Two family brick
119 BAY 41 STREET
BROOKLYN · Gravesend (West) · BIN 3186350
💬 Discuss this project
1955Year Built
1Stories
B1Building Class
R5Zoning
1,540 sfGross Floor Area
2Units
3 Open Violations ▸FDNY Report ↗
Two family brick · 1,933 sf lot · 0.8 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbingGeneral
Floor 25p · 2 filings · 20 docs
Floor 11p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/18/2025$1.1M—Private party → Private party$704/sf building
07/28/2022$1000K—— → —$649/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FARHAD BASSIRI-TEHRANI709/17/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KALE CONSTRUCTION INCGeneral Contractor107/08/2026
AMC PLBG, HTG & CLNG, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394409/17/2025
Building Lifecycle
All (30)Filed (7)Permit Issued (2)Signed Off (2)Violation (4)Inspection (6)Special Inspection (9)
03/25/2026
Signed off — Alteration
RENOVATION OF EXISTING FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW WASHER, DRYER AND COMBINED BOILER IN 1ST FLOOR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B01193367-I1
09/30/2025
Signed off — Alteration
RENOVATION OF EXISTING FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION:NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01193366-I1
09/29/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/18/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
09/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
09/18/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
09/17/2025
Filed — Alteration
RENOVATION OF EXISTING FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION:NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01193366-P3
09/17/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
09/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
09/17/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
09/10/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/09/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/27/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/22/2025
Filed — Alteration
RENOVATION OF EXISTING FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION:NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01193366-P2
08/22/2025
Filed — Alteration
RENOVATION OF EXISTING FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW WASHER, DRYER AND COMBINED BOILER IN 1ST FLOOR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B01193367-P3
06/10/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/30/2025
Filed — Alteration
RENOVATION OF EXISTING FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION:NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01193366-P1
05/30/2025
Filed — Alteration
RENOVATION OF EXISTING FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW WASHER, DRYER AND COMBINED BOILER IN 1ST FLOOR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B01193367-P2
05/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
05/30/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
05/30/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
03/20/2025
Permit issued — Plumbing
B01193367-I1-PL
03/20/2025
Permit issued — General Construction
B01193366-I1-GC
03/14/2025
Filed — Alteration
RENOVATION OF EXISTING FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW WASHER, DRYER AND COMBINED BOILER IN 1ST FLOOR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B01193367-I1
03/14/2025
Filed — Alteration
RENOVATION OF EXISTING FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION:NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01193366-I1
01/21/2025
Violation issued (HPD, open)
I
01/13/2025
Violation issued (HPD, closed)
C
01/13/2025
Violation issued (HPD, open)
A
01/13/2025
Violation issued (HPD, open)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC03/20/2025
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC03/20/2025
1 project · most recent 04/08/2025
General Wiring
FiledStatusContractorScope
04/08/2025CompleteKWONG MING ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
09/29/2025Pass-Final General Construction Non-Directive 14PassView ↗
09/10/2025Fail-Final General Construction Non-Directive 14FailView ↗
09/09/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/27/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/10/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
09/18/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
09/18/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
09/18/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
09/17/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
09/17/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
09/17/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
05/30/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
05/30/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
05/30/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/22/2026B01193367-P3Request digital key ↗
08/22/2026B01193367-P2Request digital key ↗
08/22/2026B01193367-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/22/2026B01193367-P3Open ↗
08/22/2026B01193367-P2Open ↗
08/22/2026B01193367-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026B01193366-P3Open ↗
08/29/2026B01193366-I1Open ↗
08/25/2026B01193366-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B01193366-P3Open ↗
08/29/2026B01193366-I1Open ↗
08/25/2026B01193366-P1Open ↗