← Back
BuildNYC
Five to six families
119 WOODBINE STREET
BROOKLYN · BIN 3076607
💬 Discuss this project
1910Year Built
4Stories
C2Building Class
R6Zoning
3,980 sfGross Floor Area
6Units
Rent Stabilized13 Active Violations ▸FDNY Report ↗
Five to six families · Owner of record: 111 Woodbine Qozb Partners · 1,875 sf lot · 2.12 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofFire sprinkler system installation49p · 3 filings · 20 docs
Bulkhead6p · 3 filings · 20 docs
Floor 4Fire sprinkler system installation55p · 4 filings · 20 docs
Floor 3Fire sprinkler system installation56p · 4 filings · 20 docs
Floor 2Fire sprinkler system installation55p · 4 filings · 20 docs
Floor 1Fire sprinkler system installation53p · 4 filings · 20 docs
CellarFire sprinkler system installation51p · 4 filings · 20 docs
Basement40p · 1 filing · 20 docs
Site & exteriorFire sprinkler system installation7p · 3 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
111 Woodbine Qozb Partners4707/08/2026
Select or Enter103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/25/2022$1.2M—Private party → 111 Woodbine Qozb Partners$314/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LWL Associates807/10/2024
Arquitectura Varela103/19/2023
Yan Engineering201/05/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Prime Zone Building Consulting903/21/2026
Build Team203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KorkGeneral Contractor1907/08/2026
KorkScaffold207/08/2026
Korkspecialty_contractor203/21/2026
Korkspecialty_contractor103/21/2026
Dependable MechanicalFire Protection107/08/2026
Lintech ElectricElectrical103/22/2026
EH Plumbing & HeatingPlumbing107/08/2026
Deep FormationScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Hsu & Associates8025607/10/2024
Building Lifecycle
11/20/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
06/11/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
11/27/2024
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
11/07/2024
§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE…
HPD violation · open
07/10/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
CONVERT EXISTING TWO (2) DWELLING UNITS (3 STORY BRICK BUILDING) TO SIX (6) DWELLING UNITS. (4 STORY BUILDING); PROPOSED ONE (1) STORY VERTICAL & HORIZONTAL ENLARGEMENT W/ BULKHEAD; OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
B00760717-P2
95 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offKork04/09/2024
DOB NOWSprinklersSigned-offDependable Mechanical05/24/2023
DOB NOWPlumbingSigned-offEH Plumbing & Heating05/18/2023
DOB NOWGeneral ConstructionPermit IssuedKork05/12/2023
DOB NOWStructuralSigned-offKork03/20/2023
DOB NOWSidewalk ShedSigned-offDeep Formation03/20/2023
DOB NOWConstruction FenceSigned-offKork03/20/2023
DOB NOWGeneral ConstructionPermit IssuedKork03/20/2023
DOB NOWEarth WorkSigned-offKork03/20/2023
DOB NOWFoundationSigned-offKork03/09/2023
DOB NOWGeneral ConstructionPermit IssuedKork03/08/2023
DOB NOWStructuralSigned-offKork03/08/2023
DOB NOWConstruction FenceSigned-offKork02/21/2023
1 project · most recent 01/25/2024
General Wiring
FiledStatusContractorScope
01/25/2024CompleteLintech ElectricGeneral Wiring
1 project · most recent 07/10/2024
Steel Masonry
FiledStatusContractorScope
07/10/2024Permit IssuedKorkSteel, Masonry
1 project · most recent 07/10/2024
Earthwork
FiledStatusContractorScope
07/10/2024Permit IssuedKorkEarthwork
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/28/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/09/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/22/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/18/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/18/2023Fail-Final CND-Occupancy InspectionFailView ↗
09/20/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/31/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
03/20/2024Fire-Resistant Penetrations and Joints—special
03/20/2024Shutoff dampers—energy_progress
03/20/2024HVAC-R and service water piping design and insulation—energy_progress
03/20/2024HVAC-R and service water heating system controls—energy_progress
03/20/2024HVAC-R and service water heating equipment—energy_progress
03/20/2024Final—progress
03/20/2024Energy Code Compliance Inspections—progress
03/20/2024Mechanical Systems—special
03/20/2024Heating Systems—special
09/07/2023HVAC-R and service water heating system controlsChih Hsuenergy_progress
09/07/2023HVAC-R and service water piping design and insulationChih Hsuenergy_progress
09/07/2023HVAC-R and service water heating equipmentChih Hsuenergy_progress
09/07/2023Energy Code Compliance InspectionsChih Hsuprogress
12/16/2022Subgrade InspectionsChih Hsuspecial
11/09/2022Construction Operations Influencing Adjacent StructuresChih Hsuspecial
09/20/2022Structural Stability – Alterations of existing buildingsChih Hsuspecial
09/20/2022Excavations - Sheeting, Shoring, and BracingChih Hsuspecial
09/20/2022Concrete - Cast-In-PlaceChih Hsuspecial
09/20/2022Subsurface Investigations (Borings/Test Pits)INDARDEO PARBHUNATHspecial
09/20/2022Sprinkler SystemsChih Hsuspecial
08/29/2022FinalChih Hsuprogress
08/29/2022Footing and FoundationChih Hsuprogress
100 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account