← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Fultonhaus Condominium
119 FULTON STREET · BIN 1001264
💬 Discuss this project
1919Year Built
15Stories
RMBuilding Class
C6-4Zoning
28,550 sfGross Floor Area
20Units
LL97 CoveredRent Stabilized4 Active Violations 1 old, status unconfirmed ▸FISP: UNSAFEFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: Fultonhaus Condominium · 3,004 sf lot · 9.5 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof2 filings
Floor 11 filing
Cellar1 filing
Site & exterior5 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
119 Fulton St Realty2003/21/2026
Ruppert Housing707/08/2026
119 Fulton St303/21/2026
119Fulton St Realty Daniell Realty203/21/2026
Luby Realty Associates203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Alnour Consulting210/23/2025
KZ Engineering103/24/2025
Nouredine Benabdelhak112/16/2024
FL&M Engineering Design & Inspection102/23/2024
Spar Unlimited101/03/2024
Montroy Architecture103/22/2021
Asif Jamil, RA212/19/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Hierarch-E603/21/2026
Synergy Building Consultants103/21/2026
Millennium Designs of New York103/21/2026
Codegreen103/21/2026
Green Studio403/21/2026
Millennium Designs103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Rock Group NYScaffold1107/08/2026
Xtreme ScaffoldingScaffold504/09/2026
NTD ConstructionGeneral Contractor403/21/2026
5 K ConstructionGeneral Contractor303/21/2026
Pharaohs Restorationspecialty_contractor207/08/2026
Jerrick AssociatesGeneral Contractor103/21/2026
Perimeter Birdge ScaffGeneral Contractor103/21/2026
Perimeter Bridge ScaffoldingGeneral Contractor103/21/2026
Terry DesignGeneral Contractor103/21/2026
Exclusive RestorationScaffold107/08/2026
Pharaohs RestorationScaffold107/08/2026
Castcapa ConstructionGeneral Contractor103/21/2026
55C ConstructionGeneral Contractor109/17/2009
Amd & AssoicatatesPlumbing109/08/2006
C2 PlumbingFire Protection206/27/2011
Cooper Plumbing & HeatingPlumbing105/09/2006
Cooper Plumbing & HeatingPlumbing105/09/2006
Copper II Heating & PlumbingFire Protection109/25/2006
CSC of NYGeneral Contractor110/15/2010
Danica Plumbing & HeatingFire Protection109/27/2005
Danica Plumbing & HeatingPlumbing109/27/2005
Ideal Fire ControlFire Protection108/13/1997
Lakhi General ContractorGeneral Contractor107/05/2002
Thi General ContractingGeneral Contractor108/20/2004
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Alnour Consulting Engineering607112/16/2024
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
10/23/2026
Permit expired, never signed off — Supported Scaffold
The city's record still shows this permit as issued, with no sign-off on its filing
M01095762-S4-SF
10/14/2026
Elevator Category 1 inspection report filed
10/14/2026
Elevator Category 5 inspection report filed
06/26/2026
Signed off — Alteration
SUSPENDED SCAFFOLD INSTALLATION FOR FACADE REPAIRS AND INSPECTIONS
M01095762-S3
176 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—American Ventilation Service—
DOB NOW—Xtreme Scaffolding—
DOB NOW—Pharaohs Restoration—
DOB NOW—Pharaohs Restoration—
DOB NOW—American Ventilation Service—
DOB NOW—Pharaohs Restoration—
DOB NOW—Xtreme Scaffolding—
DOB NOW—Xtreme Scaffolding—
DOB NOW—Exclusive Restoration—
DOB NOW—Cerina General Contracting—
DOB NOW—5 K Construction—
DOB NOW—Rock Group NY—
DOB NOW—Rock Group NY—
DOB NOW—Rock Group NY—
DOB NOW—Rock Group NY—
DOB NOW—Rock Group NY—
BIS—Castcapa Construction—
BIS—Terry Design—
BIS—Terry Design—
BIS—Jerrick Associates—
BIS—Jerrick Associates—
BIS—Jerrick Associates—
BIS—Case Plumbing—
BIS—CSC of NY—
BIS—Case Plumbing—
BIS—55C Construction—
BIS—NTD Construction—
BIS—NTD Construction—
BIS—Cma Plumbing & Heating—
BIS—Accurate Mechanical—
BIS—NTD Construction—
BIS—NTD Construction—
BIS—Cooper Plumbing & Heating—
BIS—Cooper Plumbing & Heating—
BIS—Perimeter Bridge & Scaffolding—
BIS—NTD Construction—
BIS—NTD Construction—
BIS—Perimeter Birdge Scaff—
BIS—Danica Plumbing & Heating—
BIS—Danica Plumbing & Heating—
+ 6 more permits on file
Nothing on file for this building.
Nothing on file for this building.
165 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account