Miscellaneous two family
119 ST FELIX STREET
BROOKLYN · Fort Greene · BIN 3059202
💬 Discuss this project
1859Year Built
2.5Stories
B9Building Class
R6BZoning
2,190 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Miscellaneous two family · 1,307 sf lot · 1.68 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction13p · 1 filing · 20 docs
Floor 3Under Construction16p · 1 filing · 20 docs
Floor 2Under Construction14p · 1 filing · 20 docs
Floor 1Under Construction16p · 1 filing · 20 docs
CellarUnder Construction16p · 1 filing · 20 docs
Sub-BasementUnder Construction14p · 1 filing · 20 docs
Site & exteriorUnder Construction6p · 1 filing · 2 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/22/2025$2.7M—Private party → Private party$1,221/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
URBAN PIONEERING ARCHITECTURE708/05/2026
ALWAYS FAST SERVICES CORP103/18/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Bealin Groups Corp403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RED OAK RENOVATIONS CORPGeneral Contractor307/08/2026
ORBIT PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
URBAN PIONEERING ARCHITEC6521408/05/2026
Building Lifecycle
All (67)Filed (8)Permit Issued (4)Violation (1)Objection (28)Special Inspection (26)
09/22/2026
Objection resolved — Resolved
09/22/2026
Objection resolved — Resolved
09/22/2026
Objection resolved — Resolved
09/22/2026
Objection resolved — Resolved
09/22/2026
Objection resolved — Resolved
09/03/2026
Objection raised — Scope
09/03/2026
Objection raised — Other
09/03/2026
Objection raised — Zoning
09/03/2026
Objection raised — Zoning
09/03/2026
Objection raised — Zoning
08/05/2026
Filed — Alteration
THIS APPLICATION IS FOR INTERIOR RENOVATION TO ALL FLOORS WITH MINOR CHANGES TO THE REAR FACADE OPENINGS & THE REMOVAL OF THE REAR STOOP. THERE SHALL BE NO CHANGE IN OCCUPANCY, USE OR EGRESS.
B01306499-P1
08/05/2026
Filed — Alteration
THIS APPLICATION IS FOR INTERIOR RENOVATION TO ALL FLOORS WITH MINOR CHANGES TO THE REAR FACADE OPENINGS & THE REMOVAL OF THE REAR STOOP. THERE SHALL BE NO CHANGE IN OCCUPANCY, USE OR EGRESS.
B01306499-P2
08/04/2026
Special inspection requirement — HVAC-R and service water heating equipment
James Hill
08/04/2026
Special inspection requirement — Energy Code Compliance Inspections
James Hill
08/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Hill
08/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
James Hill
08/04/2026
Special inspection requirement — HVAC-R and service water heating system controls
James Hill
04/30/2026
Filed — Alteration
THIS APPLICATION IS FOR INTERIOR RENOVATION TO ALL FLOORS WITH MINOR CHANGES TO THE REAR FACADE OPENINGS & THE REMOVAL OF THE REAR STOOP. THERE SHALL BE NO CHANGE IN OCCUPANCY, USE OR EGRESS.
B01306499-S4
04/07/2026
Permit issued — Plumbing
B01306499-S1-PL
03/31/2026
Special inspection requirement — Footing and Foundation
03/31/2026
Special inspection requirement — Final
03/27/2026
Permit issued — General Construction
B01306499-I1-GC
03/18/2026
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01368313-I1
03/18/2026
Permit issued — Construction Fence
B01368313-I1-FN
03/17/2026
Permit issued — General Construction
B01306499-I1-GC
02/13/2026
Filed — Alteration
THIS APPLICATION IS FOR INTERIOR RENOVATION TO ALL FLOORS WITH MINOR CHANGES TO THE REAR FACADE OPENINGS & THE REMOVAL OF THE REAR STOOP. THERE SHALL BE NO CHANGE IN OCCUPANCY, USE OR EGRESS.
B01306499-S2
02/13/2026
Filed — Alteration
THIS APPLICATION IS FOR INTERIOR RENOVATION TO ALL FLOORS WITH MINOR CHANGES TO THE REAR FACADE OPENINGS & THE REMOVAL OF THE REAR STOOP. THERE SHALL BE NO CHANGE IN OCCUPANCY, USE OR EGRESS.
B01306499-S3
02/10/2026
Special inspection requirement — Structural Cold-Formed Steel
02/10/2026
Special inspection requirement — Structural Steel - Details
02/10/2026
Special inspection requirement — Maintenance information
02/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/10/2026
Special inspection requirement — Energy Code Compliance Inspections
02/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
02/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
02/10/2026
Special inspection requirement — HVAC-R and service water heating system controls
02/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
02/10/2026
Special inspection requirement — Masonry
02/09/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
02/03/2026
Objection resolved — Addressed
02/03/2026
Special inspection requirement — Mechanical Systems
02/03/2026
Special inspection requirement — Final
02/03/2026
Special inspection requirement — Final
01/27/2026
Objection resolved — Addressed
12/24/2025
Objection raised — Admin
12/23/2025
Objection raised — Admin
12/12/2025
Objection resolved — Addressed
12/12/2025
Objection resolved — Addressed
12/09/2025
Objection resolved — Addressed
12/09/2025
Objection resolved — Addressed
12/08/2025
Objection raised — Other
12/08/2025
Objection raised — Plumbing
12/08/2025
Objection resolved — Addressed
12/04/2025
Objection raised — Other
11/24/2025
Filed — Alteration
THIS APPLICATION IS FOR INTERIOR RENOVATION TO ALL FLOORS WITH MINOR CHANGES TO THE REAR FACADE OPENINGS & THE REMOVAL OF THE REAR STOOP. THERE SHALL BE NO CHANGE IN OCCUPANCY, USE OR EGRESS.
B01306499-S1
11/20/2025
Objection resolved — Addressed
11/20/2025
Objection resolved — Addressed
11/20/2025
Special inspection requirement — Energy Code Compliance Inspections
James Hill
11/20/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
James Hill
11/20/2025
Special inspection requirement — HVAC-R and service water heating equipment
James Hill
11/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Hill
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedORBIT PLBG & HTG INC04/07/2026
DOB NOWGeneral ConstructionPermit IssuedRED OAK RENOVATIONS CORP03/27/2026
DOB NOWConstruction FencePermit IssuedRED OAK RENOVATIONS CORP03/18/2026
DOB NOWGeneral ConstructionPermit IssuedRED OAK RENOVATIONS CORP03/17/2026
1 project · most recent 08/05/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/05/2026Permit IssuedORBIT PLBG & HTG INCGas, Water/Sanitary
1 project · most recent 04/16/2026
General Wiring
FiledStatusContractorScope
04/16/2026Permit IssuedP & Z ELECTRIC CORPGeneral Wiring
1 project · most recent 03/18/2026
Fence
FiledStatusContractorScope
03/18/2026Permit IssuedRED OAK RENOVATIONS CORPFence
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
08/04/2026HVAC-R and service water heating equipmentJames Hillenergy_progress
08/04/2026Energy Code Compliance InspectionsJames Hillprogress
08/04/2026Fire-Resistant Penetrations and JointsJames Hillspecial
08/04/2026HVAC-R and service water piping design and insulationJames Hillenergy_progress
08/04/2026HVAC-R and service water heating system controlsJames Hillenergy_progress
03/31/2026Footing and Foundation—progress
03/31/2026Final—progress
02/10/2026Structural Cold-Formed Steel—special
02/10/2026Structural Steel - Details—special
02/10/2026Maintenance information—energy_progress
02/10/2026Fire-Resistant Penetrations and Joints—special
02/10/2026Energy Code Compliance Inspections—progress
02/10/2026Fire-Resistance Rated Construction—progress
02/10/2026HVAC-R and service water heating equipment—energy_progress
02/10/2026HVAC-R and service water heating system controls—energy_progress
02/10/2026HVAC-R and service water piping design and insulation—energy_progress
02/10/2026Masonry—special
02/09/2026Structural Stability – Alterations of existing buildings—special
02/03/2026Mechanical Systems—special
02/03/2026Final—progress
02/03/2026Final—progress
11/20/2025Energy Code Compliance InspectionsJames Hillprogress
11/20/2025HVAC-R and service water piping design and insulationJames Hillenergy_progress
11/20/2025HVAC-R and service water heating equipmentJames Hillenergy_progress
11/20/2025Fire-Resistant Penetrations and JointsJames Hillspecial
Latest 25 of 26.
▾Documents — 35 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/17/2026B01368313-I1Request digital key ↗
08/17/2026B01306499-P1Request digital key ↗
08/17/2026B01306499-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits7
▸DOB NOWLPC Approval/Permit7
08/17/2026B01306499-P1Open ↗
08/17/2026B01306499-P2Open ↗
08/17/2026B01306499-S4Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/17/2026B01368313-I1Open ↗
08/17/2026B01306499-P1Open ↗
08/17/2026B01306499-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/25/2026B01306499-S1Open ↗
08/25/2026B01306499-S1Open ↗
08/23/2026B01306499-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026B01306499-S1Open ↗
08/23/2026B01306499-P2Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/17/2026B01306499-P2Open ↗
08/17/2026B01306499-P1Open ↗
08/13/2026B01306499-I1Open ↗
Showing 3 of 6 on file for this type