| Owner | Filings | Most Recent |
|---|---|---|
| DANIEL GROUP | 6 | 09/13/2026 |
| SAGE ENTERPRISES | 4 | 03/21/2026 |
| 119 METRO | 2 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| SOUTH BAY ENGINEERING PLLC | 3 | 08/06/2026 |
| ARC ARCHITECTURE + DESIGN STUDIO | 2 | 06/01/2026 |
| GAD ASHOORI PE | 3 | 05/19/2026 |
| SIDERIS KEFALAS ENGINEERS PC | 3 | 07/16/2025 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| N TECH DESIGN OF AMERICA | General Contractor | 2 | 07/29/2026 |
| MAKSIM WIESLAW | Electrical | 1 | 03/21/2026 |
| WIESLAW MAKSIM | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| SOUTH BAY ENGINEERING PLL | 6682 | 2 | 08/06/2026 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Full Demolition | Signed-off | N TECH DESIGN OF AMERICA | 07/28/2026 |
| DOB NOW | Construction Fence | Permit Issued | N TECH DESIGN OF AMERICA | 06/25/2026 |
| BIS | FP | ISSUED | MASTER FIRE SYSTEMS, INC | 09/15/2017 |
| BIS | PL | ISSUED | SPEEDWAY PLUMBING CORP | 03/15/2011 |
| BIS | PL | ISSUED | SPEEDWAY PLUMBING CORP | 03/02/2010 |
| BIS | OT | ISSUED | WJ CONTRACTING CORP | 02/12/2010 |
| BIS | FP | ISSUED | CITYWIDE FIRE SYSTEMS PLG. ENG. | 06/28/2007 |
| BIS | OT | ISSUED | DESIGN SPECTRUM ASSOCIATES INC. | 06/10/1996 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 06/01/2026 | — | — | Heating and Air Conditioning Systems, Ventilation Systems |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/01/2026 | — | — | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/01/2026 | — | — | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/20/2020 | Complete | WILLDAN ELECTRICAL OF NY | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/01/2026 | — | — | Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/04/2026 | Permit Issued | N TECH DESIGN OF AMERICA | Fence |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/30/2026 | Structural Stability – Alterations of existing Buildings | Chris Sanders | special |
| 05/19/2026 | Concrete - Cast-In-Place | — | special |
| 05/19/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 04/13/2026 | Structural Stability – Alterations of existing Buildings | Chris Sanders | special |
| 06/28/2025 | Duct leakage testing, insulation and design | — | energy_progress |
| 06/20/2025 | Post-installed Anchors | — | special |
| 06/18/2025 | HVAC-R and service water heating system controls | — | energy_progress |
| 06/18/2025 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 06/18/2025 | Shutoff dampers | — | energy_progress |
| 06/18/2025 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | — | special |
| 06/18/2025 | Fire-Resistant Penetrations and Joints | — | special |
| 06/18/2025 | Fire-Resistant Penetrations and Joints | — | special |
| 06/18/2025 | HVAC-R and service water heating equipment | — | energy_progress |
| 06/18/2025 | Maintenance information | — | energy_progress |
| 06/18/2025 | Fire-Resistant Penetrations and Joints | — | special |
| 06/18/2025 | HVAC-R and service water heating system controls | — | energy_progress |
| 06/18/2025 | HVAC-R and service water heating equipment | — | energy_progress |
| 06/18/2025 | Maintenance information | — | energy_progress |
| 06/18/2025 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 06/06/2025 | Electrical motors and elevators | — | energy_progress |
| 06/06/2025 | Combustible Exterior Wall Coverings | — | special |
| 06/06/2025 | Exterior Insulation and Finish Systems (EIFS) | — | special |
| 06/06/2025 | Fire-Resistant Penetrations and Joints | — | special |
| 06/06/2025 | Wall Panels, Curtain Walls, and Veneers | — | special |
| 06/06/2025 | Energy Code Compliance Inspections | — | progress |