← Back
One family attached or semi-detached
119 TRANTOR PLACE
STATEN ISLAND · Port Richmond · BIN 5026250
💬 Discuss this project
1965Year Built
2Stories
A5Building Class
R3AZoning
1,144 sfGross Floor Area
1Units
One family attached or semi-detached · 2,100 sf lot · 0.54 FAR built · Flood zone X
Locations of Work
Electrical
Roof1p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC110/17/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272110/17/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
07/24/2026
Signed off — Alteration
S01303524-I1
10/22/2025
Permit issued — Solar
S01303524-I1-SL
10/17/2025
Filed — Alteration
S01303524-I1
10/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
10/15/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
10/15/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
10/15/2025
Special inspection requirement — Final
Walid Abdulla
10/15/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC10/22/2025
1 project · most recent 10/17/2025
FiledStatusContractorScope
10/17/2025CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/15/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
10/15/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
10/15/2025Energy Code Compliance InspectionsWalid Abdullaprogress
10/15/2025FinalWalid Abdullaprogress
10/15/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 6 on file (BIS + DOB NOW)
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature3
08/23/2026S01303524-I1Open ↗
08/23/2026S01303524-I1Open ↗
08/23/2026S01303524-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026S01303524-I1Open ↗
08/23/2026S01303524-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01303524-I1Open ↗