Roof17p · 8 filings · 20 docs
ArchitectureDMMechanicalPlumbing
Issued Permit Scope
Plumbing
DEMOLISH (2) EXISTING HVAC UNITS LOCATED ON FOURTH FLOOR ROOF TO RESOLVE FDNY SUMMONS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
3 documents · 1 drawing sheet
This Application is Filed For a Temporary Use Permit for Model Room Penthouse A pursuant to section AC28-11 and Buildings Bulletin 2010-002. There is no construction work filed.
On file for this project
4 documents · 1 drawing sheet
MODIFICATION OF PLUMBING FIXTURES AND ASSOCIATED PIPING FOR INTERIOR CONDO WORK.
On file for this project
29 documents · 5 drawing sheets
Latest 3 of 8 filings on this floor.
Bulkhead3p · 1 filing · 20 docs
Fire ProtectionStructural
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 3 drawing sheets
Penthouse3p · 2 filings · 20 docs
Fire ProtectionPlumbing
MODIFICATION OF PLUMBING FIXTURES AND ASSOCIATED PIPING FOR INTERIOR CONDO WORK.
On file for this project
29 documents · 2 drawing sheets
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 1 drawing sheet
Floor 426p · 4 filings · 20 docs
ArchitectureMechanicalPlumbing
MODIFICATION OF PLUMBING FIXTURES AND ASSOCIATED PIPING FOR INTERIOR CONDO WORK.
On file for this project
29 documents · 1 drawing sheet
Installation of mechanical, HVAC units and related ductwork for Condo Interior work.
On file for this project
21 documents · 5 drawing sheets
MODIFICATION TO EXISTING PLUMBING FIXTURES AND ALL ASSOCIATED PIPING.
On file for this project
23 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 4113p · 4 filings · 20 docs
ArchitectureCivilMechanicalPlumbing
MODIFICATION OF PLUMBING FIXTURES AND ASSOCIATED PIPING FOR INTERIOR CONDO WORK.
On file for this project
29 documents · 5 drawing sheets
REMOVE AND INSTALL MECHANICAL HVAC DUCTWORK AND EQUIPMENT PER PLANS.
On file for this project
12 documents
Installation of mechanical, HVAC units and related ductwork for Condo Interior work.
On file for this project
21 documents · 6 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 4015p · 4 filings · 20 docs
DMFire ProtectionMechanicalPlumbing
MODIFICATION OF PLUMBING FIXTURES AND ASSOCIATED PIPING FOR INTERIOR CONDO WORK.
On file for this project
29 documents · 5 drawing sheets
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 2 drawing sheets
Installation of mechanical, HVAC units and related ductwork for Condo Interior work.
On file for this project
21 documents · 7 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 3911p · 3 filings · 20 docs
DMFire ProtectionMechanicalPlumbing
MODIFICATION OF PLUMBING FIXTURES AND ASSOCIATED PIPING FOR INTERIOR CONDO WORK.
On file for this project
29 documents · 5 drawing sheets
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 1 drawing sheet
Installation of mechanical, HVAC units and related ductwork for Condo Interior work.
On file for this project
21 documents · 5 drawing sheets
Floor 3815p · 4 filings · 20 docs
DMFire ProtectionMechanicalPlumbing
MODIFICATION OF PLUMBING FIXTURES AND ASSOCIATED PIPING FOR INTERIOR CONDO WORK.
On file for this project
29 documents · 6 drawing sheets
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 1 drawing sheet
Installation of mechanical, HVAC units and related ductwork for Condo Interior work.
On file for this project
21 documents · 5 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 3713p · 4 filings · 20 docs
DMFire ProtectionMechanicalPlumbing
MODIFICATION OF PLUMBING FIXTURES AND ASSOCIATED PIPING FOR INTERIOR CONDO WORK.
On file for this project
29 documents · 6 drawing sheets
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 1 drawing sheet
Installation of mechanical, HVAC units and related ductwork for Condo Interior work.
On file for this project
21 documents · 4 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 3611p · 3 filings · 20 docs
DMFire ProtectionMechanicalPlumbing
MODIFICATION OF PLUMBING FIXTURES AND ASSOCIATED PIPING FOR INTERIOR CONDO WORK.
On file for this project
29 documents · 6 drawing sheets
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 1 drawing sheet
Installation of mechanical, HVAC units and related ductwork for Condo Interior work.
On file for this project
21 documents · 4 drawing sheets
Floor 3519p · 6 filings · 20 docs
DMFire ProtectionMechanicalPlumbing
MODIFICATION OF PLUMBING FIXTURES AND ASSOCIATED PIPING FOR INTERIOR CONDO WORK.
On file for this project
29 documents · 6 drawing sheets
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 1 drawing sheet
Installation of mechanical, HVAC units and related ductwork for Condo Interior work.
On file for this project
21 documents · 4 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 3419p · 6 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
MODIFICATION OF PLUMBING FIXTURES AND ASSOCIATED PIPING FOR INTERIOR CONDO WORK.
On file for this project
29 documents · 7 drawing sheets
INSTALLATION OF HORIZONTAL NETTING AS PER PLANS. HORIZONTAL NETTING SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
6 documents · 1 drawing sheet
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 3315p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
MODIFICATION OF PLUMBING FIXTURES AND ASSOCIATED PIPING FOR INTERIOR CONDO WORK.
On file for this project
29 documents · 5 drawing sheets
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 2 drawing sheets
Installation of mechanical, HVAC units and related ductwork for Condo Interior work.
On file for this project
21 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 3217p · 7 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
MODIFICATION OF PLUMBING FIXTURES AND ASSOCIATED PIPING FOR INTERIOR CONDO WORK.
On file for this project
29 documents · 2 drawing sheets
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 2 drawing sheets
MODIFICATION TO EXISTING HVAC, UNITS, DUCTWORK AND ALL ASSOCIATED PIPING.
On file for this project
27 documents · 6 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 317p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
MODIFICATION OF PLUMBING FIXTURES AND ASSOCIATED PIPING FOR INTERIOR CONDO WORK.
On file for this project
29 documents · 1 drawing sheet
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 2 drawing sheets
MODIFICATION TO EXISTING HVAC, UNITS, DUCTWORK AND ALL ASSOCIATED PIPING.
On file for this project
27 documents · 4 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 309p · 5 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 2 drawing sheets
MODIFICATION TO EXISTING HVAC, UNITS, DUCTWORK AND ALL ASSOCIATED PIPING.
On file for this project
27 documents · 3 drawing sheets
MODIFICATION TO EXISTING PLUMBING FIXTURES AND ALL ASSOCIATED PIPING.
On file for this project
23 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 2910p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Modifications to existing Sprinkler/Standpipe system related to Exhale Spa build-out.
On file for this project
4 documents · 1 drawing sheet
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 2 drawing sheets
MODIFICATION TO EXISTING HVAC, UNITS, DUCTWORK AND ALL ASSOCIATED PIPING.
On file for this project
27 documents · 5 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 288p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 2 drawing sheets
MODIFICATION TO EXISTING HVAC, UNITS, DUCTWORK AND ALL ASSOCIATED PIPING.
On file for this project
27 documents · 4 drawing sheets
MODIFICATION TO EXISTING PLUMBING FIXTURES AND ALL ASSOCIATED PIPING.
On file for this project
23 documents · 4 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 2710p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 2 drawing sheets
MODIFICATION TO EXISTING HVAC, UNITS, DUCTWORK AND ALL ASSOCIATED PIPING.
On file for this project
27 documents · 6 drawing sheets
MODIFICATION TO EXISTING PLUMBING FIXTURES AND ALL ASSOCIATED PIPING.
On file for this project
23 documents · 3 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 269p · 4 filings · 20 docs
DMFire ProtectionMechanicalPlumbingStructural
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 2 drawing sheets
MODIFICATION TO EXISTING HVAC, UNITS, DUCTWORK AND ALL ASSOCIATED PIPING.
On file for this project
27 documents · 5 drawing sheets
MODIFICATION TO EXISTING PLUMBING FIXTURES AND ALL ASSOCIATED PIPING.
On file for this project
23 documents · 3 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 256p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 2 drawing sheets
MODIFICATION TO EXISTING HVAC, UNITS, DUCTWORK AND ALL ASSOCIATED PIPING.
On file for this project
27 documents · 4 drawing sheets
MODIFICATION TO EXISTING PLUMBING FIXTURES AND ALL ASSOCIATED PIPING.
On file for this project
23 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 249p · 6 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
REMOVE AND INSTALL MECHANICAL HVAC DUCTWORK AND EQUIPMENT PER PLANS.
On file for this project
12 documents · 2 drawing sheets
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 2 drawing sheets
MODIFICATION TO EXISTING HVAC, UNITS, DUCTWORK AND ALL ASSOCIATED PIPING.
On file for this project
27 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 2315p · 8 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
INSTALLATION OF HORIZONTAL NETTING AS PER PLANS. HORIZONTAL NETTING SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
6 documents · 1 drawing sheet
REMOVE AND INSTALL INTERIOR NON-LOAD BEARING PARTITIONS AND HUNG CEILING RELATED TO 23RD FLOOR RENOVATION.
On file for this project
5 documents · 3 drawing sheets
REMOVE AND INSTALL MECHANICAL HVAC DUCTWORK AND EQUIPMENT PER PLANS.
On file for this project
12 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 2214p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 2 drawing sheets
MODIFICATION TO EXISTING HVAC, UNITS, DUCTWORK AND ALL ASSOCIATED PIPING.
On file for this project
27 documents · 5 drawing sheets
MODIFICATION TO EXISTING PLUMBING FIXTURES AND ALL ASSOCIATED PIPING.
On file for this project
23 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 217p · 5 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 2 drawing sheets
MODIFICATION TO EXISTING HVAC, UNITS, DUCTWORK AND ALL ASSOCIATED PIPING.
On file for this project
27 documents · 5 drawing sheets
MODIFICATION TO EXISTING PLUMBING FIXTURES AND ALL ASSOCIATED PIPING.
On file for this project
23 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 207p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 2 drawing sheets
MODIFICATION TO EXISTING HVAC, UNITS, DUCTWORK AND ALL ASSOCIATED PIPING.
On file for this project
27 documents · 4 drawing sheets
MODIFICATION TO EXISTING PLUMBING FIXTURES AND ALL ASSOCIATED PIPING.
On file for this project
23 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 194p · 5 filings · 20 docs
MechanicalPlumbingStructural
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 1 drawing sheet
MODIFICATION TO EXISTING HVAC, UNITS, DUCTWORK AND ALL ASSOCIATED PIPING.
On file for this project
27 documents · 3 drawing sheets
MODIFICATION TO EXISTING PLUMBING FIXTURES AND ALL ASSOCIATED PIPING.
On file for this project
23 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 188p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 3 drawing sheets
MODIFICATION TO EXISTING HVAC, UNITS, DUCTWORK AND ALL ASSOCIATED PIPING.
On file for this project
27 documents · 5 drawing sheets
MODIFICATION TO EXISTING PLUMBING FIXTURES AND ALL ASSOCIATED PIPING.
On file for this project
23 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 176p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 2 drawing sheets
MODIFICATION TO EXISTING HVAC, UNITS, DUCTWORK AND ALL ASSOCIATED PIPING.
On file for this project
27 documents · 4 drawing sheets
MODIFICATION TO EXISTING PLUMBING FIXTURES AND ALL ASSOCIATED PIPING.
On file for this project
23 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 166p · 5 filings · 20 docs
DMFire ProtectionMechanicalPlumbingStructural
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 2 drawing sheets
MODIFICATION TO EXISTING HVAC, UNITS, DUCTWORK AND ALL ASSOCIATED PIPING.
On file for this project
27 documents · 4 drawing sheets
MODIFICATION TO EXISTING PLUMBING FIXTURES AND ALL ASSOCIATED PIPING.
On file for this project
23 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 159p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 2 drawing sheets
MODIFICATION TO EXISTING HVAC, UNITS, DUCTWORK AND ALL ASSOCIATED PIPING.
On file for this project
27 documents · 5 drawing sheets
MODIFICATION TO EXISTING PLUMBING FIXTURES AND ALL ASSOCIATED PIPING.
On file for this project
23 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 1412p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 2 drawing sheets
MODIFICATION TO EXISTING HVAC, UNITS, DUCTWORK AND ALL ASSOCIATED PIPING.
On file for this project
27 documents · 5 drawing sheets
MODIFICATION TO EXISTING PLUMBING FIXTURES AND ALL ASSOCIATED PIPING.
On file for this project
23 documents · 4 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 133p · 5 filings · 20 docs
MechanicalPlumbingStructural
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 1 drawing sheet
MODIFICATION TO EXISTING HVAC, UNITS, DUCTWORK AND ALL ASSOCIATED PIPING.
On file for this project
27 documents · 2 drawing sheets
MODIFICATION TO EXISTING PLUMBING FIXTURES AND ALL ASSOCIATED PIPING.
On file for this project
23 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 128p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 2 drawing sheets
MODIFICATION TO EXISTING HVAC, UNITS, DUCTWORK AND ALL ASSOCIATED PIPING.
On file for this project
27 documents · 5 drawing sheets
MODIFICATION TO EXISTING PLUMBING FIXTURES AND ALL ASSOCIATED PIPING.
On file for this project
23 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 117p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 2 drawing sheets
MODIFICATION TO EXISTING HVAC, UNITS, DUCTWORK AND ALL ASSOCIATED PIPING.
On file for this project
27 documents · 4 drawing sheets
MODIFICATION TO EXISTING PLUMBING FIXTURES AND ALL ASSOCIATED PIPING.
On file for this project
23 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 107p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 2 drawing sheets
MODIFICATION TO EXISTING HVAC, UNITS, DUCTWORK AND ALL ASSOCIATED PIPING.
On file for this project
27 documents · 4 drawing sheets
MODIFICATION TO EXISTING PLUMBING FIXTURES AND ALL ASSOCIATED PIPING.
On file for this project
23 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 911p · 7 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 2 drawing sheets
Installation of mechanical, HVAC units and related ductwork for Condo Interior work.
On file for this project
21 documents · 1 drawing sheet
MODIFICATION TO EXISTING HVAC, UNITS, DUCTWORK AND ALL ASSOCIATED PIPING.
On file for this project
27 documents · 5 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 89p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 2 drawing sheets
MODIFICATION TO EXISTING HVAC, UNITS, DUCTWORK AND ALL ASSOCIATED PIPING.
On file for this project
27 documents · 5 drawing sheets
MODIFICATION TO EXISTING PLUMBING FIXTURES AND ALL ASSOCIATED PIPING.
On file for this project
23 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 710p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 2 drawing sheets
MODIFICATION TO EXISTING HVAC, UNITS, DUCTWORK AND ALL ASSOCIATED PIPING.
On file for this project
27 documents · 6 drawing sheets
MODIFICATION TO EXISTING PLUMBING FIXTURES AND ALL ASSOCIATED PIPING.
On file for this project
23 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 68p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 2 drawing sheets
MODIFICATION TO EXISTING HVAC, UNITS, DUCTWORK AND ALL ASSOCIATED PIPING.
On file for this project
27 documents · 5 drawing sheets
MODIFICATION TO EXISTING PLUMBING FIXTURES AND ALL ASSOCIATED PIPING.
On file for this project
23 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 512p · 7 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 2 drawing sheets
MODIFICATION TO EXISTING HVAC, UNITS, DUCTWORK AND ALL ASSOCIATED PIPING.
On file for this project
27 documents · 5 drawing sheets
MODIFICATION TO EXISTING PLUMBING FIXTURES AND ALL ASSOCIATED PIPING.
On file for this project
23 documents · 3 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 415p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Installation of new concrete topping slab, steps and ramps on styrofoam. Work at Cellar, 1st, 3rd and 4th floors including new steel frame for support of a new hood above 1st floor, new slab openings at 3rd and 4th floor, new grease trap@ Cellar.
On file for this project
18 documents · 1 drawing sheet
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 2 drawing sheets
MODIFICATION TO EXISTING PLUMBING FIXTURES AND ALL ASSOCIATED PIPING.
On file for this project
23 documents · 3 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 39p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 2 drawing sheets
MODIFICATION TO EXISTING PLUMBING FIXTURES AND ALL ASSOCIATED PIPING.
On file for this project
23 documents · 3 drawing sheets
MODIFICATION TO EXISTING PLUMBING FIXTURES AND ALL ASSOCIATED PIPING.
On file for this project
29 documents · 3 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 28p · 5 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 1 drawing sheet
Installation of plumbing fixtures for new bathroom in Lobby Public Space. Replace fixtures @ Mezzanine level. Install new sanitary piping @ cellar
On file for this project
34 documents · 2 drawing sheets
MODIFICATION TO EXISTING PLUMBING FIXTURES AND ALL ASSOCIATED PIPING.
On file for this project
23 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 119p · 13 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Installation of new concrete topping slab, steps and ramps on styrofoam. Work at Cellar, 1st, 3rd and 4th floors including new steel frame for support of a new hood above 1st floor, new slab openings at 3rd and 4th floor, new grease trap@ Cellar.
On file for this project
18 documents · 2 drawing sheets
Installation of plumbing fixtures for new bathroom in Lobby Public Space. Replace fixtures @ Mezzanine level. Install new sanitary piping @ cellar
On file for this project
34 documents · 3 drawing sheets
Install new bathroom exhaust system for bathroom. Remove and install exhaust ductwork, outlets, diffusers related to Public spaces including 1st fl. Restaurant, 3rd fl. Ballroom, 4th floor and Roof.
On file for this project
33 documents · 3 drawing sheets
Latest 3 of 8 filings on this floor.
Mezzanine4p · 1 filing · 20 docs
Mechanical
Install new bathroom exhaust system for bathroom. Remove and install exhaust ductwork, outlets, diffusers related to Public spaces including 1st fl. Restaurant, 3rd fl. Ballroom, 4th floor and Roof.
On file for this project
33 documents · 4 drawing sheets
Cellar24p · 13 filings · 20 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalPlumbingStructural
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 1 drawing sheet
Installation of plumbing fixtures for new bathroom in Lobby Public Space. Replace fixtures @ Mezzanine level. Install new sanitary piping @ cellar
On file for this project
34 documents · 6 drawing sheets
MODIFICATION TO EXISTING PLUMBING FIXTURES AND ALL ASSOCIATED PIPING.
On file for this project
23 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Sub-Cellar47p · 14 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Structural reinforcements for renovation related to Base Building Landlord Work including the installation of new floor framing at Sub-Cellar 1 supported by new steel posts at Sub-Cellar 2
On file for this project
61 documents · 10 drawing sheets
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents · 4 drawing sheets
MODIFICATION TO EXISTING HVAC, UNITS, DUCTWORK AND ALL ASSOCIATED PIPING.
On file for this project
27 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.