DOB04/23/2009V-DOB VIOLATION - ACTIVE
DOB04/23/2009V-DOB VIOLATION - ACTIVE
HPD01/06/2006SECTION 27-2142 ADM CODE - THE PREMISES OR APTS. HAVE BEEN VACATED BY THE DEPARTMENT AND CANNOT BE REOCCUPIED UNTIL SO ORDERED AFTER PROOF OF COMPLIANCE FOR 2 STY APT. 2 VACATE ORDER # 39023
HPD12/22/2005SECTION 27-2077 ADM CODE DISCONTINUE THE ROOMING UNIT ( 3 ROOMS ) & 2 B ROOMS IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY
HPD12/22/2005SECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF FIRE DAMAGE THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY
HPD04/07/2002SECTION 27-2005 ADMIN. CODE: REFIT WINDOW SASHES 3 STY. APT. KITCHEN AND BATHROOM.
ECB04/23/2009SEC. 28-201.1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR NOTICE OF VIOLATION #34571429N ISSUED ON 4/3/07 FOR NO PERMITS POSTED. ATNothing owed — awaiting certificate of correction
ECB01/15/2009RESIDENCE ALTERED FOR OCCUPANCY AS A DWELLING FOR MORE THAN THE LEGALLY APPROVED NUMBER OF FAMILIES DOB RECORDS INDICATES RESIDENCE AS A 2FAMILY RESIDENCE NOW ALTERED TO INCLUDE 1 SRO SRO LOCATED AT 3RD FL FRONNothing owed — awaiting certificate of correction
ECB01/13/2009WORK W/O PERMIT WORK NOTED AT FRONT FIRE ESCAPE REMOVED NO SECONDARY MEANS OF EGRESS 3RD FLR SPRINKLER SYSTEM NON-OPERATIONAL NOT INSPECTED OR SIGN OFF. JOB #402413063. REMEDY: OBTAIN PERMIT OR RESTORE TO PRIORNothing owed — awaiting certificate of correction
ECB04/03/2007SEC.27-194. NO POSTED PERMITS. OBSERVED: WORK ON INTERIOR OF BLDG W/NOPLANS & POSTED PERMITS. REMEDY: POST ALL DOB PERMITS.Nothing owed — awaiting certificate of correction
ECB01/12/2006OCCUPANCY IS CONTRARY TO THAT ALLOWED BY THE CERTIFICATE OF OCCUPANCY OR BLDG DEPT RECORDS 2ND STORY OCCUPIED AS SRO'S WITH PARTITIONS ERECTED.Nothing owed — awaiting certificate of correction