← Back
BuildNYC
Other college and university
Peggy Plaza
1192 YORK AVENUE · BIN 1090765
💬 Discuss this project
1940Year Built
6Stories
W6Building Class
R9Zoning
1,200,000 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized43 Active Violations 29 unresolved · 14 paperwork only ▸FDNY Report ↗
Other college and university · 445,942 sf lot · 2.69 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
CellarRockefeller University Main Campus, Precision InstrumentatioUnder Construction12p · 4 filings · 14 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BR+A Consulting Engineers307/24/2026
Oculus Consulting Group106/23/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
The Rockefeller UniversityGeneral Contractor208/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Jaj Engineering930407/24/2026
Building Lifecycle
All (28)Filed (4)Permit Issued (2)Violation (10)Special Inspection (12)
08/20/2026
Permit issued — Mechanical Systems
M01399707-I1-MS
07/24/2026
Filed — Alteration
SPRINKLER MODIFICATIONS TO PIT INSTRUMENT SHOP/OFFICE (CELLAR "A FLOOR LEVEL") PLAZA BUILDING - ROCKEFELLER UNIVERSITY AS PER DRAWINGS. NO CHANGE IN, USE OCCUPANCY OR EGRESS
M01399711-I1
07/24/2026
Filed — Alteration
MECHANICAL MODIFICATIONS TO PIT INSTRUMENT SHOP/OFFICE (CELLAR "A FLOOR LEVEL") PLAZA BUILDING - ROCKEFELLER UNIVERSITY AS PER DRAWINGS. NEW AIR HANDLER UNIT. NEW EXHAUST FAN. MISC PIPING & DUCTWORK. NO CHANGE IN, USE OCCUPANCY OR EGRESS
M01399707-I1
07/24/2026
Filed — Alteration
PLUMBING MODIFICATIONS TO PIT INSTRUMENT SHOP/OFFICE (CELLAR "A FLOOR LEVEL") PLAZA BUILDING - ROCKEFELLER UNIVERSITY AS PER DRAWINGS. NO CHANGE IN, USE OCCUPANCY OR EGRESS
M01399686-I1
07/10/2026
Permit issued — General Construction
M01399670-I1-GC
06/23/2026
Filed — Alteration
RENOVATION TO PIT INSTRUMENT SHOP/OFFICE (CELLAR "A FLOOR LEVEL") PLAZA BUILDING - ROCKEFELLER UNIVERSITY. NEW NON-BEARING PARTITIONS. NEW SUSP CEILING IN SELECTED AREAS. NEW CABINETS, COUNTERS & FINISHES AS PER DWGS. NO CHANGE IN, USE OCCUPANCY OR EGRESS
M01399670-I1
05/11/2026
Special inspection requirement — Electrical motors and elevators
Joseph Jabour
05/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Jabour
05/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Jabour
05/08/2026
Special inspection requirement — Mechanical Systems
Joseph Jabour
05/08/2026
Special inspection requirement — Final
Joseph Jabour
05/08/2026
Special inspection requirement — Energy Code Compliance Inspections
Joseph Jabour
05/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
Joseph Jabour
05/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Jabour
05/08/2026
Special inspection requirement — Maintenance information
Joseph Jabour
05/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Joseph Jabour
05/08/2026
Special inspection requirement — Sprinkler Systems
Joseph Jabour
05/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Jabour
06/23/2025
Violation issued (FDNY_NOV, closed)
02/09/2023
Violation issued (FDNY_ORDER, closed)
02/09/2023
Violation issued (FDNY_ORDER, closed)
02/09/2023
Violation issued (FDNY_ORDER, closed)
05/13/2020
Violation issued (FDNY_NOV, closed)
07/08/2016
Violation issued (FDNY_NOV, closed)
03/31/2011
Violation issued (FDNY_NOV, closed)
10/02/2010
Violation issued (FDNY_NOV, closed)
01/28/2010
Violation issued (FDNY_ORDER, closed)
08/17/2000
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedThe Rockefeller University08/20/2026
DOB NOWGeneral ConstructionPermit IssuedThe Rockefeller University07/10/2026
1 project · most recent 07/24/2026
Air Conditioning Systems Others
FiledStatusContractorScopeMake / Model / Capacity
07/24/2026Permit IssuedThe Rockefeller UniversitAir Conditioning Systems, Others
Cooling
York XTI-69x57 8,400 CFM · Ahu ×1
Other
Greenheck GREENHECK BSQ-240HP 7,200 CFM · Exhaust Fan ×1
1 project · most recent 07/24/2026
FiledStatusContractorScope
07/24/2026——8 heads
2 projects · most recent 07/24/2026
Water/Sanitary
FiledStatusContractorScope
07/24/2026——Water/Sanitary
07/24/2026———
1 project · most recent 10/14/2020
FiledStatusContractorScope
10/14/2020CompleteTop Shelf Electric—
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
05/11/2026Electrical motors and elevatorsJoseph Jabourenergy_progress
05/08/2026Fire-Resistant Penetrations and JointsJoseph Jabourspecial
05/08/2026Fire-Resistant Penetrations and JointsJoseph Jabourspecial
05/08/2026Mechanical SystemsJoseph Jabourspecial
05/08/2026FinalJoseph Jabourprogress
05/08/2026Energy Code Compliance InspectionsJoseph Jabourprogress
05/08/2026HVAC-R and service water heating system controlsJoseph Jabourenergy_progress
05/08/2026HVAC-R and service water heating equipmentJoseph Jabourenergy_progress
05/08/2026Maintenance informationJoseph Jabourenergy_progress
05/08/2026HVAC-R and service water piping design and insulationJoseph Jabourenergy_progress
05/08/2026Sprinkler SystemsJoseph Jabourspecial
05/08/2026Fire-Resistant Penetrations and JointsJoseph Jabourspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Rockefeller University Main CampusEducationCellar
Project M01399686 Alteration · Approved · 07/24/2026
Project M01399707 Alteration · Permit Entire · 07/24/2026
Project M01399711 Alteration · Approved · 07/24/2026
Precision Instrumentation Technologies (pit)OfficeCellar
Project M01399670 Alteration · Permit Entire · 06/23/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/16/2026M01399670-I1Request digital key ↗
08/16/2026M01399711-I1Request digital key ↗
08/16/2026M01399686-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/16/2026M01399670-I1Open ↗
08/16/2026M01399711-I1Open ↗
08/16/2026M01399686-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/31/2026M01399686-I1Open ↗
08/28/2026M01399711-I1Open ↗
08/23/2026M01399707-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026M01399707-I1Open ↗
08/23/2026M01399707-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/16/2026M01399670-I1Open ↗
08/16/2026M01399711-I1Open ↗
08/16/2026M01399686-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/16/2026M01399670-I1Open ↗
08/16/2026M01399711-I1Open ↗
08/16/2026M01399686-I1Open ↗