I1
10/05/2022
Permit issued — Mechanical Systems
Q00708960-I1-GC
09/14/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/16/2022
Permit issued — Construction Fence
Q00708961-I1-FN
04/28/2022
Objection raised — Inspections
04/28/2022
Objection resolved — Addressed
04/21/2022
Filed — Alteration
Q00708961-I1
04/09/2022
Objection raised — Energy
04/09/2022
Objection resolved — Addressed
04/09/2022
Objection raised — Other
04/09/2022
Objection resolved — Addressed
04/09/2022
Objection raised — Other
04/09/2022
Objection resolved — Addressed
04/09/2022
Objection raised — Scope
04/09/2022
Objection resolved — Addressed
04/08/2022
Filed — Alteration
INTERIOR RENOVATION AND ALTERATION OF EXISTING BUILDING TO REPLACE FIRE DAMAGE FLOOR, CEILING, PARTITION AND PLUMBING FIXTURES AS PER DRAWINGS. REPLACE FIRE DAMAGE WOOD JOISTS AND ROOF RAFTERS TO STABILIZE STRUCTURE.
Q00708960-I1
04/07/2022
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
04/07/2022
Special inspection requirement — Fire-Resistance Rated Construction
MUZAFFAR JAMAL
04/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
03/30/2022
Special inspection requirement — Mechanical Systems
MUZAFFAR JAMAL
03/30/2022
Special inspection requirement — Final
TARIQ SIDDIQUI
03/17/2022
Violation issued (HPD, closed)
I
04/29/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/21/2021
Violation issued (HPD, closed)
I
12/20/2018
Violation issued (HPD, closed)
B
12/20/2018
Violation issued (HPD, closed)
B
12/20/2018
Violation issued (HPD, closed)
B
Latest 60 of 76 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offTOPLINE NYC INC06/09/2025
DOB NOWBoiler EquipmentSigned-offWATSON'S PLBG, HTG, & BDG04/24/2024
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG11/14/2022
DOB NOWMechanical SystemsSigned-offPRIME CONSTRUCTION NEW YO10/05/2022
DOB NOWConstruction FenceSigned-offPRIME CONSTRUCTION NEW YO05/16/2022
BISOTISSUEDUS REGAL CONTRACTORS INC05/14/2012
1 job · most recent 12/02/2022
General Wiring
FiledStatusContractorScope
12/02/2022CompleteRICHARD NEUGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
05/14/2024Pass-Final Boiler Equipment InspectionPassView ↗
01/18/2024Pass-Final General Construction Non-Directive 14PassView ↗
09/07/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/24/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/19/2023No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
12/20/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/20/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
02/16/2024HVAC-R and service water piping design and insulationMUZAFFAR JAMALenergy_progress
02/16/2024Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
02/16/2024Permanent certificateMUZAFFAR JAMALenergy_progress
02/16/2024HVAC-R and service water heating system controlsMUZAFFAR JAMALenergy_progress
02/16/2024HVAC-R and service water heating equipmentMUZAFFAR JAMALenergy_progress
02/16/2024Maintenance informationMUZAFFAR JAMALenergy_progress
02/16/2024Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
04/07/2022Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
04/07/2022Fire-Resistance Rated ConstructionMUZAFFAR JAMALprogress
04/07/2022Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
03/30/2022Mechanical SystemsMUZAFFAR JAMALspecial
03/30/2022FinalTARIQ SIDDIQUIprogress
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/26/2026Q00708961-I1Request digital key ↗
08/25/2026Q00708962-P1Request digital key ↗
08/25/2026Q00708962-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
03/21/2012420546136Open ↗
▸BISWORK PERMIT APPLICATION1
05/16/2012420546136Open ↗
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/26/2026Q00708961-I1Open ↗
08/25/2026Q00708962-I1Open ↗
08/13/2026Q00708962-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026Q00708962-P1Open ↗
09/01/2026Q00708962-P1Open ↗
08/25/2026Q00708960-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026Q00708962-P1Open ↗
08/25/2026Q00708960-I1Open ↗
08/25/2026Q00708960-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/21/2012420546136Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
03/21/2012420546136Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
03/21/2012420546136Open ↗
▸Safety & Tenant Protection1
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
05/10/2012420546136Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/25/2026Q00708962-I1Open ↗
08/13/2026Q00708960-I1Open ↗
08/13/2026Q00708962-S1Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/21/2012420546136Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY1
03/21/2012420546136Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/10/2012420546136Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/21/2012420546136Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
03/21/2012420546136Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
03/21/2012420546136Open ↗