Whole building & multi-floor projectsHyatt Hotels7 filings
MODIFICATION OF PLUMBING FIXTURES AND ASSOCIATED PIPING FOR INTERIOR CONDO WORK.
On file for this project
29 documents · 2 drawing sheets
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
On file for this project
23 documents
Installation of mechanical, HVAC units and related ductwork for Condo Interior work.
On file for this project
21 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
RoofParker57, LLC7p · 6 filings · 20 docs
ArchitectureCivilDMEquipmentFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe
DEMOLISH (2) EXISTING HVAC UNITS LOCATED ON FOURTH FLOOR ROOF TO RESOLVE FDNY SUMMONS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
3 documents · 1 drawing sheet
This Application is Filed For a Temporary Use Permit for Model Room Penthouse A pursuant to section AC28-11 and Buildings Bulletin 2010-002. There is no construction work filed.
On file for this project
4 documents · 1 drawing sheet
skylight protection installed per plans, no change in use, egress or occupancy
On file for this project
6 documents
Latest 3 of 6 filings on this floor.
PenthouseParker57, LLC1 filing · 4 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
This Application is Filed For a Temporary Use Permit for Model Room Penthouse A pursuant to section AC28-11 and Buildings Bulletin 2010-002. There is no construction work filed.
On file for this project
4 documents
Floor 34Horizontal netting installation1p · 1 filing
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe
INSTALLATION OF HORIZONTAL NETTING AS PER PLANS. HORIZONTAL NETTING SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
6 documents · 1 drawing sheet
Floor 33
Floor 32Tcpny Owner, LLC6p · 2 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe
MODIFY TOILER EXHAUST SYSTEM AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
18 documents · 12 drawing sheets
MODIFICATION TO EXISTING SPRIKLER SYSTEM FOR SUITE CONVERSION RENOVATION AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
4 documents
Floor 31
Floor 30Tcpny Owner, LLC5p · 2 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe
MODIFY TOILER EXHAUST SYSTEM AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
18 documents · 12 drawing sheets
MODIFICATION TO EXISTING SPRIKLER SYSTEM FOR SUITE CONVERSION RENOVATION AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
4 documents
Floor 29Tcpny Owner, LLC1p · 2 filings · 20 docs
DMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe
MODIFY TOILER EXHAUST SYSTEM AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
18 documents · 12 drawing sheets
MODIFICATION TO EXISTING SPRIKLER SYSTEM FOR SUITE CONVERSION RENOVATION AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
4 documents
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23Gfi Development CO.6p · 6 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Remove and Install interior non load bearing partitions and doors per plans filed.
On file for this project
4 documents
FILING FOR PLUMBING DEMOLITION OF BATHROOMS AND LAUNDRY ON 23RD FLOOR.
On file for this project
5 documents
INSTALLATION OF HORIZONTAL NETTING AS PER PLANS. HORIZONTAL NETTING SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 22Tcpny Owner, LLC5p · 1 filing · 18 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe
MODIFY TOILER EXHAUST SYSTEM AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
18 documents · 12 drawing sheets
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5Tcpny Owner, LLC2p · 2 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe
MODIFY TOILER EXHAUST SYSTEM AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
18 documents · 12 drawing sheets
MODIFICATION TO EXISTING SPRIKLER SYSTEM FOR SUITE CONVERSION RENOVATION AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
4 documents
Floor 4Exhale3p · 3 filings · 20 docs
ArchitectureFire ProtectionMechanicalStructural
Issued Permit Scope
Mechanical Systems · Sprinklers · Standpipe
Installation of Plumbing fixtures and piping related to Exhale Spa build-out.
On file for this project
13 documents
Install new bathroom exhaust system for bathroom. Remove and install exhaust ductwork, outlets, diffusers related to Public spaces including 1st fl. Restaurant, 3rd fl. Ballroom, 4th floor and Roof.
On file for this project
33 documents · 2 drawing sheets
Modification to existing Plumbing System related to the 2nd and 3rd floor meeting room renovations. No change in occupancy, use or egress.
On file for this project
18 documents · 5 drawing sheets
Floor 3Gfi Development CO.7p · 3 filings · 20 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
Mechanical Systems · Sprinklers · Standpipe
Install new bathroom exhaust system for bathroom. Remove and install exhaust ductwork, outlets, diffusers related to Public spaces including 1st fl. Restaurant, 3rd fl. Ballroom, 4th floor and Roof.
On file for this project
33 documents · 2 drawing sheets
Modification to existing Plumbing System related to the 2nd and 3rd floor meeting room renovations. No change in occupancy, use or egress.
On file for this project
18 documents · 5 drawing sheets
No filed description on record for this project.
On file for this project
6 documents · 4 drawing sheets
Floor 2Parker57, LLC2p · 2 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe
Installation of plumbing fixtures for new bathroom in Lobby Public Space. Replace fixtures @ Mezzanine level. Install new sanitary piping @ cellar
On file for this project
34 documents · 2 drawing sheets
Modification to existing Plumbing System related to the 2nd and 3rd floor meeting room renovations. No change in occupancy, use or egress.
On file for this project
18 documents · 5 drawing sheets
Floor 1Exhale, Parker 57 LLC Dba Thompson Central Park28p · 21 filings · 20 docs
ArchitectureCivilDMEquipmentFire AlarmFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sidewalk Shed · Sprinklers · Standpipe · Structural
Installation of Plumbing fixtures and piping related to Exhale Spa build-out.
On file for this project
13 documents
Modifications to existing Sprinkler/Standpipe system related to Exhale Spa build-out.
On file for this project
4 documents
Construction interior partitions and hung ceilings related to Exhale Spa build out.
On file for this project
9 documents · 1 drawing sheet
Latest 3 of 21 filings on this floor.
MezzanineParker57, LLC4p · 2 filings · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing
Installation of plumbing fixtures for new bathroom in Lobby Public Space. Replace fixtures @ Mezzanine level. Install new sanitary piping @ cellar
On file for this project
34 documents
Install new bathroom exhaust system for bathroom. Remove and install exhaust ductwork, outlets, diffusers related to Public spaces including 1st fl. Restaurant, 3rd fl. Ballroom, 4th floor and Roof.
On file for this project
33 documents · 4 drawing sheets
CellarParker 57 LLC Dba Thompson Central Park21p · 12 filings · 20 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
REINFORCED CONCRETE STRUCTURE GARAGE REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 2 drawing sheets
Structural reinforcements for renovation related to Base Building Landlord Work including the installation of new floor framing at Sub-Cellar 1 supported by new steel posts at Sub-Cellar 2
On file for this project
61 documents · 3 drawing sheets
Modification to existing Sprinkler/Standpipe system in conjunction of renovation for Base Building Landlord Work fit-out.
On file for this project
11 documents
Latest 3 of 12 filings on this floor.
Sub-CellarExhale, Parker 57 LLC Dba Thompson Central Park36p · 11 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Installation of Plumbing fixtures and piping related to Exhale Spa build-out.
On file for this project
13 documents · 7 drawing sheets
Modifications to existing Sprinkler/Standpipe system related to Exhale Spa build-out.
On file for this project
4 documents · 2 drawing sheets
REINFORCED CONCRETE STRUCTURE GARAGE REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 4 drawing sheets
Latest 3 of 11 filings on this floor.
Site & exteriorGfi Development CO.9 filings · 20 docs
ArchitectureCivilElectricalEquipmentGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
Construction Fence · Protection and Mechanical Methods · Sidewalk Shed · Supported Scaffold
INSTALLATION OF SIDEWALK SHED FOR PEDESTRIAN SAFETY DURING CONSTRUCTION. SIDEWALK SHED SHALL COMPLY WITH NYCC 2014 CHAPTER 33 . NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
6 documents · 12 drawing sheets
INSTALLATION OF HORIZONTAL NETTING AS PER PLANS. HORIZONTAL NETTING SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
6 documents · 12 drawing sheets
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents · 5 drawing sheets