2 Open Violations 0 unresolved · 2 paperwork only▸
ECB10/13/2010WORK W/O PERMIT.WORK NOTED:@ EXPOSURE #1,3,4 (FRONT,SIDE,REAR)THE INSTALLED NEW CONCRETE FLR OVER 200SQUARE FT W/O OBTAIN PERMIT & W/O INSTALLED DRYWALL.REMEDY:OBTAIN PERMIT.Nothing owed — awaiting certificate of correction
ECB10/13/2010FAILRUE TO MAINTAIN STORM DRAINAGE.NOTED:OBSERVED @ TIME OF INSPECTION THE ROOF LEADERS @ EXPOSURE#3 & 4 WAS NOT CONNECTED W/ DRYER OR SEWER LINE & DRAIN THE STORM WATER IN TO SIDE WALK.CONNECTED LEADER TO DRYWNothing owed — awaiting certificate of correction
Two family converted from one family · 2,500 sf lot · 0.48 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.