← Back
Two family converted from one family
119-15 193 STREET
QUEENS · St. Albans · BIN 4272632
💬 Discuss this project
1930Year Built
2Stories
B3Building Class
R3AZoning
2,396 sfGross Floor Area
2Units
20 Open Violations ▸FDNY Report ↗
Two family converted from one family · Owner of record: NIA NY LLC · 4,000 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Floor 27p · 1 filing · 15 docs
Floor 17p · 1 filing · 15 docs
Cellar8p · 1 filing · 15 docs
Site & exterior1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
THFC REALTY1007/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/11/2022$1.2M—FIRST HOME SOLUTION 18 INC → NIA NY LLC$490/sf building
09/10/2020$300K—Private party → FIRST HOME SOLUTION 18 INC$125/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
J.K.DESIGN309/09/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EAST ENDERS NYC INCGeneral Contractor303/21/2026
ALL PRO PLBG & HTG INCPlumbing207/08/2026
ISLAND ELECTRIC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781209/09/2021
TRIANGLE INSPECTION & TES7495209/09/2021
Building Lifecycle
All (45)Filed (3)Permit Issued (3)Signed Off (2)Violation (23)Inspection (5)Special Inspection (9)
08/31/2026
Violation issued (HPD, open)
B
08/31/2026
Violation issued (HPD, open)
B
08/31/2026
Violation issued (HPD, open)
B
08/31/2026
Violation issued (HPD, open)
B
08/31/2026
Violation issued (HPD, open)
A
08/31/2026
Violation issued (HPD, open)
B
08/31/2026
Violation issued (HPD, open)
B
08/31/2026
Violation issued (HPD, open)
B
11/11/2025
Violation issued (HPD, open)
B
11/11/2025
Violation issued (HPD, open)
B
11/11/2025
Violation issued (HPD, open)
B
11/11/2025
Violation issued (HPD, open)
B
11/11/2025
Violation issued (HPD, open)
B
11/11/2025
Violation issued (HPD, open)
B
11/11/2025
Violation issued (HPD, open)
B
12/23/2024
Violation issued (HPD, open)
C
12/23/2024
Violation issued (HPD, open)
C
12/19/2024
Violation issued (HPD, open)
I
12/18/2024
Violation issued (HPD, open)
B
12/18/2024
Violation issued (HPD, open)
C
02/08/2022
Signed off — Alteration
Installation of new temporary construction fence.
Q00402305-I1
02/08/2022
Signed off — Alteration
Installation of new gas fired equipment,and plumbing fixtures for the renovation and conversion of the existing one family dwelling into a two family dwelling. Filed in conjunction with ALT I app# 440654640.
Q00465158-I1
09/30/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/15/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/15/2021
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/15/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/15/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/13/2021
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
09/13/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
CHRISTIAN LOZADA
09/13/2021
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
09/13/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
09/13/2021
Special inspection requirement — Energy Code Compliance
CHRISTIAN LOZADA
09/13/2021
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
09/13/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
09/13/2021
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
09/09/2021
Filed — Alteration
Installation of new gas fired equipment,and plumbing fixtures for the renovation and conversion of the existing one family dwelling into a two family dwelling. Filed in conjunction with ALT I app# 440654640.
Q00465158-P1
06/24/2021
Violation issued (ECB, closed)
Construction
06/11/2021
Permit issued — Plumbing
Q00465158-I1-PL
05/13/2021
Permit issued — Plumbing
Q00465158-I1-PL
02/08/2021
Filed — Alteration
Installation of new gas fired equipment,and plumbing fixtures for the renovation and conversion of the existing one family dwelling into a two family dwelling. Filed in conjunction with ALT I app# 440654640.
Q00465158-I1
10/23/2020
Permit issued — Construction Fence
Q00402305-I1-FN
09/24/2020
Filed — Alteration
Installation of new temporary construction fence.
Q00402305-I1
09/21/2020
Special inspection requirement — Final
jacob Kanner
02/02/2012
Violation issued (ECB, closed)
Construction
02/02/2012
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC06/11/2021
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC05/13/2021
DOB NOWConstruction FenceSigned-offEAST ENDERS NYC INC10/23/2020
BISOTISSUEDPRO CUSTOM SOLAR LLC08/31/2022
BIS—ISSUEDEAST ENDERS NYC INC04/21/2021
BIS—ISSUEDEAST ENDERS NYC INC04/21/2021
3 projects · most recent 09/09/2022
General Wiring
FiledStatusContractorScope
09/09/2022CompleteISLAND ELECTRIC CORP—
08/19/2021CompleteILLUMINOUS ELECTRIC CORP.General Wiring
09/05/2018CompleteREM & SONS LIC ELEC CONTGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/30/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/15/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/15/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/15/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/15/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
09/13/2021HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
09/13/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCHRISTIAN LOZADAspecial
09/13/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
09/13/2021Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
09/13/2021Energy Code ComplianceCHRISTIAN LOZADAprogress
09/13/2021Maintenance informationCHRISTIAN LOZADAenergy_progress
09/13/2021HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
09/13/2021HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
09/21/2020Finaljacob Kannerprogress
▾Documents — 93 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Plumbing2
08/27/2026Q00465158-I1Request digital key ↗
08/15/2026Q00465158-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00402305-I1Request digital key ↗
▸Applications & Permits9
▸BISWORK PERMIT APPLICATION4
08/31/2022440743732Open ↗
07/06/2021440654640Open ↗
07/06/2021440654640Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
08/30/2022440743732Open ↗
07/21/2021440654640Open ↗
12/28/2020440654640Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
06/02/2021440654640Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
02/25/2021440654640Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISVERIFY TAX LOT1
01/03/2022440654640Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
01/03/2022440654640Open ↗
▸BISZONING DIAGRAM1
01/22/2021440654640Open ↗
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026Q00465158-I1Open ↗
09/01/2026Q00465158-I1Open ↗
09/01/2026Q00465158-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026Q00465158-I1Open ↗
09/01/2026Q00465158-I1Open ↗
09/01/2026Q00465158-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/27/2026Q00465158-P1Open ↗
08/27/2026Q00465158-I1Open ↗
08/13/2026Q00402305-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
08/30/2022440743732Open ↗
12/28/2020440654640Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/30/2022440743732Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
05/27/2021440654640Open ↗
▸Trade Schedules & Equipment2
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
12/13/2021440654640Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
12/13/2021440654640Open ↗
▸Safety & Tenant Protection3
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
02/25/2021440654640Open ↗
▸BISSTREET TREE CHECKLIST1
12/28/2020440654640Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
08/31/2022440743732Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
08/30/2022440743732Open ↗
12/28/2020440654640Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/27/2026Q00465158-P1Open ↗
08/27/2026Q00465158-I1Open ↗
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
01/18/2023440743732Open ↗
08/30/2022440743732Open ↗
12/28/2020440654640Open ↗
▸BISINSULATION PLACEMENT & R VALUES2
12/13/2021440654640Open ↗
12/13/2021440654640Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
12/13/2021440654640Open ↗
▸BISINTERIOR LIGHTING POWER1
12/13/2021440654640Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/18/2023440743732Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
12/13/2021440654640Open ↗
▸BISFENESTRATION AREAS1
12/13/2021440654640Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
08/30/2022440743732Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
01/18/2023440743732Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
12/13/2021440654640Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/13/2021440654640Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
05/27/2021440654640Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/30/2022440743732Open ↗
▸BISFENESTRATION AIR LEAKAGE1
12/13/2021440654640Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00465158-I1Open ↗
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: RESPONSIBILITY5
01/18/2023440743732Open ↗
08/30/2022440743732Open ↗
01/22/2021440654640Open ↗
Showing 3 of 5 on file for this type
▸BISCONCRETE - CAST-IN-PLACE2
12/13/2021440654640Open ↗
12/13/2021440654640Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
01/22/2021440654640Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
12/13/2021440654640Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
12/13/2021440654640Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
12/13/2021440654640Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
01/22/2021440654640Open ↗
▸BISMECHANICAL SYSTEMS1
12/13/2021440654640Open ↗
▸BISSOIL PERC. TEST-STORM WATER SYSTEM (DRYWELL)1
12/13/2021440654640Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
12/13/2021440654640Open ↗
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION1
12/13/2021440654640Open ↗
▸Approvals, Objections & Sign-offs5
▸BISLETTERS - SUPPORTING DOCUMENTATION3
01/20/2023440743732Open ↗
01/20/2023440743732Open ↗
01/20/2023440743732Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/20/2023440743732Open ↗
▸BISSCHEDULE A - OCCUPANCY - USE1
12/28/2020440654640Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
01/18/2023440743732Open ↗
08/30/2022440743732Open ↗
12/28/2020440654640Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
01/03/2022440654640Open ↗
▸Filing & Intake Forms4
▸BISEFILING JOB APPLICATION COVER SHEET2
08/30/2022440743732Open ↗
12/28/2020440654640Open ↗
▸BISBOROUGH INTAKE FORM1
07/06/2021440654640Open ↗
▸BISADDITIONAL INFORMATION1
07/22/2021440654640Open ↗
▸Other Documents6
▸BISSHUTOFF DAMPERS1
12/13/2021440654640Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
12/28/2020440654640Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
12/13/2021440654640Open ↗
▸BISPERMANENT CERTIFICATE1
12/13/2021440654640Open ↗
▸BISON-SITE STORM WATER DRAIN. DISP. /DETENT INSTALL (DRYWELL)1
12/13/2021440654640Open ↗
▸BISPLOT DIAGRAM1
01/22/2021440654640Open ↗