HPD02/02/2026§27-2153 ADM code the premises has been selected to participate in the alternative enforcement program which may result in building-wide inspections, fees, and extensive repair work to correct violations and underlying conditions. Charges for repair work done pursuant to this order, if not paid, will become liens on the property
ECB01/07/2026Failure to maintain building walls or appurtenances. Observed at parapet level, stucco finish has areas of spalling and degradation of stucco. Sections also have horizontal cracks at front, back and rear of the$8K due
HPD09/23/2025§ 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH AND CLEANABLE, POSITIVE LEAD-BASED PAINT IN AN APARTMENT WITH A CHILD UNDER SIX LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
DOB09/10/2024Failure to maintain building in code compliant manner. At time of inspection in bathroom i observed water leak from apartment 2G to apartment 1G
DOB06/12/2024Failure to certify correction on immediately hazardous (class 1) ECB violation
DOB05/15/2024Failure to certify correction on immediately hazardous (class 1) ECB violation
DOB03/06/2024At time of inspection observed fa ade in state of disrepair at multiple locations of parapet wall. Stucco and mortar joints between exposed bricks displaced and in danger of further collapse at exp. 1 and 3. Exp. 2 and 4 observed cracks in stucco at multiple locations at parapet wall.
ECB03/06/2024At time of inspection observed facade in state of disrepair at multiple locations of parapet wall. Stucco and mortar joints between exposed bricks displaced and in danger of further collapse at exp 1 and 3. Exp$2K due
ECB03/05/2024At parapet level, stucco finish has areas of spalling and degradation of stucco. Sections also have horizontal crack at front and at rear of building., maintain exterior building wall$2K due
HPD02/22/2024§ 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH AND CLEANABLE, POSITIVE LEAD-BASED PAINT IN AN APARTMENT WITH A CHILD UNDER SIX LOCATED AT APT 2P, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''EAST''
ECB08/04/2026Failure to maintain building wall (s) or appurtenances. Observed at exp 1 & 3 stucco finish has areas of spalling and degradation of stucco. Horizontal and vertical cracks at the parapet., maintain exterior buiHearing held — result not yet published$12K proposed
Old · issued 3+ years ago and still listed by DOB; nothing on the city's records either way
DOB12/01/2021Failure to display energy efficiency score and energy efficiency grade as per Admin. Code sec. 28-309.12.3Issued 2021; DOB's record still lists it as active