← Back
Elevator apt, fireproof with stores
201 EAST 69 STREET
💬 Discuss this project
1927Year Built
14Stories
D6Building Class
C1-9Zoning
330,000 sfGross Floor Area
309Units
LL97 CoveredRent Stabilized1 Open Violation ▸FISP: SWARMPFDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: 201 EAST 69 LLC · 20,115 sf lot · 16.41 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire ProtectionOther
Roof5p · 5 filings · 18 docs
Floor 23p · 3 filings · 18 docs
Floor 115p · 8 filings · 20 docs
Mezzanine3p · 1 filing · 10 docs
Cellar1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
201 EAST 695303/22/2026
201 E 69TH LLC, MICHAEL B103/22/2026
201 EAST 69 LLC MICHAEL B203/22/2026
ATLAS CONSTRUCTION LLC103/22/2026
HENEGAN CONSTRUCTION203/22/2026
TO OWNER OF 201 EAST 69 S303/22/2026
ROCKROSE DEVELOPEMENT2203/22/2026
DEVEL CORP103/22/2026
DEVEL CORP ROCK ROSE203/22/2026
201 EAST 69TH2203/21/2026
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TROY CONTRACTOR LLCGeneral Contractor603/21/2026
B.R. FRIES & ASSOCIATES LLCGeneral Contractor507/08/2026
ATLAS CONSTRUCTION OF NYGeneral Contractor403/21/2026
NEPTUNE SIGNS AWNINGSScaffold407/08/2026
MCCORMACK CONTRACTING INC.General Contractor307/08/2026
JC CONSULTING & MANAGEMENTGeneral Contractor303/21/2026
ULTIMATE SIGNS DESIGNSScaffold307/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor307/08/2026
HORIZON RETAIL CONSTRUCTIGeneral Contractor307/08/2026
RIDGE CONSTRUCTION CORPGeneral Contractor207/08/2026
CONNOR CONSTRUCTION LLCGeneral Contractor207/08/2026
EAGLE SCAFFOLDING SVCS INCGeneral Contractor203/21/2026
FULL FORCE CONTRACTING LLGeneral Contractor203/21/2026
OVERLAND CONTRACTING INCGeneral Contractor207/08/2026
MAUCERI SIGNScaffold207/08/2026
SCHIMENTI CONSTRUCTION COGeneral Contractor203/21/2026
TRISTATE PLBG SVCS CORPPlumbing107/08/2026
ACTIVE SIGNSScaffold107/08/2026
NATIONAL SIGN LIGHTINGScaffold107/08/2026
ATMOS ELECTRIC SVCE CORPElectrical103/22/2026
UNITECH DESIGNScaffold107/08/2026
JSP ELECTL CNTNG CORPElectrical103/22/2026
STRIANO ELECTRIC CO., INCElectrical103/22/2026
ZITO, ROCCOElectrical103/21/2026
CAPITOL FIRE SPRINKLER COFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CODEGREEN510601/05/2026
GREGORY V. PEROTTO, P.E.947707/30/2024
THE EIPEL ENGINEERING GRO2714507/30/2024
LAURENCE G. JONES ARCHITE5560304/11/2024
RAAD7727104/11/2024
LEO Y LEE ASSOCIATES2481101/30/2024
S&S CONCRETE & SOIL TESTI1008203/24/2023
ELEVATED ENGINEERING PLLC3692102/01/2023
JOSEPH BOTTA, PE, PC1139212/21/2022
MILROSE CONSULTANTS LLC2003210/25/2022
Building Lifecycle
All (300)Filed (68)Permit Issued (52)Signed Off (51)Facade (FISP) (15)Violation (53)Inspection (21)Objection (10)Special Inspection (30)
02/06/2026
Signed off — Alteration
Plumbing: Modifications to the existing plumbing system on the (1st Floor- Figs) as per plans. No change to use, egress or occupancy.
M01281325-I1
01/27/2026
Signed off — Alteration
M01167193-I1
01/27/2026
Cycle 10 facade report submitted
01/27/2026
Cycle 10 facade report signed — SAFE
01/23/2026
Cycle 10 facade inspection completed
01/21/2026
Violation issued (FDNY_NOV, closed)
01/20/2026
Violation issued (FDNY_NOV, closed)
01/15/2026
Permit issued — Suspended Scaffold
M01167193-I1-SC
01/14/2026
Signed off — Alteration
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the (1st floor- Figs) as per plans. No change to use, egress or occupancy.
M01281319-I1
01/14/2026
Signed off — Alteration
Mechanical: Modifications to the existing HVAC system on the (1st Floor- Fig) as per plans. No change to use, egress or occupancy.
M01281324-I1
01/14/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/07/2026
Signed off — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN FOR FIGS.
M01307143-I1
01/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
HATIM ELSAID
01/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
HATIM ELSAID
01/06/2026
Special inspection requirement — Post-installed Anchors
HATIM ELSAID
01/05/2026
Filed — Alteration
Plumbing: Modifications to the existing plumbing system on the (1st Floor- Figs) as per plans. No change to use, egress or occupancy.
M01281325-P1
11/25/2025
Special inspection requirement — Post-installed Anchors
HATIM ELSAID
11/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
HATIM ELSAID
11/25/2025
Special inspection requirement — Tenant Protection Plan Compliance
HATIM ELSAID
11/13/2025
Permit issued — Sign
M01307143-I1-SG
11/11/2025
Filed — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN FOR FIGS.
M01307143-I1
10/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/22/2025
Special inspection requirement — Final
SALVATOR CARADONNA
10/03/2025
Permit issued — Mechanical Systems
M01281324-I1-MS
09/29/2025
Permit issued — Plumbing
M01281325-I1-PL
09/19/2025
Permit issued — General Construction
M01281319-I1-GC
09/16/2025
Filed — Alteration
Plumbing: Modifications to the existing plumbing system on the (1st Floor- Figs) as per plans. No change to use, egress or occupancy.
M01281325-I1
09/16/2025
Filed — Alteration
Mechanical: Modifications to the existing HVAC system on the (1st Floor- Fig) as per plans. No change to use, egress or occupancy.
M01281324-I1
09/15/2025
Filed — Alteration
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the (1st floor- Figs) as per plans. No change to use, egress or occupancy.
M01281319-I1
09/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
HATIM ELSAID
09/10/2025
Special inspection requirement — Energy Code Compliance Inspections
HATIM ELSAID
09/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
HATIM ELSAID
09/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
HATIM ELSAID
09/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
HATIM ELSAID
09/03/2025
Special inspection requirement — Mechanical Systems
HATIM ELSAID
09/03/2025
Special inspection requirement — Tenant Protection Plan Compliance
HATIM ELSAID
09/03/2025
Special inspection requirement — Final
HATIM ELSAID
09/03/2025
Special inspection requirement — Shutoff dampers
HATIM ELSAID
09/03/2025
Special inspection requirement — Final
HATIM ELSAID
09/03/2025
Special inspection requirement — Maintenance information
HATIM ELSAID
09/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
HATIM ELSAID
09/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
HATIM ELSAID
01/30/2025
Signed off — Alteration
ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01031973-I1
01/30/2025
Signed off — Alteration
M01031967-I1
01/14/2025
Filed — Alteration
M01167193-I1
01/13/2025
Signed off — Alteration
installation of suspended scaffold for facade work and inspection
M00997295-I1
09/16/2024
Violation issued (HPD, closed)
C
08/20/2024
Signed off — Alteration
M01009097-I1
08/20/2024
Signed off — Alteration
#8827 - INSTALLATION OF NON-RESIDENTIAL PLUMBING FIXTURES FOR RETAIL ESTABLISHMENT (Warby Parker). NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M01009106-I1
08/14/2024
Signed off — Alteration
M01009093-I1
08/12/2024
Signed off — Alteration
8827 - Structural work in Warby parker space. No change in egress, use, or occupancy.
M01009112-I1
08/08/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/08/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/30/2024
Filed — Alteration
8827 - Structural work in Warby parker space. No change in egress, use, or occupancy.
M01009112-P2
07/30/2024
Special inspection requirement — Final
Bix Ellenbecker
07/30/2024
Special inspection requirement — Structural Cold-Formed Steel
Bix Ellenbecker
07/30/2024
Special inspection requirement — Structural Steel - Details
Bix Ellenbecker
07/30/2024
Special inspection requirement — Tenant Protection Plan Compliance
Gregory Perotto
07/26/2024
Filed — Alteration
#8827 - INSTALLATION OF NON-RESIDENTIAL PLUMBING FIXTURES FOR RETAIL ESTABLISHMENT (Warby Parker). NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M01009106-P1
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offSKYLINE RESTORATION INC01/15/2026
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC11/13/2025
DOB NOWMechanical SystemsSigned-offCONNOR CONSTRUCTION LLC10/03/2025
DOB NOWPlumbingSigned-offHERTLER NADILE P & H, INC09/29/2025
DOB NOWGeneral ConstructionSigned-offCONNOR CONSTRUCTION LLC09/19/2025
DOB NOWPlumbingSigned-offMETROTECH MECHANICAL CORP06/13/2024
DOB NOWPlumbingSigned-offP.H. WORKS INC05/10/2024
DOB NOWSignSigned-offMAUCERI SIGN CO., INC05/02/2024
DOB NOWSignSigned-offMAUCERI SIGN CO., INC05/02/2024
DOB NOWMechanical SystemsSigned-offHORIZON RETAIL CONSTRUCTI05/02/2024
DOB NOWGeneral ConstructionSigned-offHORIZON RETAIL CONSTRUCTI04/18/2024
DOB NOWMechanical SystemsSigned-offMCCORMACK CONTRACTING INC04/18/2024
DOB NOWStructuralSigned-offHORIZON RETAIL CONSTRUCTI04/18/2024
DOB NOWConstruction FenceSigned-offMCCORMACK CONTRACTING INC04/09/2024
DOB NOWGeneral ConstructionSigned-offMCCORMACK CONTRACTING INC03/19/2024
DOB NOWSuspended ScaffoldPermit IssuedATLAS CONSTR OF NY , INC02/06/2024
DOB NOWAntennaSigned-offCOMCELL CONSTRUCTION CORP03/07/2023
DOB NOWSprinklersSigned-offCITYWIDE PLBG, HTG &SPRKL02/01/2023
DOB NOWStructuralSigned-offB.R. FRIES & ASSOCIATES L01/26/2023
DOB NOWMechanical SystemsSigned-offB.R. FRIES & ASSOCIATES L01/26/2023
DOB NOWGeneral ConstructionSigned-offB.R. FRIES & ASSOCIATES L01/26/2023
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC09/26/2022
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC09/22/2022
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC08/24/2022
DOB NOWGeneral ConstructionSigned-offJC CONSULTING & MANAGEME*07/07/2022
DOB NOWAntennaSigned-offOVERLAND CONTRACTING INC04/27/2022
DOB NOWSignSigned-offDESTHERS, JOSEPH01/14/2022
DOB NOWSignSigned-offDESTHERS, JOSEPH01/13/2022
DOB NOWSignSigned-offDESTHERS, JOSEPH01/13/2022
DOB NOWGeneral ConstructionSigned-offATLAS CONSTRUCTION OF NY12/23/2021
DOB NOWSprinklersSigned-offSAFETY FIRE SPRINKLER CORP10/21/2021
DOB NOWPlumbingSigned-offMAROTTA & SON P&H CONTR C10/21/2021
DOB NOWMechanical SystemsSigned-offTROY CONTRACTOR LLC09/30/2021
DOB NOWGeneral ConstructionSigned-offTROY CONTRACTOR LLC09/30/2021
DOB NOWSignSigned-offUNITECH DESIGN INC09/23/2021
DOB NOWGeneral ConstructionSigned-offATLAS CONSTRUCTION OF NY08/26/2021
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC08/20/2021
DOB NOWSprinklersSigned-offCAPITOL FIRE SPRINKLER CO08/11/2021
DOB NOWPlumbingSigned-offFULTON PLBG & HTG CORP08/02/2021
DOB NOWMechanical SystemsSigned-offRIDGE CONSTRUCTION CORP07/29/2021
+ 60 more permits on file
25 projects · most recent 09/10/2026
General Wiring
FiledStatusContractorScope
09/10/2026Permit IssuedACCURATE ELEC'L CONTR'S CGeneral Wiring
11/18/2025CompletePROFF ELECTRICAL LLC—
09/24/2025CompleteDENNISON ELECTRIC CORPGeneral Wiring
07/25/2024CompleteREDGRAVE ELECTL MAINTNCEGeneral Wiring
06/11/2024CompleteT. MCCAFFREY-T. MCGOVERN—
06/09/2023CompleteACCURATE ELEC'L CONTR'S CGeneral Wiring
05/09/2023CompleteACCURATE ELEC'L CONTR'S CGeneral Wiring
05/07/2023CompleteABSOLUTE ELEC'L CONTRG OFGeneral Wiring
04/10/2023CompleteAWESOME ELECTL CONTNG INC1 meters, 1 new_meters
09/30/2022CompleteGEMINI ELECTRIC CO., INC.General Wiring
04/27/2022CompleteAPPROVED ELECTRIC CORP.General Wiring
04/08/2022CompleteACCURATE ELEC'L CONTR'S CGeneral Wiring
02/18/2022CompleteJOSEPH WEINSTEIN ELECTRIC—
02/18/2022CompleteJOSEPH WEINSTEIN ELECTRIC—
02/18/2022CompleteJOSEPH WEINSTEIN ELECTRIC—
▾Field Inspections (DOB CAP) — 21
DateTypeResultReport
01/14/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/08/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/19/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/06/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/23/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/20/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/19/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/18/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/12/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/11/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/03/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/29/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/24/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/22/2021Pass-Final Alt-1 -18 Month TCO UpdatePassView ↗
10/15/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/06/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/30/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/29/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 111
DateRequirementInspectorRole
01/06/2026Tenant Protection Plan ComplianceHATIM ELSAIDspecial
01/06/2026Fire-Resistant Penetrations and JointsHATIM ELSAIDspecial
01/06/2026Post-installed AnchorsHATIM ELSAIDspecial
11/25/2025Tenant Protection Plan ComplianceHATIM ELSAIDspecial
11/25/2025Fire-Resistant Penetrations and JointsHATIM ELSAIDspecial
11/25/2025Post-installed AnchorsHATIM ELSAIDspecial
10/22/2025FinalSALVATOR CARADONNAprogress
09/15/2025Tenant Protection Plan ComplianceHATIM ELSAIDspecial
09/10/2025Fire-Resistance Rated ConstructionHATIM ELSAIDprogress
09/10/2025Energy Code Compliance InspectionsHATIM ELSAIDprogress
09/10/2025Fire-Resistant Penetrations and JointsHATIM ELSAIDspecial
09/03/2025FinalHATIM ELSAIDprogress
09/03/2025FinalHATIM ELSAIDprogress
09/03/2025HVAC-R and service water piping design and insulationHATIM ELSAIDenergy_progress
09/03/2025HVAC-R and service water heating system controlsHATIM ELSAIDenergy_progress
09/03/2025Shutoff dampersHATIM ELSAIDenergy_progress
09/03/2025HVAC-R and service water heating equipmentHATIM ELSAIDenergy_progress
09/03/2025Maintenance informationHATIM ELSAIDenergy_progress
09/03/2025Mechanical SystemsHATIM ELSAIDspecial
09/03/2025Tenant Protection Plan ComplianceHATIM ELSAIDspecial
07/30/2024FinalBix Ellenbeckerprogress
07/30/2024Tenant Protection Plan ComplianceGregory Perottospecial
07/30/2024Structural Steel - DetailsBix Ellenbeckerspecial
07/30/2024Structural Cold-Formed SteelBix Ellenbeckerspecial
07/22/2024Post-installed AnchorsBix Ellenbeckerspecial
Latest 25 of 111.
▾Documents — 1,282 on file (BIS + DOB NOW)
▸Plans & Drawings68
▸DOB NOWPlans/Sketch56
09/03/2026M00505149-I1Request digital key ↗
09/03/2026M00521847-I1Request digital key ↗
09/03/2026M00521847-P1Request digital key ↗
Showing 3 of 56 on file for this type
▸DOB NOWPlans/Sketch - Sign5
09/05/2026M00164856-I1Request digital key ↗
09/05/2026M00164846-P1Request digital key ↗
09/05/2026M00164846-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/04/2026M00447404-I1Request digital key ↗
09/04/2026M00447404-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00407812-I1Request digital key ↗
09/04/2026M00444570-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00407791-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00135859-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Antenna1
09/04/2026M00347967-I1Request digital key ↗
▸Applications & Permits216
▸BISPLAN / WORK APPROVAL APPLICATION145
09/22/2025103453969Open ↗
08/29/2025100794758Open ↗
07/15/2025123459364Open ↗
Showing 3 of 145 on file for this type
▸BISWORK PERMIT APPLICATION69
10/22/2020140967489Open ↗
09/17/2020140890720Open ↗
11/15/2019123766825Open ↗
Showing 3 of 69 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLimited Alteration Application (LAA1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records3
▸BISZONING RESOLUTION DETERMINATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications328
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION126
03/02/2020123601566Open ↗
02/21/2020123601566Open ↗
02/07/2020123730016Open ↗
Showing 3 of 126 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature66
09/05/2026M00164846-P1Open ↗
09/05/2026M00164846-I1Open ↗
09/05/2026M00164833-I1Open ↗
Showing 3 of 66 on file for this type
▸DOB NOWProgress Inspector Seal & Signature37
09/28/2026M00588878-P1Open ↗
09/28/2026M00588878-P1Open ↗
09/02/2026M01009112-P2Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature35
09/28/2026M00588878-P1Open ↗
09/12/2026M00783604-P1Open ↗
09/12/2026M00783604-P1Open ↗
Showing 3 of 35 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST30
02/03/2020123670615Open ↗
01/08/2020123670642Open ↗
01/07/2020123670642Open ↗
Showing 3 of 30 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT20
10/22/2020140967489Open ↗
Showing 1 of 20 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/22/2020140967489Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
04/22/2020140890720Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/22/2020140967489Open ↗
▸Trade Schedules & Equipment74
▸BISEQUIPMENT USE PERMITS29
05/22/2020123766825Open ↗
05/22/2020123766825Open ↗
05/15/2020123766825Open ↗
Showing 3 of 29 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE22
01/08/2020123670642Open ↗
01/07/2020123670642Open ↗
Showing 2 of 22 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT7
05/22/2020123766825Open ↗
11/04/2019123508846Open ↗
Showing 2 of 7 on file for this type
▸BISSELF-CERT PLUMBING NOTICE6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSIGN HANGER CERTIFICATE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSPRINKLER/STANDPIPE ELECTRICAL LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection18
▸BISTenant Protection Plan and Notes13
04/22/2020140890720Open ↗
10/22/2020140967489Open ↗
Showing 2 of 13 on file for this type
▸DOB NOWTenant Protection Plan5
09/04/2026M00347967-I1Open ↗
Showing 1 of 5 on file for this type
▸Environmental & Asbestos98
▸DOB NOWDEP ACP-5: Asbestos Assessment Report57
09/05/2026M00164846-I1Open ↗
09/05/2026M00164846-P1Open ↗
09/05/2026M00164833-I1Open ↗
Showing 3 of 57 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)20
10/22/2020140967489Open ↗
05/11/2020140890720Open ↗
Showing 2 of 20 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Energy Compliance72
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS38
02/07/2020123730016Open ↗
02/06/2020123670642Open ↗
02/06/2020123670642Open ↗
Showing 3 of 38 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS17
01/26/2021140890720Open ↗
05/15/2020123766825Open ↗
02/07/2020123730016Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.6
09/03/2026M00588875-I1Open ↗
Showing 1 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
01/26/2021140890720Open ↗
05/15/2020123766825Open ↗
05/15/2020123766825Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/22/2020140967489Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY5
01/26/2021140890720Open ↗
05/15/2020123766825Open ↗
05/15/2020123766825Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)2
10/22/2020140967489Open ↗
09/17/2020140890720Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: PHOTOLUMINESCENCE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs124
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST61
03/09/2021123459364Open ↗
02/04/2021140967489Open ↗
01/26/2021140890720Open ↗
Showing 3 of 61 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE21
07/14/2025123459364Open ↗
06/23/2025123459364Open ↗
06/17/2025123459364Open ↗
Showing 3 of 21 on file for this type
▸BISADMINISTRATIVE OBJECTIONS20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION15
03/27/2025123459364Open ↗
04/06/2022123459364Open ↗
02/06/2020120856911Open ↗
Showing 3 of 15 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSUPERSEDING LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFINAL2
02/04/2021140967489Open ↗
09/17/2020140890720Open ↗
▸Cost, Insurance & Ownership93
▸BISCOST AFFIDAVIT91
01/26/2021140890720Open ↗
10/22/2020140967489Open ↗
05/15/2020123766825Open ↗
Showing 3 of 91 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
07/28/2022123459364Open ↗
02/03/2021140967489Open ↗
▸Filing & Intake Forms153
▸BISBOROUGH INTAKE FORM70
02/21/2020123601566Open ↗
02/21/2020120856911Open ↗
02/07/2020123730016Open ↗
Showing 3 of 70 on file for this type
▸BISEFILING COVER SHEET45
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 45 on file for this type
▸BISADDITIONAL INFORMATION36
07/15/2025123459364Open ↗
04/11/2025123459364Open ↗
06/24/2022123459364Open ↗
Showing 3 of 36 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
10/22/2020140967489Open ↗
04/22/2020140890720Open ↗
▸Other Documents15
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
03/03/2021123459364Open ↗
Showing 1 of 5 on file for this type
▸DOB NOWDHCR Document4
09/04/2026M00447404-P1Open ↗
09/04/2026M00447404-I1Open ↗
Showing 2 of 4 on file for this type
▸BISUnknown2
02/21/2020123601566Open ↗
02/21/2020123601566Open ↗
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWIRA Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type