← Back
Two stories - detached, small or mid-size
119-19 146 STREET
QUEENS · BIN 4261111
💬 Discuss this project
1925Year Built
2Stories
A1Building Class
R3AZoning
896 sfGross Floor Area
1Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Two stories - detached, small or mid-size · 2,000 sf lot · 0.45 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 11p · 1 filing · 6 docs
Cellar2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HILLSIDE PLAZA HOMES LLC.103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/01/2025$735K—— → —$820/sf building
02/22/2024$320K—Private party → HILLSIDE PLAZA HOMES LLC$357/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HAYM S. GROSS, ARCHITECT503/19/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRECISION HOME DEV INCGeneral Contractor107/08/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RIKE TECH ASSOCIATES LLC2965302/28/2025
Building Lifecycle
All (44)Filed (5)Permit Issued (2)Signed Off (2)Violation (7)Inspection (7)Special Inspection (21)
11/25/2025
Violation issued (HPD, open)
I
04/25/2025
Signed off — Alteration
application filed herewith for interior non bearing partitions work; replace floors, doors, gypsum boards; paint, replace siding
Q01076785-I1
04/25/2025
Signed off — Alteration
application filed for plumbing work
Q01076795-I1
04/22/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/19/2025
Filed — Alteration
application filed for plumbing work
Q01076795-P1
03/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SYED RIZVI
03/03/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SYED RIZVI
03/03/2025
Special inspection requirement — Fire-Resistance Rated Construction
HAYM GROSS
03/03/2025
Special inspection requirement — Energy Code Compliance Inspections
HAYM GROSS
03/03/2025
Special inspection requirement — Air barrier - visual inspection
HAYM GROSS
03/03/2025
Special inspection requirement — Fenestration air leakage
HAYM GROSS
03/03/2025
Special inspection requirement — Fenestration areas
HAYM GROSS
02/28/2025
Filed — Alteration
application filed herewith for interior non bearing partitions work; replace floors, doors, gypsum boards; paint, replace siding
Q01076785-P2
02/28/2025
Special inspection requirement — Air barrier - visual inspection
HAYM GROSS
02/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SYED RIZVI
02/28/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SYED RIZVI
02/28/2025
Special inspection requirement — Energy Code Compliance Inspections
HAYM GROSS
02/28/2025
Special inspection requirement — Fire-Resistance Rated Construction
HAYM GROSS
02/28/2025
Special inspection requirement — Fenestration air leakage
HAYM GROSS
02/28/2025
Special inspection requirement — Fenestration areas
HAYM GROSS
02/08/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/23/2024
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
12/20/2024
Filed — Alteration
application filed herewith for interior non bearing partitions work; replace floors, doors, gypsum boards; paint, replace siding
Q01076785-P1
12/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SYED RIZVI
12/20/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
SYED RIZVI
12/20/2024
Special inspection requirement — Energy Code Compliance Inspections
HAYM GROSS
12/20/2024
Special inspection requirement — Fire-Resistance Rated Construction
HAYM GROSS
12/20/2024
Special inspection requirement — Fenestration air leakage
HAYM GROSS
12/20/2024
Special inspection requirement — Air barrier - visual inspection
HAYM GROSS
12/20/2024
Special inspection requirement — Fenestration areas
HAYM GROSS
12/04/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/04/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/04/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/29/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/06/2024
Permit issued — Plumbing
Q01076795-I1-PL
09/03/2024
Permit issued — General Construction
Q01076785-I1-GC
07/17/2024
Filed — Alteration
application filed herewith for interior non bearing partitions work; replace floors, doors, gypsum boards; paint, replace siding
Q01076785-I1
07/17/2024
Filed — Alteration
application filed for plumbing work
Q01076795-I1
01/20/2016
Violation issued (HPD, closed)
I
12/27/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/09/2015
Violation issued (HPD, closed)
B
07/09/2015
Violation issued (HPD, closed)
B
06/04/2015
Violation issued (HPD, closed)
B
10/18/2010
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC09/06/2024
DOB NOWGeneral ConstructionSigned-offPRECISION HOME DEV INC09/03/2024
1 job · most recent 07/25/2024
General Wiring
FiledStatusContractorScope
07/25/2024CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/22/2025Pass-Final General Construction Non-Directive 14PassView ↗
02/08/2025Fail-Final General Construction Non-Directive 14FailView ↗
12/23/2024No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
12/04/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/04/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/04/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/29/2024Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
03/03/2025Fire-Resistant Penetrations and JointsSYED RIZVIspecial
03/03/2025Structural Stability – Alterations of existing buildingsSYED RIZVIspecial
03/03/2025Fire-Resistance Rated ConstructionHAYM GROSSprogress
03/03/2025Energy Code Compliance InspectionsHAYM GROSSprogress
03/03/2025Air barrier - visual inspectionHAYM GROSSenergy_progress
03/03/2025Fenestration air leakageHAYM GROSSenergy_progress
03/03/2025Fenestration areasHAYM GROSSenergy_progress
02/28/2025Air barrier - visual inspectionHAYM GROSSenergy_progress
02/28/2025Fire-Resistant Penetrations and JointsSYED RIZVIspecial
02/28/2025Structural Stability – Alterations of existing buildingsSYED RIZVIspecial
02/28/2025Energy Code Compliance InspectionsHAYM GROSSprogress
02/28/2025Fire-Resistance Rated ConstructionHAYM GROSSprogress
02/28/2025Fenestration air leakageHAYM GROSSenergy_progress
02/28/2025Fenestration areasHAYM GROSSenergy_progress
12/20/2024Fire-Resistant Penetrations and JointsSYED RIZVIspecial
12/20/2024Structural Stability – Alterations of existing buildingsSYED RIZVIspecial
12/20/2024Energy Code Compliance InspectionsHAYM GROSSprogress
12/20/2024Fire-Resistance Rated ConstructionHAYM GROSSprogress
12/20/2024Fenestration air leakageHAYM GROSSenergy_progress
12/20/2024Air barrier - visual inspectionHAYM GROSSenergy_progress
12/20/2024Fenestration areasHAYM GROSSenergy_progress
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/20/2026Q01076785-P1Request digital key ↗
08/20/2026Q01076785-P2Request digital key ↗
08/20/2026Q01076785-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature15
08/28/2026Q01076785-P2Open ↗
08/28/2026Q01076785-P2Open ↗
08/28/2026Q01076785-P2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/28/2026Q01076785-P2Open ↗
08/28/2026Q01076785-P2Open ↗
08/26/2026Q01076785-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/20/2026Q01076785-P2Open ↗
08/20/2026Q01076785-P1Open ↗
08/20/2026Q01076785-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/20/2026Q01076785-P2Open ↗
08/20/2026Q01076785-P1Open ↗
08/20/2026Q01076785-I1Open ↗
Showing 3 of 5 on file for this type