Office only, 7-19 stories
119 WEST 24 STREET
MANHATTAN · BIN 1014981
💬 Discuss this project
1913Year Built
12Stories
O3Building Class
M1-8A/R11Zoning
130,876 sfGross Floor Area
1Units
LL97 Covered3 Open Violations ▸FISP: SWARMPFDNY Report ↗
Office only, 7-19 stories · Owner of record: 119 WEST 24TH STREET PROPERTIES, LLC · 10,717 sf lot · 12.21 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof1p · 1 filing · 7 docs
Floor 77p · 2 filings · 12 docs
Floor 6
Floor 510p · 3 filings · 20 docs
Floor 410p · 3 filings · 20 docs
Floor 311p · 4 filings · 20 docs
Floor 28p · 3 filings · 13 docs
Floor 19p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KAUFMAN MANAGEMENT COMPANY5307/08/2026
119 WEST 24TH STREET PROPERTIES, LLC303/22/2026
127 WEST 25TH STREET203/22/2026
NEW YORK CONSTRUCTION ASS103/22/2026
DNS CONSTRUCTION103/22/2026
119 EQUITIES403/22/2026
F M RING ASSOC2703/22/2026
FM RIND ASSOC INC103/22/2026
FM RINE ASSOCIATES103/22/2026
RING F M ASSOC203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/10/2015$86.6M—119-125 WEST 24TH STREET OWNER LLC → HLP PROPERTIES, LLC$662/sf building
01/13/2014$30.0M—— → —$229/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DVA Advisors703/21/2026
MUNICIPAL BUILDING CONSULTANTS403/21/2026
RIZZO GROUP703/21/2026
NEW YORK ENGINEERING ASSOCIATES P203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TALISEN CONSTRUCTION CORPGeneral Contractor507/08/2026
AHEARN-HOLTZMAN, INCGeneral Contractor507/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor407/08/2026
THE METRO GROUP, INCGeneral Contractor303/21/2026
BUCH CONSTRUCTION, INCGeneral Contractor207/08/2026
MILLER PLBG & HTG INCPlumbing107/08/2026
GREGORY PAPANTONIOUElectrical103/21/2026
PSI PLUMBING INCPlumbing107/08/2026
FIVE BOROUGH NYC LLCFire Protection107/08/2026
SIRINA FIRE PROT CORPFire Protection107/08/2026
UNITED PLBG MECHANICAL INCFire Protection107/08/2026
A.R. EQUIPMENT LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENTHINK ENGINEERS LLC6247107/26/2023
SKYLINE ENGINEERING, PLLC267311/22/2022
CODEGREEN510701/30/2022
NEW YORK ENGINEERING ASSO851107/06/2020
RICHARD H. BALSER ENGINEE3028312/17/2019
Building Lifecycle
All (163)Filed (21)Permit Issued (17)Signed Off (14)Facade (FISP) (13)Violation (60)Inspection (8)Special Inspection (30)
01/16/2026
Violation issued (FDNY_ORDER, closed)
01/15/2025
Signed off — Alteration
INTERIOR DEMOLITION WORK, REMOVAL OFNON-BEARING PARTITIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M08014375-I1
10/17/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00907396-I1
10/17/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY GLASS PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
M00907416-I1
07/02/2024
Violation issued (FDNY_NOV, closed)
08/07/2023
Cycle 9 facade report signed — SWARMP
08/03/2023
Cycle 9 facade inspection completed
07/26/2023
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00907396-I1
07/26/2023
Filed — Alteration
INSTALLATION OF TEMPORARY GLASS PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
M00907416-I1
07/26/2023
Permit issued — Protection and Mechanical Methods
M00907416-I1-PMM
07/26/2023
Permit issued — Sidewalk Shed
M00907396-I1-SH
07/26/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Sunil Saigal
05/03/2023
Signed off — Alteration
Sprinkler work as shown on plans.
M00738640-I1
04/25/2023
Signed off — Alteration
Mechanical work as shown on plans
M00738627-I1
04/24/2023
Signed off — Alteration
Plumbing work as shown on plans
M00738632-I1
04/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/18/2023
Signed off — Alteration
General Construction work as shown on plans.
M00738621-I1
02/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/17/2023
Cycle 9 facade report submitted
11/29/2022
Violation issued (ECB, closed)
Elevators
11/29/2022
Violation issued (ECB, closed)
Elevators
11/28/2022
Special inspection requirement — Final
DAMIAN MELO
11/28/2022
Special inspection requirement — Lighting controls
Matthew Wavro
11/28/2022
Special inspection requirement — Interior lighting power
Matthew Wavro
11/22/2022
Filed — Alteration
Sprinkler work as shown on plans.
M00738640-P1
11/22/2022
Filed — Alteration
General Construction work as shown on plans.
M00738621-P1
10/27/2022
Special inspection requirement — Lighting controls
Matthew Wavro
10/27/2022
Special inspection requirement — Interior lighting power
Matthew Wavro
10/27/2022
Special inspection requirement — Final
DAMIAN MELO
10/26/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/25/2022
Special inspection requirement — Sprinkler Systems
Matthew Wavro
10/11/2022
Filed — Alteration
Plumbing work as shown on plans
M00738632-P1
10/07/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/06/2022
Permit issued — General Construction
M08014375-I1-GC
10/05/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/27/2022
Filed — Alteration
INTERIOR DEMOLITION WORK, REMOVAL OFNON-BEARING PARTITIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M08014375-I1
09/13/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/21/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/15/2022
Permit issued — Mechanical Systems
M00738627-I1-MS
08/12/2022
Signed off — Alteration
SPRINKLER MODIFICATIONS TAKING PLACE ON 1ST & 7TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00594246-I1
08/04/2022
Permit issued — General Construction
M00738621-I1-GC
07/28/2022
Permit issued — Sprinklers
M00738640-I1-EW-SP
07/15/2022
Permit issued — Plumbing
M00738632-I1-PL
06/27/2022
Filed — Alteration
General Construction work as shown on plans.
M00738621-I1
06/23/2022
Filed — Alteration
Sprinkler work as shown on plans.
M00738640-I1
06/23/2022
Filed — Alteration
Mechanical work as shown on plans
M00738627-I1
06/23/2022
Filed — Alteration
Plumbing work as shown on plans
M00738632-I1
06/23/2022
Signed off — Alteration
MECHANICAL MODIFICATIONS TAKING PLACE ON 1ST & 7TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE USE, EGRESS OR OCCUPANCY.
M00594196-I1
06/23/2022
Signed off — Alteration
PLUMBING MODIFICATIONS TAKING PLACE ON 1ST & 7TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00594227-I1
06/22/2022
Signed off — Alteration
GENERAL CONSTRUCTION TAKING PLACE ON 1ST & 7TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00594269-I1
06/21/2022
Signed off — Alteration
GENERAL CONSTRUCTION TAKING PLACE ON 1ST FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
M00573880-I1
06/21/2022
Special inspection requirement — Maintenance information
Matthew Wavro
06/21/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Matthew Wavro
06/21/2022
Special inspection requirement — HVAC-R and service water heating system controls
Matthew Wavro
06/21/2022
Special inspection requirement — HVAC-R and service water heating equipment
Matthew Wavro
05/16/2022
Special inspection requirement — Mechanical Systems
Matthew Wavro
05/16/2022
Special inspection requirement — Final
Matthew Wavro
02/09/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/08/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/02/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
Latest 60 of 163 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsSigned-offANDAMIO SCAFFOLDING LLC07/26/2023
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC07/26/2023
DOB NOWGeneral ConstructionSigned-offA.R. EQUIPMENT LLC10/06/2022
DOB NOWMechanical SystemsSigned-offBUCH CONSTRUCTION, INC08/15/2022
DOB NOWGeneral ConstructionSigned-offBUCH CONSTRUCTION, INC08/04/2022
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP07/28/2022
DOB NOWPlumbingSigned-offPSI PLUMBING INC07/15/2022
DOB NOWPlumbingSigned-offMILLER PLBG & HTG INC11/03/2021
DOB NOWSprinklersSigned-offFIVE BOROUGH NYC LLC11/01/2021
DOB NOWMechanical SystemsSigned-offTALISEN CONSTRUCTION CORP10/28/2021
DOB NOWGeneral ConstructionSigned-offTALISEN CONSTRUCTION CORP10/20/2021
DOB NOWGeneral ConstructionSigned-offTALISEN CONSTRUCTION CORP09/09/2021
DOB NOWMechanical SystemsSigned-offTHE METRO GROUP, INC07/08/2020
DOB NOWStructuralSigned-offAHEARN-HOLTZMAN, INC12/23/2019
DOB NOWMechanical SystemsPermit IssuedAHEARN-HOLTZMAN, INC12/17/2019
DOB NOWSprinklersSigned-offUNITED PLBG MECHANICAL INC12/11/2019
DOB NOWMechanical SystemsPermit IssuedAHEARN-HOLTZMAN, INC12/07/2019
BISOTISSUEDAHEARN-HOLTZMAN, INC06/04/2020
BISOTISSUEDAHEARN-HOLTZMAN, INC04/20/2020
BISOTISSUEDBBM DEVELOPMENT INC05/29/2019
BISMHISSUEDMANHATTAN MECHANICAL CONT04/03/2019
BIS—ISSUEDN/A11/09/2018
BISOTISSUEDBBM DEVELOPMENT INC06/11/2018
BISSPISSUEDPARAMOUNT PLBG CO OF NY I01/18/2018
BISOTISSUEDDAUFMAN MANGEMENT10/30/2017
BISFSISSUEDRICHARD MORTMAN09/25/2017
BISSPISSUEDPARAMOUNT PLBG CO OF NY I06/21/2017
BISMHISSUEDADVANCED AIR TECHNOLOGY06/08/2017
BISPLISSUEDPARAMOUNT PLUMBING CO.,IN04/13/2017
BISMHISSUEDCOASTAL AIR INC04/11/2017
BISPLISSUEDMERCON CONTRACTING CORP03/29/2017
BISOTISSUEDKATSELNIK & KATSELNIK GRP03/09/2017
BIS—ISSUEDKAUFMAN REALTY02/16/2017
BISSPISSUEDCHINATOWN P&H INC11/02/2016
BIS—ISSUEDJT MAGEN & COMPANY INC09/19/2016
BISFPISSUEDFIREMASTERS08/11/2016
BISSPISSUEDPREFERRED SPKLR AND MECH06/21/2016
BISSPISSUEDPREFERRED SPKLR AND MECH05/12/2016
BISPLISSUEDASHLAND PLUMBING CORP04/20/2016
BISPLISSUEDG. C. PLBG & HTG INC03/02/2016
+ 27 more permits on file
1 project · most recent 12/04/2019
FiledStatusContractorScope
12/04/2019Signed-offUNITED PLBG MECHANICAL IN—
8 projects · most recent 08/29/2023
General Wiring Lighting
FiledStatusContractorScope
08/29/2023CompleteBOROWIDE ELECT'L CONTR'S—
07/21/2022CompleteBIGMAN BROS., INC.General Wiring, Lighting
11/02/2021CompleteALL SYSTEMS ELECTRIC NY LGeneral Wiring
06/03/2021CompleteCENTENNIAL ELEVATOR INDUSGeneral Wiring
11/05/2020CompleteALL CITY ELECTRICAL INCGeneral Wiring
11/04/2020CompleteALL CITY ELECTRICAL INC—
12/06/2019CompleteFOREST ELECTRIC CORP.General Wiring
03/14/2019CompleteTWINTECH ELECTRIC INC—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
10/26/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/07/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/05/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/13/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/09/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/08/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/02/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/18/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
07/26/2023Structural Stability – Alterations of existing buildingsSunil Saigalspecial
11/28/2022FinalDAMIAN MELOprogress
11/28/2022Lighting controlsMatthew Wavroenergy_progress
11/28/2022Interior lighting powerMatthew Wavroenergy_progress
10/27/2022Lighting controlsMatthew Wavroenergy_progress
10/27/2022Interior lighting powerMatthew Wavroenergy_progress
10/27/2022FinalDAMIAN MELOprogress
10/25/2022Sprinkler SystemsMatthew Wavrospecial
06/21/2022Maintenance informationMatthew Wavroenergy_progress
06/21/2022HVAC-R and service water piping design and insulationMatthew Wavroenergy_progress
06/21/2022HVAC-R and service water heating system controlsMatthew Wavroenergy_progress
06/21/2022HVAC-R and service water heating equipmentMatthew Wavroenergy_progress
05/16/2022Mechanical SystemsMatthew Wavrospecial
05/16/2022FinalMatthew Wavroprogress
02/01/2022Post-installed AnchorsSTEPHEN COHENspecial
02/01/2022Fire-Resistant Penetrations and JointsSTEPHEN COHENspecial
02/01/2022Sprinkler Systemssajjad javaidspecial
01/24/2022Fire-Resistant Penetrations and JointsSTEPHEN COHENspecial
01/24/2022Post-installed AnchorsSTEPHEN COHENspecial
01/24/2022Sprinkler Systemssajjad javaidspecial
11/03/2021Fire-Resistant Penetrations and JointsSTEPHEN COHENspecial
11/03/2021Energy Code Compliance InspectionsSTEPHEN COHENprogress
11/03/2021Fire-Resistance Rated ConstructionSTEPHEN COHENprogress
11/03/2021FinalSTEPHEN COHENprogress
08/25/2021Fire-Resistant Penetrations and JointsSTEPHEN COHENspecial
Latest 25 of 34.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
IndustriousOfficeFloors 3–5
Project M00738640 Alteration · LOC Issued · 06/23/2022
Volvox LabsLaboratoryFloor 2
Project M00270762 Alteration · LOC Issued · 12/17/2019
Project M00269210 Alteration · Permit Entire · 12/05/2019
Project M00269241 Alteration · Permit Entire · 12/04/2019
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 1,057 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch17
09/03/2026M00573880-I1Request digital key ↗
09/03/2026M00594269-P1Request digital key ↗
09/03/2026M00594269-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00269210-I1Request digital key ↗
09/04/2026M00361054-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00270762-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/05/2026M00269241-I1Request digital key ↗
▸Applications & Permits201
▸BISPLAN / WORK APPROVAL APPLICATION132
06/12/2024122631580Open ↗
06/11/2024122631580Open ↗
05/29/2024122631580Open ↗
Showing 3 of 132 on file for this type
▸BISWORK PERMIT APPLICATION58
12/05/2019123848131Open ↗
05/29/2019123781201Open ↗
04/03/2019123655669Open ↗
Showing 3 of 58 on file for this type
▸BISPLACE OF ASSEMBLY8
02/04/2022122660664Open ↗
12/01/2021122660664Open ↗
Showing 2 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISRequest for Certificate of Occupancy with Open Application(s) Cover Letter1
07/08/2020122631580Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/18/2021122631580Open ↗
▸Seals & Professional Certifications247
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION123
12/05/2019123848131Open ↗
09/11/2019101509235Open ↗
08/21/2019123781201Open ↗
Showing 3 of 123 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT36
12/05/2019123848131Open ↗
06/03/2019123781201Open ↗
03/22/2019123655669Open ↗
Showing 3 of 36 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST28
12/05/2019123848131Open ↗
06/03/2019123781201Open ↗
03/22/2019123655669Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
09/05/2026M00269210-I1Open ↗
09/03/2026M00573880-I1Open ↗
09/03/2026M00594269-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/23/2026M00738627-I1Open ↗
09/01/2026M00573880-I1Open ↗
08/28/2026M00738627-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/23/2026M00738627-I1Open ↗
09/01/2026M00738640-P1Open ↗
09/01/2026M00594246-P1Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment78
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE40
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 40 on file for this type
▸BISSELF-CERT PLUMBING NOTICE11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA10
04/30/2021123043018Open ↗
10/15/2018122469248Open ↗
05/04/2018122509268Open ↗
Showing 3 of 10 on file for this type
▸BISEQUIPMENT USE PERMITS7
04/03/2019123655669Open ↗
Showing 1 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
04/03/2019123655669Open ↗
04/03/2019123655669Open ↗
Showing 2 of 5 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
12/11/2018101509235Open ↗
▸BISSCHEDULE B - PLUMBING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection8
▸BISSTREET TREE CHECKLIST6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTenant Protection Plan and Notes2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos54
▸BISASBESTOS: CERTIFICATION (DEP ACP5)33
12/05/2019123848131Open ↗
06/03/2019123781201Open ↗
06/12/2018123585913Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report19
09/05/2026M00269210-I1Open ↗
09/03/2026M00573880-I1Open ↗
09/03/2026M00594269-P1Open ↗
Showing 3 of 19 on file for this type
▸BISASBESTOS: EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance72
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS42
12/05/2019123848131Open ↗
03/22/2019123655669Open ↗
12/11/2018101509235Open ↗
Showing 3 of 42 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS21
11/18/2020123848131Open ↗
04/03/2019123655669Open ↗
05/04/2018122509268Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWEN2: As Built Energy Analysis3
09/02/2026M00738621-I1Open ↗
08/13/2026M00738627-I1Open ↗
09/03/2026M00594196-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/18/2020123848131Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/18/2021122631580Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports8
▸BISHYDRAULIC FLOW CALCULATIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY3
11/18/2020123848131Open ↗
Showing 1 of 3 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs134
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST82
05/20/2021123043018Open ↗
01/12/2021122631580Open ↗
01/12/2021122423387Open ↗
Showing 3 of 82 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE37
06/11/2024122631580Open ↗
05/03/2024122423387Open ↗
04/30/2024122423387Open ↗
Showing 3 of 37 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSUPERSEDING LETTER2
09/06/2018101509235Open ↗
Showing 1 of 2 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFINAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership88
▸BISCOST AFFIDAVIT88
05/20/2021123043018Open ↗
11/18/2020123848131Open ↗
12/13/2019122423387Open ↗
Showing 3 of 88 on file for this type
▸Filing & Intake Forms134
▸BISBOROUGH INTAKE FORM52
07/08/2020122631580Open ↗
04/17/2020122423387Open ↗
03/27/2020122423387Open ↗
Showing 3 of 52 on file for this type
▸BISEFILING COVER SHEET44
12/05/2019123848131Open ↗
06/03/2019123781201Open ↗
03/22/2019123655669Open ↗
Showing 3 of 44 on file for this type
▸BISADDITIONAL INFORMATION35
02/22/2022122660664Open ↗
02/03/2022122631580Open ↗
05/30/2019101509235Open ↗
Showing 3 of 35 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Other Documents11
▸BISPLOT DIAGRAM5
12/13/2019122423387Open ↗
Showing 1 of 5 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
07/08/2020122631580Open ↗
▸BISFIRE SUPP ANSUL APPROVL: FD-FSS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type